Loading...
HomeMy WebLinkAboutFIRST CHRISTIAN CHURCH PUD PHASE IV PRELIMINARY AND FINAL - 51 93 - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGC- V i/ NEIGHBORHOOD INFORIIIATION MEETING Meeting Date: Attendees: Please sign this sheet. The information will be used to update the project mailing list and confirm attendance at neighborhood meetings. Contact the Planning Department (221-6750) if you wish to receive minutes of this meeting. Did You Receive Written Notification of this meeting? Correct ddress. Name Address Zip Yes No Yes No K- /1.tiK Lam!' cr t A C�- $ L:--,isr3a Qoa D2. G �d+- I� >� , f�8�"� �► a vi �10�3 a � 1 c�ee✓• fir' .sa G '/ �Ci'`� �.�+if5on Z$o7 PXvvkwood �r �U,S aS� ,/ ci LCi4�6 Lc�� I l C r0.. 11 Nt .5e�� E� r �iZ t c 10 e S�-" ,tJ F er ti rXAN ' Gt- U oa 4 �; . o 11, 'Alt, 77 0-7 M,�Z dktL e�� - Le�� A 9 .2 L/ a, G. c- 7 fJvmV- ./ AA C;�C Dom, r' .fir ;-70 - a-7Uo z � 40,a A � n 25. Question: Are there sites set apart just for parking of the busses? Answer: No, there are not at the present. 26. Comment: It looks like the only green area, at build -out, will disappear except for the northwest corner of the site and the playfield. 27. Question: What is the constant flow of water through the existing drainage channel and detention pond? 28. Question: Has the groundwater increased on this site over the years? 29. Question: Where does the water from this site go, to Lake Sherwood? Answer: Yes, it does. 30. Comment: There appears to be a concern about the driveway cut at the northeast corner of this site and its relationship to the curve on East Drake Road and the next street to the east. 31. Question: The sanctuary is going to be circular? Answer: Actually, it will be somewhat semi -circular. 32. Question: This development can go before the Planning Commission for a number of future reviews? Answer: Yes, it can go through a Planning and Zoning Board review for each separate phase. 33. Question: How long for build -out of the current proposed additions? Answer: The church has not determined that yet. 34. Question: Can you provide a full-time school without another City review and approval? Answer: That determination would have to be made when and if the church decides to offer a full-time school. 35. Comment: We are talking about numerous, on -going weekly day and night activities that will create a significant amount of continuous traffic. 15. Comment: I am still concerned about the height of the building elevation from Lemay Avenue. 16. Question: What is up for review now, just the two new additions? Will the sanctuary require another review in the future? Answer: Only the two additions are being considered for review now and the sanctuary phase will require another review. 17. Comment: The proposed additions will impact the views to the west, to the mountains. I gave up other amenities (lake front, open space, etc.) for my views. They will continue to erode. 18. Comment: The mass of the roof of the sanctuary does decrease as it approaches the center. 19. Question: What are the plans for the stoplight that will have to be installed to control the traffic with the additional traffic numbers? Answer: There are no plans for a stoplight associated with the church site and expansions. This is an unfounded assumption that the numbers will increase significantly. 20. Question: With the education addition, will the church want to compete with the existing schools? Answer: No, we do not want to compete at the present time. 21. Question: The intensive landscaping planned for the curved wall of the atrium will have to be eliminated or relocated in the future? Answer: Yes, that is correct. The landscaping will have to be adjusted with the sanctuary addition. 22. Question: Is this land solid or is this site a landfill? Answer: The land under this site is solid. 23. comment: I have serious concerns about the amount and speed of traffic on East Drake Road, primarily. 24. Question: Is the present location of the sanctuary pretty much determined, is it set in stone? Could it be moved to the north and west part of the site? Answer: The sanctuary location is set based on the logical building addition progression already established. 5. Question: Is there a building height limitation in the City? Answer: Yes, there is a 40' height limit unless a variance is granted. 6. Question: Was the entire site approved in 1979 for all of the buildings and site improvements? Answer: The site received overall master plan and preliminary approval for the entire site and final approval for Phase I, being 54,000 square feet of floor area, in 1979. 7. Comment: We have concerns about buying a home without being aware of future expansion plans for the church. 8. Question: What is your timeline for build -out of the site? Answer: The church has not yet determined a build -out schedule. 9. Question: Will the parking configuration change with future expansion? Answer: No, it is not intended to change. The parking was originally designed for the build -out of the entire site. 10. Question: How close is the parking to the homes to the east? I thought the driveway along the east property line was to be eliminated. Answer: The existing parking and driveway is approximately 515' from the rear property lines of the homes. A driveway along the east property line is not part of the overall site plan for the church. 11. Comment: There was a concern about users other than church members on the easterly driveway during off -times for church services. 12. Comment: Would it not make more sense to switch the parking lot and the open/play field to create more of a buffer to the homes to the east. 13. Question: Is the height variance study and review part of the public record? Answer: Yes, it is. 14. Comment: The first plan had apartments for senior citizens. When the apartments were eliminated, I thought the parking and driveway were eliminated. Commux..q Planning and Environmental ..�rvices Planning Department City of Fort Collins Neighborhood Information Meeting Minutes for the FIRST CHRISTIAN CHURCH, PHASE IV EXPANSION Date: July 7, 1993 Applicant: First Christian Church 2700 South Lemay Avenue Fort Collins, Colorado City Planner: Stephen Olt The First Christian Church is wanting to receive approval for future expansion of the existing church at South Lemay Avenue and East Drake Road. The proposal is for an additional 16,000 square feet of floor space. The purpose of this meeting was to introduce the applicant, being representatives of the First Christian Church, to the affected property owners and other potentially affected interests in attendance and enable them to ask questions about and express their concerns or support for the proposed church expansion. The following questions, concerns, and responses were expressed at the meeting: 1. Question: Will the additions to the church increase the tax base for this site and the adjacent areas, such as the neighborhoods? 2. Question: Is the church tax exempt? Answer: Yes, it is. 3. Question: What is the diameter of the sanctuary and how will it relate to Lemay Avenue? How far will it be from the street? Answer: I do not know the answer to the first part of the question but with these additions the church will be approximately 380' from Lemay Avenue. With the complete build -out of future phases the church would be approximately 235' from Lemay Avenue. 4. Question: What will the height of the sanctuary be? Answer: It is proposed to be 62' to the top of the sanctuary and 105' to the top of the tower. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750