HomeMy WebLinkAboutFORT COLLINS JEEP - FDP170035 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSDepartment: Traffic Operat,.,n Contact: Tim Tuttle, TTUTTLE@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/22/2017 12/22/2017: The proposed gates at the access points appear to block the sidewalk when opened. The gates should be installed so that they do not swing into the right of way or obstruct the sidewalks. Comment Number: 2 Comment Originated: 12/22/2017 12/22/2017: Signing and striping comments if any will be provided at the Staff Review meeting. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wiamargue@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/27/2017 12/27/2017: Please add the size of the wet tap for the domestic service of 1 1/2 inches. Comment Number: 2 Comment Originated: 12/27/2017 12/27/2017: There is shrubs proposed on top of the water meter. Please provide 4 feet of separation. Comment Number: 3 Comment Originated: 12/27/2017 12/27/2017: Please place the gate valve for the fire service directly onto the tee. The 5 feet of pipe is not needed. Comment Number: 4 Comment Originated: 12/27/2017 12/27/2017: Please label "w/ TB" for the 90 degree bend on the fire service. Comment Number: 5 Comment Originated: 12/27/2017 12/27/2017: Please add the plan view detail of the water meter which is Detail 16B. Department: Zoning Contact: Marcus Glasgow, 970416-2338, mglasgow@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/21/2017 12/21/2017: Building elevations are required as part of the final plan. 9 Comment Num"e: 13 . omment Originated: 12/26/2017 12/26/2017: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 14 12/26/2017: There are text over text issues. See redlines. Topic: Landscape Plans Comment Number: 10 12/22/2017: There are line over text issues. See redlines. Topic: Plat Comment Number: 1 Comment Originated: 12/26/2017 Comment Originated: 12/22/2017 Comment Originated: 12/22/2017 12/22/2017: It has come to our knowledge that our redlines have not been provided to the Surveyor. ALL Plat redlines for the project have been emailed directly to the Surveyor. Please make changes as marked on previous redlines provided. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Topic: Site Plan Comment Number: 2 Comment Originated: 12/22/2017 12/22/2017: The legal description is not necessary. Lot 1, Fort Collins Jeep would be adequate. Comment Number: 3 Comment Originated: 12/22/2017 12/22/2017: Please remove the portion of the legal description as marked. The Surveyor's Certificate, and the Civil Engineer's Statement should also be removed, unless required by another Department. See redlines. Comment Number: 4 Comment Originated: 12/22/2017 12/22/2017: Some of the sheets in the sheet index are not included in the plan set. See redlines. Comment Number: 5 Comment Originated: 12/22/2017 12/22/2017: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 6 Comment Originated: 12/22/2017 12/22/2017: There are line over text issues. See redlines. Comment Number: 7 Comment Originated: 12/22/2017 12/22/2017: Some of the Subdivision Plat labels shown are incorrect. If they are going to stay on the plan, they need to match the recorded Subdivision Plats. See redlines. Comment Number: 8 Comment Originated: 12/22/2017 12/22/2017: There are cut off text issues. See redlines. Comment Number: 9 Comment Originated: 12/22/2017 12/22/2017: Please provide definitions in the legend for the Easement abbreviations. 8 note should clear, specify the hours of the dimming as the refe. , ice to after- hours is vague. Comment Number: 5 Comment Originated: 12/22/2017 12/22/2017: Please have the lighting designer call me to discuss the B-U-G ratings. Since the site does not adjoin a residential area, we are more concerned about the Glare ratings than the Backlight ratings. Comment Number: 6 Comment Originated: 12/22/2017 12/22/2017: For the screen wall along Mason Street, the detail indicates the c.m.u. is to match, color, charcoal gray. Please provide a more specific reference as to what this color is matching and where it occurs on the building. Comment Number: 7 Comment Originated: 12/22/2017 12/22/2017: Regarding the bollards, the note on the Site Plan needs to clearly state that these are to be painted Desert Tan. Or, instead of a note, you could a small detail to sheet L-2. Comment Number: 8 Comment Originated: 12/22/2017 12/22/2017: For the vinyl -clad chain link fencing, please specify the color