Loading...
HomeMy WebLinkAbout405 SCOTT AVENUE CARRIAGE HOUSE PDP AND FDP - FDP190019 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWless) for any LED light fixtures is preferred. Please also consider fixtures with motion -sensing or dimming capabilities so that light levels can be adjusted as needed. Site light sources shall be fully shielded and down -directional to minimize up -light, light spillage and glare [see LUC 3.2.4(D)(3)]. Thank you in advance for supporting City of Fort Collins Night Sky Objectives. For further information regarding health effects please see: http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/ UR: Three wall mounted fixtures only meeting these standards. DONE. 3. Our city has an established identity as a forward -thinking community that cares about the quality of life it offers its residents now and generations from now. Thus, the City of Fort Collins has many sustainability programs and goals that may benefit this project. Of particular interest may be the: 1) Solar Rebate Program: www.fcgov.com/solar, contact Rhonda Gatzke at 970-416-2312 or rgatzke@fcgov.com 2) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary Schroeder at 970-224-6003 or gschroeder@fcgov.com UR: Noted Department: Traffic Operations Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com 1. Traffic Operations has no comments. Construction of one approved single family dwelling generates very little traffic and as such per chapter 4 of Larimer County Urban Area Street Standards (LCUASS) any requirements for a traffic impact study are waived. UR: DONE Department: Technical Services Contact: Jeff County, 970-221-6588, (county@fcgov.com 1. As of January 1, 2015, all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. Please contact our office for up to date Benchmark Statement format and City Vertical Control Network information. UR: Noted. DONE. 2. If submitting a replat for this property/project, addresses are not acceptable in the Subdivision Plat title/name. Numbers in numeral form may not begin the title/name. Please contact our office with any questions. UR: Noted. DONE. 3. FIRE SPRINKLER SYSTEM Should the applicant chose to use a fire sprinkler system please contact Assistant Fire Marshal, Jerry Howell with any fire sprinkler related questions at 970-416-2868. UR: Noted 4. HYDRANT >A hydrant producing 1000gpm at 20psi residual pressure is required within 400ft of this residence. >This is fulfilled by the hydrant located at Magnolia and Scott however, it is the applicant's responsibility to verify the flow. Please contact Fort Collins Utilities for assistance. UR: Noted 5. ADDRESSING/WAYFINDING >To assist with prompt emergency response, the address will be clearly visible from the street on both residences. >Additionally, wayfinding signage shall be placed to indicate the best route to the carriage house. UR: Noted. Carriage House Sign will face the alley on the west side. Department: Forestry Contact: Nils Saha, nsaha@fcqov.com 1. INFORMATION ONLY There are existing trees on site. Forestry recommends retaining and protecting significant trees to the extent reasonable feasible. UR: Noted. 2. INFORMATION ONLY Pertaining to question posed regarding tree proximity to construction site: Construction activity should take place outside of the dripline of the tree. Dripline is defined as a vertical line from the outer edge of the tree canopy to the ground. Additionally, horse chestnut trees can reach a height of 40-60 feet with a mature canopy width of 25-40 feet. We would recommend considering these spacing requirements in the placement of the carriage house. UR: Noted Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com 1. City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent reasonably feasible, all plans be designed to incorporate water conservation materials and techniques. This includes use of low -water -use plants and grasses in landscaping or re -landscaping and reducing bluegrass lawns as much as possible. Native plants and wildlife -friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are also encouraged. Please refer to the Fort Collins Native Plants document available online and published by the City of Fort Collins Natural Areas Department for guidance on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants20l3.pdf. Also see the City of Fort Collins Plant List : https://www.fc-gov.com/forestry/plant list.pdf. UR: Noted 2. Note in regard to outdoor lighting, especially LED light fixtures, cooler color temperatures are harsher at night and cause more disruption to circadian (biological) rhythms for both humans and wildlife. Warmer color temperature (warm white, 3000K or Department: Electric Engineering Contact: Cody Snowdon, 970.416.2306 csnowdon@fcgov.com 1. The existing lot is currently served with a single #4TCU from the alley, which has the capacity of 125 amps. There is a Secondary Box in the alley that could be used to extend an additional service to the property if additional capacity is required. UR: Noted 2. The Carriage House would be required to be individually metered. The meter location will need to be coordinated with Light and Power. Please refer to Section 8 of the Electric Service Standards for addition requirements for metering. A link has been provided below. https://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FI N AL_18November2016_Amendment.pdf UR: Noted 3. FEES (standard comment): Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees related to this project: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees UR: Noted 4. Please contact Cody Snowdon with Light & Power Engineering if you have any questions at (970) 416-2306. UR: Noted Department: Fire Authority Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.ora 1. 