Field density tests shall be made by the Engineer
on each layer of fill according to ASTM D1556,
D2167, or D2922. Tests shall be taken in the
compacted layer, below the disturbed surface. If
the tests show inadequate density, that layer or
portion of the layer shall be reworked until the
required density is obtained.
Fill material shall not be placed on frozen or
thawing ground, or during unfavorable weather
conditions. Fill operations shall not begin or
resume until the base, or previous fill, is
certified at the required density and moisture
content.
z
B. Description of Work
After the site to be filled has been properly
prepared, it shall be bladed until it is uniform
and free of large clods. The foundation for the
fill shall be brought to the proper moisture
content and compacted to not less than 95% of
maximum dry density, in accordance with current
ASTM D698, or to such other density as may be
determined appropriate for the materials and
conditions and acceptable to the Engineer.
Materials for fill shall consist of materials
selected or approved by the Engineer. The
materials shall be borrowed from sites selected or
approved by the Engineer, and shall be..free of
vegetation or other deleterious materials, and
shall not contain rocks or lumps larger than six
inches (611) in diameter.
The fill material shall be placed in uniform
layers and compacted to meet the requirements as
directed by the Engineer. Each layer shall be
thoroughly mixed to insure uniformity in each
layer. Compacted layer thickness shall be no
greater than six inches (611) unless approved
otherwise by the Engineer.
If the selected or approved fill material contains
rock, the maximum rock size shall be six inches
(611) in diameter. Care should be taken to insure
all voids are filled. No large rocks shall be
placed within twelve inches (1211) of the finished
surface.
Each layer shall be thoroughly compacted to the
specified density. The required density shall
normally be 95% of of maximum dry density, as
provided in accordance with ASTM D698. The
compacted density may vary according to the type
of material used, and will be specified by the
Engineer.
Compaction of the fill shall be such that a
uniform density is obtained. Compaction shall be
accomplished within 2% of the optimum moisture
content.
All slopes shall be compacted until the slopes are
stable, but not too dense to prohibit slope
control planting. Slope compaction may be done in
increments as the fill progresses or when the fill
is brought to its total height.
APPENDIX I
SPECIFICATIONS
FOR
PLACEMENT OF FILL MATERIAL
I. Site Preparation
A. Scope
This item shall consist of clearing and grubbing,
removal of existing structures, and preparation of
land to be filled, preparation of the site from
which the fill material is to be borrowed, and all
subsidiary work necessary to prepare the site to
be filled according to the plans and
specifications.
B. Description of Work
All timber, logs, trees, brush and rubbish shall
be removed and disposed of in a manner approved by
the Engineer.
All vegetation• and substantial amount of topsoil
shall be removed from the surface upon which the
fill is to be placed. The surface shall then be
scarified to a depth of at least six inches (G"),
and until it is free from such defects that would
hinder the uniform compaction by the equipment
used.
When fills are made upon hillsides or slopes, the
original ground shall be scarified deeply, or
benched, if slopes are in excess of five (5)
horizontal to one (1) vertical are encountered, or
as directed by the Engineer.
II. Placement of Fills
A. Scope
This item shall consist of compaction of the area
to be filled, backfilled, filling of the land,
compaction and control of the fill, and all
subsidiary work necessary to complete the grading
according to the plans and specification.
RESISTANCE R-VRLUE AND EXPANSION PRESSURE
OF COMPACTED SOIL
RSTrl - D 2844
CLIENT: CDS ENGINEERING
PROJECT: GR,EENBRIAR VILLAGE P.U.D.
LOCATION OF SAMPLE: ON -SITE SUBGRADE SAMPLE - T.H. 3 0 0.5+ - 5.0+
SAMPLE DATA
TEST SPECIMEN
1
2
3
COMPACTION PRESSURE
- PSI
0
40
SO
DENSITY - PCF
105.2
108.3
110.6
MOISTURE -
20.9
18.4
16.4
EXPANSION PRESSURE
- P:=I
0.00
0.00
0.12
HORIZO14TAL PRESSURE
@ 160 p_i
150
145
139
SAMPLE HEIGHT - in.
2.53
2.53
2.50
EXUDATION PRESSURE
- PSI
111
251
418
UNCORRECTED R-VALUE
3.5
5.8
9.0
CORRECTED R-VALUE
3.5
5.8
:'.0
R-VALUE AT 300 PSI E%,lUDATION PRESSURE = 6.9
. 1.00
13 F
w 6 4j
J
I
40
20
0 w
100
..............i............._.........................................>..........................i.............i..........
.......
;.............. _...........................
..........................
...............
............. .... ..... .... ;..............
..
i....... ... ............
........
.:..............i............._...........................:.............o...........................i............._..........
