Loading...
HomeMy WebLinkAboutBEST WESTERN TRANSMISSION PUD LOT 1 FINAL - 15 93A - CORRESPONDENCE - STAFF'S PROJECT COMMENTS3 This concludes Staff comments at this time. Please note the following deadlines for the April 25, 1994 Planning and Zoning Board meeting: Plan revisions are due April 7, 1994. P.M.T.'s, to prints, renderings are due April 18, 1994. Please note that the Utility Plans, Drainage Report, Drainage and Grading Plans will be reviewed by the Mike Herzig and Kerrie Ashbeck of our office and comments may be forwarded to the consulting engineer under separate cover. The Development Agreement will be prepared our office after Utility Plans have been revised accordingly. As always, please call the Planning Department if you have any questions regarding these comments. Sincerely: -;��ek J44�� Ted Shepard Senior Planner xc: Kerrie Ashbeck, Civil Engineer be dedicated by separate instrument. Kerrie Ashbeck of the Development Review Section will process the dedication of this easement by separate legal instrument. 6. The request for the 35 foot wide curb cut on East Stuart Street will be allowed. 7. In lieu of losing two evergreen trees between the structures, it is recommended that one, 1 1/2 inch caliper Spring Snow Crab be added to the Stuart Street frontage between the intersection and the Hackberry. 8. Please add a note to the landscape plan that all landscape material, including that which is planted in the public right- of-way, is to be maintained by the owner. 9. Exterior walls located closer than 10 feet from property lines shall be on one -hour fire resistive construction with protected openings. No openings are permitted in walls located closer than five feet from property lines. Parapets extending 30 inches above the roof surface must be constructed in accordance with Section 1710 of the Uniform Building Code. 10. Exterior routes of travel and parking facilities for use by disabled persons shall be provided in accordance with the 1991 U.B.C. Appendix Chapter 31. 11. The P.U.D. site plan should make a distinction that this is the Final for Lot One. This could be done by adding "Lot One" to the title in the lower right corner of the sheet. In addition, a thick line should separate the two Lots. Site development data should refer to Lot One. A note should be added stating that there is a previously approved separate Final P.U.D. for Lot Two on file with the City of Fort Collins. Signage details for Best Western Transmission should be deleted. Note number seven should be deleted. 12. Is note number nine applicable for Lot One? 13. The owner's certification should include a notarial block. 14. The developer of Lot One is encouraged to work with the Planning Department and the developer of Lot Two in order to provide a unity of design for the free-standing signage along College Avenue. Since these are two lots of the same P.U.D., it is desirable to have a cohesion in signage design within such close proximity. It is suggested that areas of cohesion between the Best Western Transmission sign and the sign for Lot One could be found in terms of height, width, and use of common base material. Staff is willing to work with the applicant to find ways to promote design consistency within the P.U.D. in terms of signage that provides identification needs for the applicant. Commun...y Planning and Environmental S, Aces Planning Department City of Fort Collins March 30, 1994 Mr. Al Hauser Architecture One 150 East 29th Street, Suite 200 Loveland, CO 80538 Dear Al: Staff has reviewed the request for Final P.U.D. for Lot One of the Best Western Transmission P.U.D. at the southeast corner of South College Avenue and East Stuart Street. The following comments are offered: 1. Lot One will need to have a separate Utility Plan set with a separate Development Agreement. Otherwise, the plans and agreement for both lots must be combined and this may cause a timing setback for Mr. Flowers. It is our assumption that Mr. Flowers desires to seek a building permit for Lot Two as soon as possible and that waiting for Lot One approval on April 25, 1994 would be unacceptable. This Utility Plan set must include details on the removal and re -construction of the driveways on College Avenue. 2. As you are aware, the immediate corner of College and Stuart is to be re -constructed with the proper radius, sidewalk, ramps, and removal and replacement of the traffic signal mast, streetlight, and fire hydrant. These design details must be shown on the Utility Plans. 3. The City's Street Oversizing Fund will reimburse the developer of Lot One for improvements that are eligible to be paid for by the City. The City will not reimburse for improvements which are considered to be the obligation of the developer. The Development Agreement will specify which improvements will be paid for by the City, and which will not. Please note that the City will not act as the general contractor but will only disburse funds accordingly. The developer must act as the general contractor. 4. U.S. West cautions that any relocation of existing telephone facilities will be at the expense of the developer. 5. City of Fort Collins Light and Power Department will require a six foot wide easement along the east property of Lot One. Since this lot is already platted, this easement will have to 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750