HomeMy WebLinkAboutBEST WESTERN TRANSMISSION PUD LOT 1 PRELIMINARY LOT 2 PRELIMINARY AND FINAL - 15 93 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY4
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... stuart
NAME OF THE NORTH/SOUTH STREET....... access
NAME OF THE ANALYST .................. mJd
DATE OF THE ANALYSIS (mm/dd/yy)...... 2/16/93
TIME PERIOD ANALYZED ................. am pm 1993 +dev
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SB
---- ---- ---- ----
LEFT 0 5 5 --
THRU 250 275 0 --
RIGHT 5 0 5 --
NUMBER OF LANES
EB WB NB SB
--------------------- -----
LANES 1 1 1 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- -------- --------------------- ------------ ---
MINOR STREET
NB LEFT 6 471 469 > 469 > 463 > A
> 601 > 590 >A
RIGHT 6 838 838 > 838 > 832 >
MAJOR STREET
IWB LEFT 6 933 933 933 927 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... stuart
NAME OF THE NORTH/SOUTH STREET.... access
DATE AND TIME OF THE ANALYSIS..... 2/16/93 ; am pm 1993 +dev
OTHER INFORMATION....
1965 HCM: UNSIGNALIZED INTERSECTIONS -Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
stuart
NAME OF THE NORTH/SOUTH STREET.......
access
NAME OF THE ANALYST ..................
mJd
DATE OF THE ANALYSIS (mm/dd/yy)......
2/16/93
TIME PERIOD ANALYZED .................
am pm 1993 +dev
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
--------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
-
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 0 5 5 --
THRU 145 220 0 --
RIGHT 5 0 5 --
NUMBER OF LANES
-------------------------- ------------------------------------------
EB WB
NB SB
------ ------- - -----
LANES 1 1
-------
1 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c -_v LOS
p M SH R SH
------- -------- --------- ----------- ------------ ---
MINOR STREET
NB LEFT 6 581 579
RIGHT 6 945 945
MAJOR STREET
WB LEFT 6 993 993
> 579 > 573 > A
> 718 > 707 >A
> - 945 > 940 >
993 987 A
IDENTIFYING INFORMATION
---------------------------------
NAME OF THE EAST/WEST STREET...... Stuart
NAME OF THE NORTH/SOUTH STREET.... access
DATE AND TIME OF THE ANALYSIS..... 2/16/93 ; am 1993 +dev
OTHER INFORMATION....
I
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 40
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... best western access
NAME OF THE NORTH/SOUTH STREET....... college
NAME OF THE ANALYST .................. mJd
DATE OF THE ANALYSIS (mm/dd/yy)...... 2/16/93
TIME PERIOD ANALYZED ................. am m 1993 +d ev
OTHER .INFORMATION.... _
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
-------------------------------------------------------------------
EB W8 NB SB
---- ---- ---- ----
LEFT -- 0 0 0
THRU -- 0 1350 0
RIGHT -- 10 5 0
NUMBER OF LANES
-------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES -- 2 2 2
CAPACITY AND LEVEL -OF -SERVICE
Page-3
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------ ------------------------ ---
MINOR STREET
WB LEFT 0 85 85 85 85 E
RIGHT 11 449 449 449 438
MAJOR STREET
SB LEFT 0 189 189 189 189 D
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... best western access
NAME OF THE NORTH/SOUTH STREET.... college
DATE AND TIME OF THE ANALYSIS..... 2/16/93 : am pm 1993 +dev
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
xx:=:xx�����:��x:aac::a�x s�xsx:xx:z::•x:x:x:Gaza:a�x�:.aura:��r�xx:a��c:::�
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 40
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... best western access
NAME OF THE NORTH/SOUTH STREET......, college
NAME OF THE ANALYST .................. mJd
DATE OF THE ANALYSIS (mm/dd/yy)...... 2/16/93
TIME PERIOD ANALYZED ................. am pm 993 +dev.
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT -- 0 0 0
THRU -- 0 1270 0
RIGHT -- 5 10 0
NUMBER OF LANES
-----------------------------------------------
EB WB NB SB
------- ------- ------- -----
LANES -- 2 2 2
CAPACITY AND LEVEL -OF -SERVICE
Page-3
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------ -------- --------------------- ------------ ---
MINOR STREET
WB LEFT 0 98 98 98 98 E
RIGHT 6 471 471 471 466
MAJOR STREET
SB LEFT 0 211 211 211 211 C
IDENTIFYING INFORMATION
----------------------------------
NAME OF THE EAST/WEST STREET...... best western access
NAME OF THE NORTH/SOUTH STREET.... college
DATE AND TIME OF THE ANALYSIS..... 2/16/93 ; am pm 1993 +dev
OTHER INFORMATION....
