Loading...
HomeMy WebLinkAboutGREENBRIAR VILLAGE PUD THIRD FILING PRELIMINARY - 19 93D - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTNo Text it was verified with Lidstone Anderson that the detention Ponds have utilized "developed" criteria in the analysis, thereby guaranteeing that this development will have no unforeseen effect on the previous detention studies. Offsite flows contributing to the site proposed for Phase 3 are negligible. Glen, please feel free to call with any questions, comments or suggestions as ,you review the attached preliminary calculations. Very Truly Yours. Joseph P. Marcisofsky, P.E. July 6, 1993 Mr. Glen Schleuter Stormwater Utility City of Fort Collins PO Box 580 Fort Collins, Colorado 80522 Dear Glen, Attached is a Storm Drainage Report that accompanies the P.U.D. submittal for Greenbriar Village, Third Filing, which is directly east of the Greenbriar Village Second filing. This report is general in nature and more serves to present the logic behind the proposed means of stormwater collection and disposal. As with the Second Phase on the west side of Redwood Street, this third filing is located near to an established City of Fort Collins regional detention pond. The pond lies .just north of the proposed Filing 3 development, and in keeping with the current Master Drainage Plan for this region, all storm runoff from the site will be routed to this, the "Wetlands", detention pond. In keeping with provisions of the current drainage master plans, there will be no interbasin transfer of storm runoff to the adjacent basin east of Redwood Street. Due to the horizontal and vertical proximity between the existing detention pond and existing and proposed grades, only surface collection via pans and streets will be provided to discharge runoff to the pond, with the exception of one culvert that will carry runoff from the southern portion of Filing 3 nortwards to the "Wetlands" pond. A simple collection system will utilize street capacity and concrete trickle channels located in larger swales to collect site runoff for discharge into the existing detention pond. It should be noted that the existing detention pond, and the configuration proposed in the current masterplan is being studied for expansion to increase storage capacity in order to recieve some runoff from the Second Filing which originally was planned to be detained in the "Coachlite" detention pond. Lidstone Anderson has undertaken a study which reveals the feasibility of such an interbasin transfer and concluded that with modifications, the "Wetlands" pond could have sufficient capacity to detain the additional runoff originally planned to be detained in the "Coachlite" pond. The capacity of the existing detention pond has already taken into account that contributing areas would someday be developed and THIRD FILING July, 1993 Prepared For City of Fort Collins Stormwater Utility PO Box 580 Fort Collins, Colorado, 80522