....... .......
....... _
. ............
................
.......... i............................
' �............ .j..............
....... ...... t..............:..............
i ....
...........................
i..... ...... ...............
s............
.v.............
......................... .............
... i...........................
h............. _...
.............. i..............
i.............
............. _.............
..............[.....................
..... ;............................
_.............
;.............. i...
l_1 l_1 —' -- 300 4 C10 5 Cl 0 6 L1 o 700 6 cl0
�
EXUDATION PF'ESSLIRE — psi
EMPIRE LFIBf-)F:HTORIES INC.
6
WC
LOG OF BORINGS
OSnKlYCl4
SI -
\\
\
5
i.
- - -
DePA Wa+er EhcouKiev-4 Dvr;inj Drillih9
DRAWING
NO.
CDS ENGINEERING CORPORATION
PROJECT
NO9�_ 7441
SYP "COLS AND SOIL PROPEP' IES
DIAGRAM NO. 1
SOIL AND ROCK SAMPLERS
CLAY (CL,OL,MH,CH,OH) CALIFORNIA
SILT (ML,OL) I THIN -WALLED
SAND (SW,SP,SM,SC) SPLIT BARREL
GRAVEL (G'.Y,GP,GM,GC) BAG SAMPLE
WEATHERED ROCK
PITCHER
SHALE & CLAYSTONE
JAR SAMPLE
SANDSTONE
PENETRATION RESISTANCE FOR COHESIONLESS SOILS ON STRENGTH CLASSIFICATIONS FOR COHESIVE SOIL
BASIS OF THE STANDARD PENETRATION TEST
NUMBER OF BLOWS
PER FT., N
0 - 4
4 - 10
10 - 30
30 - 50
OVER 50
RELATIVE DENSITY
VERY LOOSE
LOOSE
MEDIUM
DENSE
VERY DENSE
CONSISTENCY
COHESION, ICSF""
SOFT
LESS THAN 0.5
FIRM
0.5 - 1.0
STIFF
1.0 - 2.0
VERY STIFF
2.0 - 4.0
HARD
GREATER THAN 4.0
BLOWS PER FOOT - BLOW OF 140 LB,. EQUIVALENT TO PP/2 AND OU/2
HAMMER DROPPED 30 IN. TO DRIVE
2-INC. SPLIT -BARREL SAMPLER ONE
FOOT (ASTM DL586-67).
C,REEN 6RIAR VILLAGE PUD
W
oc
C4
v
la
LL
-rH 3
LU
a
3
2
LOCATION OF TEST BORINGS
DRAWN BY:� � DRAWING
® O,
90CATIOlq of TF,5T NO/-E
SCALE :I „_ N
TE:
PROJECT
5-as-93 _
CDS ENGINEERING CORP. p
N0.
in Appendix I of this report. Upon proper preparation of
the subgrade, the subbase and base course shall be placed
and compacted at or slightly above optimum moisture to at
least ninety-five (95) percent of standard proctor density
as determined according to ASTM D698.
It is recommended that the asphaltic concrete be placed
in maximum two to three (2-3) inch lifts at proper
temperature for the type of asphalt used.
All asphalt shall meet City of Fort Collins standards
and specifications and shall be placed in accordance with
these requirements. The crushed aggregate shall meet CDOH
specifications and have a minimum "R" Value of 78. Plant
mix bitumimous base shall have a minimum "Rt" Value of 90,
while the asphaltic concrete shall have a minimum "Rt" Value
of 95. Field density tests should be taken in both the base
course and asphalt under the direction of the geotechnical
engineer.
If you have any questions concerning this information,
please contact this office.
Sincerely,
CDS E O/RP—RATION
An on Wernsman, E.I.T.
P oject Engineer
Reviewed by*
John F. DonnellyA P.M. =_
-
. ..��A(C tee.\•
May 28, 1993
Mr. Jeff Laughren
965 Nantucket
Windsor CO 80550
RE: Pavement Design
Greenbriar Village P.U.D.
File: P92-7441
Dear Jeff:
Enclosed for your information is the data relating to
the pavement design on the above project. Included are the
recommended pavement thicknesses, boring logs and location
map, and "R" Value data.
It is our opinion that flexible pavements are suitable
for the proposed streets. The flexible pavement should
consist of asphaltic concrete underlain by crushed aggregate
base course. Using the City of Fort Collins "Design
Criteria and Standards For Streets": "R" Value of 6.9, a
twenty (20) year design life, an 18 kip equivalent daily
load application of 15, we recommend the following pavement
thicknesses:
Asphaltic Concrete 4"
Class 5 Aggregate Base Course 9"
13"
The subgrade below the proposed asphalt pavement should
be prepared in accordance with the recommendations discussed