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..stuart/college
AREA TYPE..... OTHER
ANALYST....... mid
DATE ......... L6/9
TIME......... pm
COMMENT....... 99� VOLUMES GEOMETRY
EB WB NB SB EB WB NB SB
LT 10 70 10 85 L 12.0 L 12.0 L 12.0 L 12.0
TH 10 5 1670 970 TR 12.0 TR 12.0 T 12.0 T 12.0
RT 15 150 55 5 12.0 12.0 T 12.0 T 12.0
RR 0 0 0 0 12.0 12.0 TR 12.0 TR 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
EB 0.00 1.00 N 0 0 0.90 30 Y 31.8 3
WB 0.00 1.00 N 0 0 0.90 30 Y 31.8
NB 0.00 1.00 N 0 4 0.90 30 Y 19.8 3
SB 0.00 1.00 N 0 4 0.90 30 Y 19.8 3
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 100.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X - NB LT X X
TH X TH X
RT X RT K
PD X PD X
WB LT X SB LT X X
TH X TH X
RT X RT X
PO k PC] X
GREEN 23.0 0.0 0.0 0.0 GREEN 6.0 55.0 0.0 0.0
YELLOW 5.0 0.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
-------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.040 0.250 21.6 C 21.7 C
TR 0.069 0.250 21.8 C
WB L 0.196 0.250 22.5 C 24.1 C
TR 0.457 0.250 24.8 C
NB L 0.049 0.690 3.8 A 12.1 B
TR 0.695 0.570 12.1 B
SB L 0.110 0.690 4.0 A 8.7 B
TR 0.391 0.570 9.1 8
--------------------------------------------------------------------------
INTERSECTION: Delay = 11.8 (sec/veh) V/C = 0.557 LOS = B
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..stuart/college
AREA TYPE ..... OTHER
ANALYST....... mid
DATE .......... 2/16/93
TIME.......... am p 1993 +dev
COMMENT.......
--------------------------------------------------------------------------
VOLUMES GEOMETRY
EB WB NB SB EB WB NB S8
LT 20 155 45 150 L 12.0 L 12.0 L 12.0 L 12.0
TH 15 20 1715 2360 TR 12.0 TR 12.0 T 12.0 T 12.0
RT 30 105 90 20 12.0 12.0 T 12.0 T 12.0
RR 0 0 0 0 12.0 12.0 TR 12.0 TR 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.
-------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
ES 0.00 1.00 N 0 0 0.90 30 Y 31.8 3
WB 0.00 1.00 N 0 0 0.90 30 Y 31.8 3
NB 0.00 1.00 N 0 4 0.90 30 Y 19.8 3
SB 0.00 1.00 N 0 4 0.90 30 Y 19.8 3
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X - NB LT X X
TH X TH X
RT X RT X
PD X PD X
WB LT X S8 LT X X
TH X TH X
RT X RT X
PD X PD X
GREEN 28.0 0.0 0.0 0.0 GREEN 8.0 60.0 0.0 0.0
YELLOW 5.0 0.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.067 0.273 22.5 C 22.7 C
TR 0.115 0.273 22.8 C
WB L 0.427 0.273 25.5 D 25.0 D
TR 0.330 0.273 24.5 C
NB L 0.054 0.673 4.6 A 14.1 B
TR 0.737 0.564 14.3 B
SB L 0.545 0.673 9.6 B 23.8 C
TR 0.964 0.564 24.6 C
--------------------------------------------------------------------------
INTERSECTION: Delay = 20.0 (sec/veh) V/C = 0.761 LOS = C
APPENDIX C
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
##########################################################################
INTERSECTION..stuart/college
AREA TYPE..... OTHER _
ANALYST....... mjd
DATE.......... 2/16/93
TIME......... am pm 1993 +dev
COMMENT.......
