19. Reports were submitted it the city and given to Storm
Drainage for their review. We have had additional
meetings with Storm Drainage and Natural Resources, and
are including an additional drainage study for Natural
Resources use.
20. Lot 1 is buildable when accessed from Redwood Street as
are the remaining lots south of them. Lot 2 we feel is
developable although more restricted than the adjacent
lot 3.
21. We have added this to site plan.
22. We concur with staff and are requesting only a
preliminary approval for the Third Filing at this time.
I hope this meets with your approval. I would like to
arrange a meeting with you as soon as possible to discuss
the submission for final approval with you.
Sin ly,
Edward G. Zdenek
5. We have met with Glen Schlueter the Storm Water Utility
and resubmitted our drainage information as a
preliminary in August 1993, responding to all of the
comments that apply to the preliminary and will address
all final comments in our final submission.
6. We have adjusted notes.
7. Trees will be located so as not to interfere with the
stated clearances and reflected on final decision.
8. Acknowledged
9. Agreed
10. We have made adjustments to reflect City Foresters
Concerns.
11. The Center at the south east corner of Willox Lane and
College Avenue has been approved for a shopping center.
12. We have amended our plan and the plat to reflect the
Solar Ordinance requirements.
13. We have added information on our resubmission.
14. We have changed notes based on our meeting with you.
15. - 18. All these items were addressed in a resubmission
in September, and we believe all concerns
regarding a preliminary submission have been
addressed.
,
October 6, 1993
GROUP
ARCHITECTURE City Of Fort Collins
Planning Department
281 N. College Ave.
Fort Collins, CO 80522
ATTN: Mr. Steve Olt
RE: Greenbriar Village Third Filing
Dear Steve,
We have met with the various agencies outlined in your July
22, 1993 letter to us and would like to continue our review
for this filing on your October 25, 1993 P&Z Meeting as a
preliminary PUD submission.
Your direct response to your comments are as follows:
1. We agree to provide adequate easement to include gas
line, and have discussed the fencing with Gary Heutt and
he concurs with our design solution. We will add
additional information to our final submission for this
filing, and resolve the row discrepancy at that time.
2. We agree to additional easements as requested by U.S.
West and will include them on our final submission.
3. Mapping comments are mostly as a result of our
submission as a preliminary and final. We have
addressed the items pertaining to the preliminary and
will change the items pertaining to the final when we
submit.
4. Rear lot easements have been added.
1220 South College