of the vinyl. Staff recommends either black or dark green. Comment Number: 9 Comment Originated: 12/22/2017 12/22/2017: Regarding the area west of the tracks,.the site plan includes this area but the plat does not. This needs to be reconciled one way or the other. If this area is not included, and the Jeep dealership stores vehicles west of the tracks, then this would be a zoning violation. Comment Number: 10 Comment Originated: 12/22/2017 12/22/2017: A set of architectural elevations are needed prior to submittal of final mylars. The purpose of submitting a set for Final Plan review is to make sure that there are no undue delays at the time of recording the final mylars. Comment Number: 11 Comment Originated: 12/22/2017 12/22/2017: For the mylars, please remove all ghosted layers. While these layers are helpful for plan review, they are not necessary for the final plans that are to be recorded. Also, the Existing Conditions Plan sheet, again helpful, but will not be needed for mylars. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcqov.com Topic: Erosion Control Comment Number: 1 12/18/2017: Erosion Control Comments Resolved. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcqov.com Topic: Construction Drawings Comment Originated: 12/18/2017 Comment Number: 11 Comment Originated: 12/26/2017 12/26/2017: There are issues with the benchmarks. See redlines. Comment Number: 12 Comment Originated: 12/26/2017 12/26/2017: There are line over text issues. See redlines. 7 Comment Num., r: 4 ,.omment Originated: 12/25/2017 12/25/2017: ON -SITE HYDRANT PFA is requesting information to determine if the hydrant is being maintained as a public or private hydrant. Please confirm. Private hydrants require separate approval and permitting by the fire authority. Comment Number: 5 Comment Originated: 12/25/2017 12/25/2017: KEY BOXES REQUIRED > IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in an approved, exterior location (or locations) on every new or existing building equipped with a required fire sprinkler or fire alarm system. The box shall be positioned 3 to 7 feet above finished floor and within 10 feet of the front door, or closest door to the fire alarm panel. Box size and location to be determined at time of building permit. Department: Planning Services Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/22/2017 On the Landscape Plan, there are 10 variegated maiden grass located between the screen wall along Mason Street and the parking lot. There appears to be sufficient area to continue this sequence of plants to the south to the landscape island at the corner instead of leaving this highly visible area without any plant material and simply treated with cobbles. Comment Number: 2 Comment Originated: 12/22/2017 12/22/2017: There are several landscape islands that also include light fixtures. Over time as the trees mature, the illumination from these fixtures will diminish. Staff recommends that the light fixtures be placed independent of the landscape islands. Please note that if, over time, trees are removed for the benefit of the illumination, such removal would constitute a zoning violation. Comment Number: 3 Comment Originated: 12/22/2017 12/22/2017: Regarding the location of the electrical transformer, the applicant is reminded to submit the C-1 Form to Light and Power. If a new transformer is needed, then please note on the Landscape Plan the new location closer to the east side of the building. Also, be sure to provide the proper clearances required by Light and Power. In the location of the existing transformer, please provide an increased number of shrubs to fill the island at maturity. Comment Number: 4 Comment Originated: 12/22/2017 12/22/2017: On the Lighting Plan, the note that indicates that fixtures will be dimmed after hours of operation needs to be more specific. This aspect of the site operations needs to be more specific. The note must also refer to the 10-volt wireless dimming system that will connect to modules on the fixtures that was described at P.D.P. Also, please indicate the extent to which the fixtures will be dimmed. For example, for recent project along an arterial street, the lighting design called for dimming to 50% of full illumination levels. And, the 9 Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/20/2017 12/20/2017: Site plan states "Relocate closer to building if anew transformer is required". If the transformer is to be moved closer to the building, please