-------------------------------------------------------------------------
VOLUMES GEOMETRY
EB WB NB SB EB WB NB SB
LT 7 63 10 77 L 12.0 L 12.0 L 12.0 L 12.0
TH 6 2 1665 968 TR 12.0 TR 12.0 T 12.0 T 12.0
RT 14 148 51 3 12.0 12.0 T 12.0 T 12.0
RR 0 0 0 0 12.0 12.0 TR 12.0 TR 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
EB 0.00 1.00 N 0 0 0.90 30 Y 31.8 3
WB 0.00 1.00 N 0 0 0.90 30 Y 31.8 3
NB 0.00 1.00 - N 0 4 0.90 30 Y 19.8 3
SB 0.00 1.00 N 0 4 0.90 30 Y 19.8 3
------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 100.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X NB LT X X
TH X TH X
RT X RT X
PO X PD X
WB LT X SB LT X X
TH X TH X
RT X RT X
PD X PD X
GREEN 23.0 0.0 0.0 0.0 GREEN 8.0 55.0 0.0 0.0
YELLOW 5.0 0.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.027 0.250 21.5 C 21.6 C
TR 0.056 0.250 21.7 C
WB L 0.174 0.250 22.4 C 24.0 C
TR 0.444 0.250 24.6 C
NB L 0.049 0.690 3.8 A 12.0 B
TR 0.691 0.570 12.1 B
SB L 0.066 0.690 3.6 A 8.7 B
TR 0.389 0.570 9.1 B
-------------------------------------------------------------------------
INTERSECTION: Delay = 11.7 (sec/veh) V/C = 0.546 LOS = B
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INTERSECTION..stuart/college .
AREA TYPE ..... OTHER
ANALYST....... mJd
DATE.......... 2/16 93 993
TIME.......... am pm 1+dev
COMMENT.......
--------------------------------------------------------------------------
VOLUMES GEOMETRY
EB WB NB SB : EB WB NB SB
LT 18 150 43 144 : L 12.0 L 12.0 L 12.0 L 12.0
TH 12 17 1709 2357 : TR -12.0 TR 12.0 T 12.0 T 12.0
RT 29 104 86 16 : 12.0 12.0 T 12.0 T 12.0
RR 0 0 0 0 12.0 12.0 TR 12.0 TR 12.0
12.0 12.0 12.0 12.'
12.0 12.0 12.0 12.
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
EB 0.00 1.00 N 0 0 0.90 30 Y 31.6 3
WB 0.00 1.00 N 0 0 0.90 30 Y 31.8 3
NB 0.00 1.00 N 0 4 0.90 30 Y 19.8 3
SB 0.00 1.00 N 0 4 0.90 30 Y 19.8 3
-------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X NB LT X X
TH X TH X
RT X RT X
PD X PD X
WB LT X SB LT X X
TH X TH X
RT X RT X
PD X PD X
GREEN 28.0 0.0 0.0 0.0 GREEN 8.0 60.0 0.0 0.0
YELLOW 5.0 0.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.060 0.273 22.5 C 22.7 C
TR 0.106 0.273 22.8 C
WB L 0.409 0.273 25.3 D 24.9 C
TR 0.321 0.273 24.4 C
NO L 0.054 0.673 4.6 A 14.0 B
TR 0.733 0.564 14.2 B
SB L 0.509 0.673 8.7 B 23.4 C
VTR 0.962 0.564 24.2 C
---------------------------------------------�--_---------------_--------
INTERSECTION: Delay = 19.8 (sec/veh V/C 0.750 LOS C
APPENDIX B
M4ATTHEW J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 80538
TABULAR SUMMARY OF VEHICLE COUNTS
Observer Date 2/3/?-3 Dayo6z)A)aSbAycIty FOle T J 3 R = Right turn
S = Straight
INTERSECTION OF Ca LC= GG J�1 VE�tJUC^ AND �T U A2 T �'2��T L = Lett turn
TIME
BEGINS
CCO�r_c C'-�
n
l.c� �YC�
TOTAL
North
South'
