HomeMy WebLinkAboutOAKWOOD SCHOOL NCL SITE PLAN REVIEW - 13 93 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICANT COMMUNICATION (3)04ERN ENGINEERING
Mr. Dick Hill
February,22, 1993
page 2
TEL � 303 221-4159
22,93 15:06 P.03
Northern proposes to provide this preliminary drainage study
for a fee of. We are prepared to begin work upon receipt
of a signed copy of this letter.
We 'look forward to working with you again on another project.
.If you have any questions or comments as you review this letter,
please feel welcome to contact this office.
Sincerely,
NORTHERN ENOINEERIN SERVICES, INC.
Michael
Acc'eptad''tih'ia �� day of t-e-es?tj 1993
by:
Dick H
��_ -� 11.
, Architecture Plus
y ERN ENGINEERING TEL N -03 221-4159
F 22,93 15:05 P.02
Northern Engineering Services, Inc.
February 22, 1993
Mr. Dick Hill
Architecture Plus
318 East Oak Street
Fort Collins, Colorado 80524
re: Oakwood School site
1401 West Mountain
Preliminary Drainage Study
Dear Dick:
At your request, Northern Engineering has prepared this
proposal to provide a Preliminary Drainage Study for the Oakwood
School site at 1401 West Mountain Avenue in Fort Collins.
After discussions with yourself and staff at the City of Fort
Collins, we feel that we can provide the required study in time for
a March 1 submittal deadline, if we start immediately.
Northern proposes to provide a Preliminary Drainage Report for
the Oakwood School site, located at 1401 West Mountain. Our work
would be to study the effect on stormwater runoff which would be
generated by paving approximately 88 feet of the alley adjacent to
the site. It is not anticipated at this time that any design of
drainage improvements will be required and such work is not
included.in this proposal.
It is undetermined at this time whether a preliminary grading
plan will be required. This proposal does not include site
grading, but we would be happy to provide such, if it is required,
under a separate agreement.
420 S. Howes • Suite 100 • Fort Collins. Colorado 80521 • (303) 221-4MR • fax (303) 221-4159
Arc,, iitecture Plus
Fort Collins, CO • Redmond, WA • Pleasant Hill, CA
Oakwood School, 1401 West Mountain Avenue
This is to confirm that a preliminary Drainage Study of the alley to
the South of the Oakwood School property is being carried out by
Northern Engineering of Fort Collins. Their report Should be ready for
submittal to the City by March 5th, 1993.
I attach a copy of the letter of agreement reached with Northern
Engineering for this service.
'Z�'�JAZ-
Dick Hill, A.I.A.
Architecture Plus
1 March, 1993
318 East Oak Street
Fort Collins • CO.80524
303/493-1220
member • american institute of architects