Loading...
HomeMy WebLinkAboutRANCHWAY FEEDS BIN RENOVATION PUD PRELIMINARY AND FINAL - 14 93 - SUBMITTAL DOCUMENTS - ROUND 1 - SUPPORTING DOCUMENTATION0 Conservation Concerns at Ranch -Way Feeds Electrical Upgrades 1988--installed energy management system to monitor and control kilowatt demand.This controller sheds large motor for demand control. 1989--Lighting upgrade, installed 120 high pressure sodium fixtures. Replaced 271 incandescent fixtures. (All new lights in manufacturing area are explosion proof.) 1990--Replaced batch mixer with a new low energy mixer that eliminated 150 electrical horse power. 1992--Upgraded motor controls on 57 motors, the new equipment is electronic and will provide greater protection against motor overload. 1993--Upgraded outside lighting. Boiler Upgrades 1986--insulation was applied on boiler and steam pipes. 1987--upgrade to burner controls --for more efficient firina (programable logic controller) 1988--installed tubeulators for better fuel combustion 1989--installed controls to reduce steam pressure during non - production time to save fuel cost. 1992--installed automatic boiler blowdown to maintain maximum heat transfer. All steam condensation is recovered for boiler feed water as is blowdown. [dater Usage Ranch-Wav Feeds is a low water user. Water is primarily used for steam. Trash Management Ranch -Way Feeds also recylces paper feed sacks rather than taking them to the landfill.