STUA%�T
�TU4/2-r
TOTAL
East
West
TOTAL
ALL
tram NORTH
from SOUTH
tram EAST
from WEST
(
R I S
I L
I Total
I R I S I L I Total
I R I S I L I Total II
R I
S I L I Total
73e>
II o 12to
I it
I Z 21
II It 144-01 1 14_5Z
II 6-73 II43
t 1 i41 54s
111
1 3 15 1 q
16-7
I -74-0
74S
110 130 3
1(-131
Y
111-7,1s4513
IsCooll
'? 71 14L,I
U 1i5-1 (ol
IIC I
'1 10 I 1 II
lDZ II
941
11-3 WSIiq
124011s
3'a-G1+ 135'R
1163? IIZZ.10
Itol 3Z
11u
I k 1 1 I � II
40 11
��
t 5
110 I7-3 7
13 i
1 Z& 1?
112_0
Iz44-1 Z
131&
II 5 `s4- 113-7
1 t I Z4-1 (o Z
II 7 1
1 1 i 1 y
11 -7 1 II
(c, ss
11 1
I
I
II
I I
1
11
11 1 1 1
II
1 1 1
II 11
-73o-Mll3
19(K-
1 -7�
1104R
1161
1 r OSI 10
1 /-7Z(o117,7-7411141
2 I 317,13
11141
I 1 z7
112cv 11
3014
i I
I
I
I
I i
I
II
I I I I
II
I I I
I II
II I
I
I
II
I
I
I
II
I I I i
II
I I I
I
I
II I
I
I
II
I
I
I
II
II I I I
I
I I I
I II
II ►
I
I
I
t
►
II
I I I I
II
I i I
I
I
I I
I
I
II
I
I
I
II
I I I I
II
I I I
I
I
430114
14-c63lzt
1 SIZIzZ
43119
14-(o2-ll
9 7
Iz If 1 6 13r�1 70
11 (o
1 3 1 t 10
1 �aO II
1054
445-
II q Is77147I
34
117
44
11 Z_
47Tj1
I I I Z_
11Z,71 (p JZ:5 5(3
119
1 s 1 7 1 0,1
1 79 11
1191
6—O
3 I(s 12.41
Slzo4t71
144&11 1131
I271 3 15-o1 ?o
11(o
I z Is I )3
1 93 II1ZZ4
51�5_
I I(a -5714-3
1&g(.o11Z-
7
141z113
1452-11113(R'
IZI I Z 101 L3
119
1 Z, Is 1 1-5-1
-73 111
2I(o
I I
I
II
I
I
I II
I I I
I
I I
I II
430_5. 311(9Iz.35
I441Z517I(:�I(o11709I4311s531I435S
io4-I I I1501Z-7I
IIZ9I
I I18I 59
II3301I4to�s
APPENDIX A
u
1
N
TRIP DISTRIBUTION Figure 3
to
�
C-4 CD —150/105 N
Lo p1 aO 5/20 — 220/275
�,— 70/155 STUART /(— 5/5
10/20 --ot
) }
145/250
10/15 —
I
tn Lo o
5/5
I
15/30—�
o-�
to to
�0
W
C7
W
J
J
0
U
�-5/10
SITE
AM / PM
Rounded up to
nearest 5
vehlcules.
ao 0
1993 + SITE PEAK HOUR TRAFFIC Figure 4
A&
N
NO SCALE
STUART STREET
co i
N °
_ rExist. 8
(Service
N Station
L - UTUIR
v RETAIL
W —J °
°
W
W '
('j I BEST WESTERN
J i TRANSMISSION
_J o
SITE PLAN Figure 2
Table 1
1993 Peak Hour Operation
Intersection
College/Stuart (signal)
Table 2
Trip Generation
Level of Service
AM PM
B C
Daily
A.M.
Peak
P.M.
Peak
Land Use
Trips
Trips
Trips
Trips
Trips
in
out
in
out
Best Western Transmission
Repair
50
10
3
3
10
Specialty Retail - 1.2 KSF
50
4
4
3
3
Total
100
14
7
6
13
Table 3
1993 Plus Development Peak Hour Operation
Level of Service
Intersection AM PM
College/Stuart (signal) B C
College/Access
WB RT A A
Stuart/Access
NB LT/RT A A
WB LT A A
W
C9
W
J
J
0
U
r-
Lo
CN
00--148/104
r7 rn r�
2/17
�— 63/150
7/18
f r
6/12 - -►
m co
14/29 --,.
o P
r- Lo
Lo
to
co
r-
S
AM / PM
4
N
1993 PEAK HOUR TRAFFIC
Figure 1
Since traffic appears to be stabilizing at/near this
intersection, background traffic was not increased. The
current traffic in this area of College Avenue is near the
year 2010 projections shown in various city transportation
planning documents. Figure 4 shows the traffic assignment
with the background traffic. All turning movements were
rounded up to the nearest five vehicles.
Using the peak hour traffic shown in Figure 4,
operational analyses were performed on the key intersections.
The results of these analyses are shown in Table 3. All key
intersections are expected to operate acceptably. Calculation
forms are provided in Appendix C. The consolidated curb cuts
will improve the operation and safety along College Avenue and
Stuart Street. No auxiliary turn lanes are required at any
of the future curb cuts.