provide a 9' x 9' pocket easement for the transformer and an easement for the primary line to the transformer. Please reference Light & Powers Electric Service Standards at the following link for clearances from the building. http://www.fcgov.com/utilities/business/builders-and-developers/development-fo rms-guidelines-regulations Department: PFA Contact: Jim Lynxwiler, 970-416-28699 jlynxwiler@poudre-fire.orq Topic: General Comment Number: 1 12/25/2017: GATING PLAN Comment Originated: 12/25/2017 A plan for gating of the fire lane shall be submitted for fire department review prior to FDP approval. If gates are electric, an integrated Knox Key Switch will be required. If gates are manual, a Knox Padlock will be required. Please see www.Knoxbox.com for details. Comment Number: 2 Comment Originated: 12/25/2017 12/25/2017: ADDRESS POSTING Due to the building setback distance from W Harmony Road, the building address shall be posted at a minimum of 10" in height on a contrasting background. In addition, the building address and full street name is required to be posted on the Mason St. side of the building. Code language provided below. > IFC 505.1.8: LOCAL AMENDMENT -Buildings that are addressed on one street, but are accessible from other streets, shall have the address numbers AND STREET NAME on each side that is accessible form another street. Comment Number: 3 Comment Originated: 12/25/2017 12/25/2017: PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM TEST As previously noted, an ERRC test will be required with building permit. Code language provided below. > IFC 510 & 1103.2: New & existing buildings require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be used to define separate buildings. Where adequate radio coverage cannot be established within a building, public -safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. 5 species diversity required and extensive monocultures are P..,,Iibited. The following minimum requirements shall apply to any development plan. Number of trees on site Maximum percentage of any one species 10-19 50% 20-39 33% 40-59 25% 60 or more 15% Comment Number: 14 Comment Originated: 12/13/2017 12/12/2017: In the landscape legend, please specify'grass sod areas' as irrigated turf. Irrigated turf is required in all City right of ways. Comment Number: 15 Comment Originated: 12/13/2017 12/12/2017: Please include an additional column to the Tree Inventory and Mitigation table that states'Reason for Removal'. Comment Number: 16 Comment Originated: 12/13/2017 12/12/2017: Include locations of any water or sewer lines on the landscape plan. Please adjust street tree locations to provide for proper tree/utility separation. 10' between trees and public water, sanitary, and storm sewer main lines 6' between trees and public water, sanitary, and storm sewer service lines 4' between trees and gas lines Department: Internal Services Contact: Jonathon Nagel, jnagel@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/11/2017: The Community Recycling Ordinance (No. 109 2016) requires that all business and multifamily complexes subscribe to recycling service by the end of 2020 that is at minimum 1/3 of their overall service capacity(total bin capacity x number of weekly pickups, include both trash and recycling when calculating overall service capacity). In general recycling containers must be at least 50% the size of proposed trash containers to meet this requirement. Please make sure proposed containers meet this requirement and that adequate space is provided in all enclosures. Comment Number: 2 Comment Originated: 12/11/2017: Please provide drawings of the proposed trash/recycling enclosure showing overall dimensions, widths of service gates and required pedestrian entrance along with proposed containers and their capacity. 12/11/2017 12/11/2017 n Department: Forestry Contact: Molly Roche, mroche@fcqov.com Topic: Landscape Plans Comment Number: 9 Comment Originated: 12/13/2017 12/12/2017: Continued: There still appears to be mitigation trees missing or incorrectly shown on the landscape legend. Please correct the legend to show the following values: M-19: (3) AP M-23: (2) PP M-6, M-7, M-8: (3) CP M-20: EC M-21: RBC M-22: TC 9/25/2017: 1 only counted 10 upsized mitigation trees on the landscape plans and 8 mitigation trees on the landscape legend. Please show the required 11 mitigation trees in both locations. 