2018 IFC CODE ADOPTION Poudre Fire Authority and the City of Fort Collins (Town of Timnath, Larimer County) are in the process of adopting the 2018 International Fire Code. Code adoption is anticipated in early 2019. Building plan reviews shall be subject to the adopted version of the fire code in place at the time of plan review submittal and permit application. UR: Noted 2. UPDATE 03/07/2019 The applicant may be investigating other access options from Magnolia St to the north and possible access from the Church parking lot to the south. ACCESS >Access is required to within 150ft of all portions of the exterior perimeter of the proposed carriage house. This can be measured from Scott Avenue because it is an unclassified street. >However it is approximately 130ft out of this required measurement and alleys cannot be used for access. >This access can be achieved by establishing a fire lane onto the property however this property does not allow this with the existing buildings. >This out of compliance condition may be mitigated if the carriage house is designed with an approved fire sprinkler system. This requires the approval of the fire marshal. UR: Noted. Client has worked out Supply, Access, and Sprinkler direction for approval w/ PFA require a higher degree of water quality treatment with one of the two following options: UR: Noted 1. 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. 2.75% of all newly added or modified impervious area must be treated by LID techniques. 9. FEES (standard comment): The 2019 city wide Stormwater development fee (PIF) is $8,217/acre for new imperious area over 350 square feet and there is a $1,045/acre of site review fee. No fee is charged for existing imperious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov. com/utilities/business/b u ilders-and-developers/plant-investment-deve to pment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. If there is also an erosion control escrow it would be required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. Monthly fees - http://www.fcgov.com/utilities/business/rates UR: Noted Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com Larimer County Road Impact Fees and Transportation Expansion Fees are due at the time of building permit. Please contact Kyle Lambrecht at 221-6566 if you have any questions. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please reach out to your Development Review Coordinator. You can also see: http://www.fcgov.com/engineering/dev-review.php UR: Noted 2. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. All public sidewalk, driveways and ramps, existing or proposed, adjacent or within the site, need to meet ADA standards. If they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. UR: Noted 3. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: https://www.larimer.org/engineerinq/streets UR: Noted 4. Utility plans may be required and a Development Agreement may be recorded once the project is finalized. UR: Provided. 5. In regard to construction of this site, the public right-of-way shall not be used for staging or storage of materials or equipment associated with the Development, nor shall it be used for parking by any contractors, subcontractors, or other personnel working for or hired by the Developer to construct the Development. The Developer will need to find a location(s) on private property to accommodate any necessary staging and/or parking needs associated with the completion of the Development. UR: Noted erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seem not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit issuance any issues arise please email erosion@fcgov.com to help facilitate getting these permits signed off. UR: Noted 2. MASTER PLAN AND CRITERIA COMPLIANCE (site specific comment): The design of this site must conform to the drainage basin design of the Old Town Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual. UR: Noted 3. DOCUMENTATION REQUIREMENTS (site specific comment): A drainage report and construction plans are required and they must be prepared by a Professional Engineer registered in the State of Colorado. The drainage report must address the four -step process for selecting structural BMPs. UR: DONE 4. STORMWATER OUTFALL (site specific comment): Drainage into alleys in the Old Town Basin can be problematic, causing damage to downstream and neighboring properties. As part of any construction with this development, a drainage analysis will need to be completed by a Civil Engineer addressing any additional drainage created by the development and may be required to show how conveyance of site drainage is conveyed to an adequate public facility without impacting downstream properties. UR: Noted, See Civil Letter & Drawings 5. IMPERVIOUSNESS DOCUMENTATION (standard comment): It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. UR: DONE 6. DETENTION REQUIREMENTS (site specific comment): When improvements are being added to an existing developed site, onsite detention is only required if there is an increase in impervious area greater than 5000 square feet. If it is greater, onsite detention is required with a 2-year historic release rate for water quantity. UR: Noted 7. STANDARD WATER QUALITY REQUIREMENTS (site specific comment): If there is an increase in impervious area greater than 1000 square feet, fifty percent of the site runoff is required to be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual, Volume 3-Best Management Practices (BMPs). (http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-gui delines-regulations/stormwater-criteria) Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. UR: Noted 8. LID REQUIREMENTS (site specific comment): If there is an increase in impervious area greater than 1000 square feet, Low Impact Development (LID) requirements are required on all new or redeveloping property which includes sites required to be brought into compliance with the Land Use Code. These http://www.colocode.com/ftcollins/landuse/begin.htm. UR: Noted 12. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. UR: Noted 13. Please see the Submittal Requirements and Checklist at: http://www.fcgov.com/developmentreview/applications.php. UR: Noted 14. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. Your Coordinator will provide you with an estimate of these fees with the final conceptual comment letter. 