Loading...
HomeMy WebLinkAboutOAKWOOD SCHOOL NCL SITE PLAN REVIEW - 13 93 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICANT COMMUNICATION (3)04ERN ENGINEERING Mr. Dick Hill February,22, 1993 page 2 TEL � 303 221-4159 22,93 15:06 P.03 Northern proposes to provide this preliminary drainage study for a fee of. We are prepared to begin work upon receipt of a signed copy of this letter. We 'look forward to working with you again on another project. .If you have any questions or comments as you review this letter, please feel welcome to contact this office. Sincerely, NORTHERN ENOINEERIN SERVICES, INC. Michael Acc'eptad''tih'ia �� day of t-e-es?tj 1993 by: Dick H ��_ -� 11. , Architecture Plus y ERN ENGINEERING TEL N -03 221-4159 F 22,93 15:05 P.02 Northern Engineering Services, Inc. February 22, 1993 Mr. Dick Hill Architecture Plus 318 East Oak Street Fort Collins, Colorado 80524 re: Oakwood School site 1401 West Mountain Preliminary Drainage Study Dear Dick: At your request, Northern Engineering has prepared this proposal to provide a Preliminary Drainage Study for the Oakwood School site at 1401 West Mountain Avenue in Fort Collins. After discussions with yourself and staff at the City of Fort Collins, we feel that we can provide the required study in time for a March 1 submittal deadline, if we start immediately. Northern proposes to provide a Preliminary Drainage Report for the Oakwood School site, located at 1401 West Mountain. Our work would be to study the effect on stormwater runoff which would be generated by paving approximately 88 feet of the alley adjacent to the site. It is not anticipated at this time that any design of drainage improvements will be required and such work is not included.in this proposal. It is undetermined at this time whether a preliminary grading plan will be required. This proposal does not include site grading, but we would be happy to provide such, if it is required, under a separate agreement. 420 S. Howes • Suite 100 • Fort Collins. Colorado 80521 • (303) 221-4MR • fax (303) 221-4159 Arc,, iitecture Plus Fort Collins, CO • Redmond, WA • Pleasant Hill, CA Oakwood School, 1401 West Mountain Avenue This is to confirm that a preliminary Drainage Study of the alley to the South of the Oakwood School property is being carried out by Northern Engineering of Fort Collins. Their report Should be ready for submittal to the City by March 5th, 1993. I attach a copy of the letter of agreement reached with Northern Engineering for this service. 'Z�'�JAZ- Dick Hill, A.I.A. Architecture Plus 1 March, 1993 318 East Oak Street Fort Collins • CO.80524 303/493-1220 member • american institute of architects