There may be times when the curb cut on Stuart Street is
blocked by the westbound left turns waiting at the College/
Stuart signal. This occurs with the existing traffic. There
is little that can be done to remedy this. It only affects
the northbound left turns exiting these properties. These
left turns have alternative routes via the right-in/right-out
access on College Avenue and via Mathews Street to the east.
Conclusions
From a traffic perspective, the proposed uses have little
impact in this area. The consolidated curb cuts on both
College Avenue and Stuart Street will improve both operation
and safety in this area.
I
Stuart is occupied by a former service station building. This
use is expected to change to a miscellaneous retail use. This
use is also addressed in this traffic study. The land to the
south of the proposed Best Western Transmissions is occupied
by a retail optical business.
The former service station property has two curb cuts on
Stuart Street. The proposed Best Western Transmission
property has two curb cuts on College Avenue. There is a
raised median in College Avenue which restricts all access to
College Avenue as right-in/right-out.
Proposed Development
The development proposal involves two properties as shown
in Figure 2. Best Western Transmissions is proposed to be
located on the south property. An unspecified retail use is
proposed to locate in the former service station building.
It is expected that this building will be remodelled to fit
the future use. It is proposed that the multiple curb cuts
on College Avenue and Stuart Street will be reduced to one on
each street. As shown in Figure 2, these curb cuts are as far
away from the College/Stuart intersection as is possible.
There will be access between the two properties.
Trip Generation, 5th Edition, ITE was used to estimate
the daily and peak hour travel from/to the northern lot.
Since no specific use is proposed, a miscellaneous retail use
was used. This trip generation is shown in Table 2. The
transmission repair use is not listed in Trip Generation, 5th
Edition. Therefore, the owner/developer was contacted to
supply repair order data from an existing shop in Fort
Collins. Between January 1990 and October 1992, there were
3182 repair orders. This averages to 94 per month. The shop
was open five days per week, Monday through Friday, from 7:30
AM to 5:00 PM. This averages about 5 repair orders per day.
There are no peak days, or peak hours within a given day.
There are four staff members. For trip generation purposes,
a conservative high estimate was made using this historic
data. It was assumed that three repairs would enter in the
morning peak hour and that three repairs would leave during
the afternoon peak hour. It was further assumed that each
repair would be followed by a companion vehicle to pick-
up/deliver the vehicle owner to another destination. It was
also assumed that the repair staff would arrive during the
morning peak hour and leave during the afternoon peak hour.
This trip generation is reflected in Table 2.
The trip distribution is expected to be primarily from/to
College Avenue as reflected in Figure 3. Some patrons will
access this site from the east leg of Stuart Street. The
traffic from the west leg of Stuart Street is expected to be
negligible.
W
d
s
c�
J
W
O
J
F^.
MEMORANDUM
G To: Russ Flowers, Best Western Transmission, Inc.
r Al Hauser, Architecture One
o Fort Collins Transportation Division
A Fort Collins Planning Department
M From: Matt Delich 4WJq��
Date: February 24, 1993
Subject: Best Western Transmissions Traffic Study
(File: 9308MEM1)
This memorandum documents the traffic analyses related
to the Best Western Transmissions and miscellaneous retail use
on two properties in the southeast quadrant of the College/
Stuart intersection in Fort Collins. These two properties
were addressed in the "College/Stuart Amoco Site Access
Study," September 1988. This memorandum serves as an update
of that site access study.
Existing Conditions
Since the previous site access study was prepared over
four years ago, new peak hour traffic data was obtained at the
College/Stuart intersection. This data is shown in Figure 1.
Raw data is contained in Appendix A. Comparing the 1993 data
with the 1988 data indicated the following:
1. On the Stuart Street east approach, traffic volumes have
z
not changed significantly in the morning peak hour.
R
2.
On the Stuart Street east approach, traffic volumes have
UJ
z
decreased in the afternoon peak hour.
CM
3.
Traffic volumes on the west approach of Stuart Street are
W
still low enough that they do not significantly impact
the operation of the intersection.
4.
In the morning peak hour, the traffic on northbound
•
College Avenue has increased by 25 percent and the
z
o
traffic on southbound College Avenue has increased by 45
percent.
c
5.
In the afternoon peak hour, both the northbound and
N
southbound traffic on College Avenue has not changed
a
significantly.
•
The College/Stuart intersection is signalized. During
`L
the
peak hours, it operates acceptably as is shown in Table
1.
Acceptable operation is defined as level of service D or
cc
�-
better. Calculation forms are provided in Appendix B.
The site of the proposed Best Western Transmissions is
currently vacant. The lot at the intersection of College and