8/9/2017: 11 upsized mitigation trees are required to be planted. Please confirm that 11 trees have been upsized (ornamentals at 2.5", canopy shade trees at 3", evergreen trees at 8' height) and mark these trees with a bolded "M" on the landscape plans. Comment Number: 11 Comment Originated: 12/13/2017 12/12/2017: Continued: There appears to be PPC (Perfect Purple Crabapple) included on the landscape plans where the transplanted Catalpas are shown. If the Catalpas are unable to transplant, please use a different species than PPC, such as Thunderchild Crabapple, Red Barron Crabapple, or another ornamental species. 9/25/2017: It appears as though PPC (Perfect Purple Crabapple) is still show on the landscape plans in some places. Please remove these from the plans and label the appropriate species. Comment Number: 13 Comment Originated: 12/13/2017 12/12/2017: Please include the Species Diversity Percentage in the Landscape Legend as required in LUC 3.2.1. There is a total of 46 trees on -site. According to Land Use Code standards, there is 28% Kentucky Coffeetrees proposed on the plans. Since there are 40-59 trees on -site, the max percentage of any one species is 25%. Please incorporate additional shade trees in the parking lot islands such as Catalpa or Bur Oak to decrease the percentage of Kentucky Coffeetree. To prevent uniform insect or disease susceptibility and eventual uniform senescence on a development site or in the adjacent area or the district, 3 n Comment Number: 5 �,omment Originated: 12/22/2017 12/22/2017: There is a conflicting Sanitary Sewer label on sheets 4 and 7.One label says to abandon the existing sewer service in place and the other says to abandon the sewer service at the manhole. Abandoning the sewer at the manhole will require excavating the sidewalk and part of Harmony, which would need to be shown on your plans. Comment Number: 6 Comment Originated: 12/22/2017 12/22/2017: Gates cannot swing open into the public ROW. Please reverse the direction they swing along Mason St, and show how the gates along Harmony Rd will be stopped from entering the ROW when they open. Comment Number: 7 Comment Originated: 12/22/2017 12/22/2017: The stairs need to be setback 2' from the back of the sidewalk. LCUASS Figure 16-1 shows this. (hftps://www.larimer.org/sites/default/files/uploads/2017/chl 6_2016.pdf) Comment Number: 8 Comment Originated: 12/22/2017 12/22/2017: Please make sure there is a minimum of 4.5' behind the curb ramps to provide adequate passing space. LCUASS Figure 1606 shows this in greater detail. (https://www.larimer.org/sites/defaulYfiles/apdxa_1601 _2501.pdf) Comment Number: 9 Comment Originated: 12/22/2017 12/22/2017: The storm line that ties into the storm inlet needs to be perpendicular to the ROW. Comment Number: 10 Comment Originated: 12/22/2017 12/22/2017: Please add a cross section for STA 5+11.31, to clarify ADA requirements. Comment Number: 11 Comment Originated: 12/22/2017 12/22/2017: Please label slopes on the pathway into the site off of Harmony in the ROW since this is shown to be the ADA accessible route. Comment Number: 12 Comment Originated: 12/22/2017 12/22/2017: See redlines for more comments and small changes. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/18/2017 12/18/2017: Thank you very much for your cooperation and continued work on this project including attention to many details. Well done. Environmental Planning is ready for mylars. ►, Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 • fax fcgov. com/devetopmentreview December 27, 2017 Steve More Commercial Building Services 7561 S Grant St. Littleton, CO 80122 RE: Fort Collins Jeep, FDP170035, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project.. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/22/2017 12/22/2017: The slopes across the driveway on Harmony Rd do not meet ADA requirements. Comment Number: 2 Comment Originated: 12/22/2017 12/22/2017: The "Transit Easement' should be an "Access easement". Comment Number: 3 Comment Originated: 12/22/2017 12/22/2017: If the parcel to the west of the tracks is not being platted or improved with this project, it will need to be taken off of the utility plan cover sheet. If this parcel is part of the project, details of the frontage along Harmony needs to be shown to ensure that current conditions meet City Standards. Comment Number: 4 Comment Originated: 12/22/2017 12/22/2017: The curb ramp has traffic signal control boxes located in it as well as the traffic signal pole in the flare of the curb ramp.