Loading...
HomeMy WebLinkAboutBEST WESTERN TRANSMISSION PUD LOT 1 FINAL - 15 93A - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICANT COMMUNICATIONBest Western Transmissions on Lot 2. The following materials are enclosed for your Final P.U.D. review: Application (1 copy) Filing fee of $110.00 Final Site Development Plan (25 copies) Final Landscape Plan (16 copies) Final Utility Plan (1 copy) Architectural Elevations (3 copies) Drainage report and Grading & Drainage Plan (1 copy) Also attached to this letter please find a letter from Dick Rutherford at Stewart Engineering with regard to the Grading and Drainage Plan and Report. Should you have any questions regarding the content of this submittal, please feel free to call. Sincerely, j Alan Hauser, Architect Architecture One, P.C. cc: Larry Tomek, Midway Realty in:bwtfinal /%n@MUFK� �UQ[� ARCHITECTS/PLANNERS. P.C. ONE March 7, 1994 Mr. Ted Shepard, Senior City Planner City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522-0580 RE: Best Western Transmission P.U.D. Final P.U.D. Approval for Lot 1 Dear Ted, Per our recent telephone discussion, please accept the attached materials as the Final P.U.D. submittal for the above referenced project. Lot 1, the old Amoco Station on the corner property, received Preliminary P.U.D. approval on April 26, 1993. The use which the property owner, Larry Tomek of Midway Realty, has indentified for Lot 1 is an automobile emissions and quick-lube shop. It is anticipated that the existing building would be utilized as -is, without further modification at this time. This is consistent with the building exterior elevations which were submitted for Preliminary P.U.D. approval. The Site Plan for Lot 1 is essentially unchanged from the approved preliminary P.U.D. plan with the exception of two minor revisions: 1) It is being requested that the existing 30 foot wide drive cut onto Stuart Street be enlarged by 5 feet on its western edge to provide a 35 foot wide drive cut at Stuart Street. It is felt that this will make both ingress and egress at this location safer and easier. 2) An asphalt surfaced parking area approximately 12'x24' has been added directly to the south cf the existing structure to accommodate an occasional oversized vehicle (i.e. - truck or motorhome). The two proposed coniferous trees in this area have been deleted. Plantings would not do well in the area due to the height of the Best Western Transmission Shop. The final Grading and Drainage Plan, Report, and Overall Utility Plan are unchanged for Lot 1. These plans are in final form and are currently being reviewed by Engineering in conjunction with the building permit application for 150 EAST 29TH STREET PALMER GARDENS, SUITE 200 LOVELAND, COLORADO 80538 303/669-9060 FACSIMILE 303/669-9066