15. When you are ready to submit your formal plans, please make an appointment with Your Development Review Coordinator. UR: DONE Department: Water -Wastewater Engineering Contact: Shane Boyle, 970-221-6339, sbovle@fcgov.com 1. WATER AND SEWER SERVICE (standard comment): It is allowable to connect the carriage house water and sewer services to the services for the existing house. For water service, the fire suppression system may dictate whether the existing service is adequate to provide service to both houses. UR: Noted 2. WATER CONSERVATION (standard comment): The water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: htt�://www.fcclov.com/standards UR: Noted 3. FEES (standard comment): Development fees and water rights will be due at building permit. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov.com/utilities/b usi ness/b u ilde rs-and-developers/plant-investment-develo pment-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. UR: Noted Department: Stormwater Engineering Contact: Shane Boyle, 970-221-6339, sbovle@fcgov.com Contact: Jesse Schlam, 970-218-2932, Ischlam@fcqov.com 1. INFORMATION ONLY: No Comment from Erosion Control. Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 31-1:1 V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now apply, erosion control materials should be submitted. Though the project at this time requires no 3 2. It is unclear how much yard space will be provided to carriage house but please make sure that there is at least 120 SF that is 10 feet in its smallest dimension. The deck does not count toward this metric. UR: more than 120sf is provided. Done. 3. Only one additional parking space is required at a dimension of 9'x19'. A wheel stop will be required at the edge of the parking space. a reduction in the'proposed new parking' width could help establish a yard and space for landscaping between the parking and proposed deck. UR: Done 4. It appears that the way the building is oriented that it may have issues meeting the north side property line 1' setback for 1' height increase as described under'Solar Access Setbacks'. This may potentially be solved if the building was rotated counterclockwise 90 degrees. UPDATE: For north lot line setbacks / building height please visit 4.7(E)(4) for more information. https://library. municode.com/co/fort_collins/codes/land_use?nodeld=ART4Dl_DIV4.7NECOLODEDI L UR: building moved south, north wall lowered to comply. DONE. 5. It was mentioned in the application that the intent for the carriage house is to be used for guests. For your information 405 Scott Avenue is located outside the Short Term Rental boundaries established by City Council, therefore, this project would not be supported by staff. UPDATE: Clarification has been made that the carriage house would be used on a long-term basis. UR: DONE. 6. Due to some of the stormwater requirements that will be activated with an increase of impervious surface > 1,000 SF, consider a design that expands the footprint and adds another story to the existing garage or that reduces proposed increase in impervious surface. See stormwater comments for more information. UR: See Civil Dwgs, DONE. 7. Maximum square feet for carriage house: ■Allowable square footage of carriage house: 800 square feet - unless carriage house ■Maximum carriage house footprint: 600 square feet Floor area shall include all floor space within the basement and first floor plus that portion of the floor area of any second story having a ceiling height of at least seven and one-half (7'/2) feet. UR: No basement, 600sf footprint 151, 200sf > 7.5' 2°d floor. 8. Eave Height: Please keep in mind when orienting the building along the lot line that the eave height cannot exceed thirteen feet from grade. UR: Noted. DONE. 9. The proposed development project is subject to a Type 1 review and public hearing, the decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to notify your neighbors of the proposal, please let us know. Your Development Review Coordinator would help you in setting a date, time and location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid potential hiccups that may occur later in the review process. UR: Noted, not desired. 10. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. UR: Noted 11. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at 2 Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 • fax rcgov.com March 08, 2019 Carolyn Haddad Re: 405 Scott Ave Carriage House Description of project: This is a request to build a carriage house at 405 Scott Ave (parcel #9710425005). Access is taken from Scott Ave to the east and a rear alley to the west. The property is within the Neighborhood Conservation, Low Density (NCL) zone district and is subject to Administrative (Type 1) Review. Please see the following summary of comments regarding your proposed Carriage House. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, please contact your Development Review Coordinator, Brandy Bethurem Harras, at 970.416.2744 or bbethuremharras@fcgov.com. Your Coordinator will be your main point of contact as you progress through the Development Review Process, Building Permit, and construction of your project. Comment Summary: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com 1. This project is located in the Old Town Neighborhood Plan (OTNP) area. Please reference the document to see how your project aligns with the intent of the plan. At time of submittal a narrative will be required that identifies which applicable objectives of the OTNP that your project is meeting. Please also visit the Old Town Design Guidelines (pp 89-91) for guidance with design of the carriage house. Primary takeaways are: ■Design the mass, form and roof shape to be compatible with the primary building and surrounding historic context. (Think about eves, roof pitch, windows and siding) ■Use materials that are similar in color, texture and scale to the primary building. ■The building should be subordinate in size. UR: Noted