Loading...
HomeMy WebLinkAboutOAKWOOD SCHOOL NCL SITE PLAN REVIEW - 13 93 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW14. A neighborhood meeting will be required before submittal. Please refer to the attached information sheet on Neighborhood Meetings. 5. Parks and Recreation suggest that you coordinate your use of City Park, with other schools and daycare centers in the area. 6. If you propose a commercial kitchen with fryers, a grill, etc. you will be required to install a grease trap. 7. The property is in the Old Town Basin for stormwater. Currently, there are no development fees for this basin. If you are proposing to add any paved surfaces, including the paving of the alley if you use it for access, you will be required to submit a grading and drainage plan prepared by a licensed engineer. You should also document on the site plan and include a letter in your submittal addressing the fact that you are/are not adding additional impervious surface and that you are/are not changing the.drainage flow patterns on the site. 8. Engineering will require that the alley be paved where you would be taking access, to the street. We can show you an example of the design that will be required to be submitted by an engineer. You may be able to convince your neighbors to pontribute to the cost of the paving, or the City will agree to write up a repay agreement, and if the other properties re- develop, there would be a possibility of getting some of the cost back. 9. You will be required to repair any damaged curb, gutter, or sidewalks and construct handicapped ramps at the intersection, if they are not already in place. 10. A traffic impact report should be submitted with your site plan. The report should document such things as: hours of operation, time of day when students arrive and leave, number of students and number of anticipated trips to and from the school at various times, access to the school, location of drop off points, parking requirements, bike parking, etc. 11. The driveway should be signed as one-way. 12. Poudre Fire Authority comments are similar to those of the Building Department's and are related to requirements in the building code. You should verify that there is a fire hydrant within 400' of the property. If there is not one, a fire hydrant will have to be installed. If the kitchen is upgraded to a commercial kitchen, grease hoods and ducts, would be required to be installed. 13. Fire sprinkler systems are not required, but there is a 5,000 square foot maximum area requirement for interior spaces that are not "contained" in terms of fire protection. Please contact Warren Jones at 221-6570 for more information. CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: December 14, 1992 ITEM: Church to private school conversion APPLICANT: Jim Mokler 1136 E. Stuart, Suite 4207 Fort Collins, CO 80525 LAND USE DATA: This is'a proposal to convert an existing church to a private school for approximately 60 to 90 elementary school students. The property is located at 1401 W. Mountain Avenue. COMMENTS: 1. There is existing.. overhead single phase electric power available. If you will be making any changes to the load or require an upgrade to the meter, power will have to be placed underground and Light and Power development charges would apply. There is no 3-phase power in the area. 2. The property is located in the NCL, Neighborhood Conservation - Low Density Residential Zoning District and is located within the area designated as Neighborhood Conservation in the City's adopted Westside Plan. I have enclosed relevant portions of these planning documents for your information. Planning would be reviewing this. proposal to see how it conforms to the policies of the neighborhood plan. 3. If you propose to submit this project as an NCL Site Plan for review by the.Planning and Zoning Board, please keep in mind that while the use is permitted, the building and lot must conform to current codes. This would include all current setbacks, including side setbacks (51), corner side setbacks (151), and front setbacks (151) as measured from the property line, not the ROW line. If these setbacks can not be achieved, you have the option of requesting variances from the Zoning Board of Appeals. You also have the option of submitting this request as a Planned Unit Development (PUD) to be reviewed against the criteria of the Land Development Guidance System. In this case, setback variances are included in the PUD review. 4. The change of use will trigger the need for a building permit. A certificate of occupancy would have to be issued for the new use. The normal building permit procedure should be followed, including submittal of 3 sets of building plans to the building department. The new use will be considered to be a new building and will have to conform to current code requirements. Please consult with Sharon Getz at the Building Department (221-6760) for more information. Commi y Planning and Environmental rvices Planning Department City of Fort Collins December 17, 1992 Jim Mokler 1136 E. Stuart, Suite 4207 Fort Collins, CO 80525 Dear Mr. Mokler: For your information, attached is a copy of the Staff's comments concerning Church to private school conversion, presented before the Conceptual Review Team on December 14, 1992. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application: Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Kirsten Whetstone Project Planner KW/gjt Attachments cc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer. Transportation Department Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750