Loading...
HomeMy WebLinkAboutLINDIMER SUBDIVISION PRELIMINARY - 26 93 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW7. The site is located in the Spring Creek Drainage Basin. The Stormwater development fees in this basin are $1,804 per acre, subject to the amount of impervious area and the runoff coefficient. 8. It will be up to the Pleasant Valley and Lake Canal Company to decide whether to accept stormwater runoff into the ditch. This method is usually controversial and decided on a case by case basis. You must begin discussions with the ditch company if the ditch is to be the outfall of the drainage. 9. A standard Drainage Report, Drainage and Grading Plan, and Erosion Control Plan will be required to submitted according to the submittal requirements. 10. A Traffic Report will be required. This study should address the trip generation based on the number of lots, and the trip assignment on the public street system. The traffic consultant should check with the City's Transportation Department prior to the analysis to determine the scope of the study. 11. The curving of Birmingham should meet the standard 240 centerline radius for a local street. If this standard is unworkable, then a variance must be applied for by a registered professional engineer. 12. A Utility Plan will be required for review of the design for public improvements. A Development Agreement between the City and the developer will outline the rights and obligations of the parties. 13. The Street Oversizing Fee is $584 per dwelling unit payable at the time of building permit issuance. 14. The Parkland Development Fee is $625 per dwelling unit. 15. A bike path will be placed on the east side of the Pleasant Valley and Lake Canal. 16. The project is subject to the requirements of the Solar Orientation Ordinance. 17. One 2 inch caliper, deciduous shade tree should be planted per lot, per street frontage. CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: January 25, 1993 ITEM: Extension of Birmingham Drive - Single Family Homes APPLICANT: Mark Linder and Brett Larimer c/o Mark Linder Real Estate, 3500 J.F.K. Parkway, #221, Fort Collins, CO. 80525. LAND USE DATA: Request to subdivide approximately 4 acres into 16 - 17 single family lots. The site is located north of Horsetooth Stables, east of Rossborough Subdivision, and west of the Pleasant Valley and Lake Canal. COMMENTS: 1. The Light and Power Department has existing electrical system stubbed to the end of Birmingham Drive. This system can be logically extended to serve the proposed subdivision. Standard easements are needed for front lot service. Normal development charges will apply. Please contact Doug Martine, 221-6700, for further details. 2. An existing water main in.Birmingham can be extended to serve the site without any anticipated problems. Please contact Mark Taylor, 221-6681, for further information about the water line extension. 3. Providing sewer service to this site may be a problem. The sewer main will have to either go south to tap into an 8 inch diameter main being constructed to serve Kingston Woods. Or, the sewer main will have to go back to the northwest to tie into an existing 18 inch diameter main. For further information of these options, please contact Mark Taylor, 221- 6681. 4. The zoning is R-L-P, Low Density Planned Residential. This zoning allows single family homes as a "use by right" as long as minimum lot area (6,000 square feet) and minimum lot width (60 feet as measured from the front building line) are met. If these minimum design criteria are not met, then an option would be to submit the project as a Planned Unit Development, reviewed by the criteria of the Land Development Guidance System. 5. The Poudre Fire Authority will require standard spacing for fire hydrants and minimum flow Yates on the water lines. 6. The temporary cul-de-sac will be allowed as long as there is an escrow account to pay for the reconstruction when the street is extended to the south. Commr y Planning and Environmental Planning Department City of Fort Collins January 28, 1993 Mark Linder Brett Larimer Mark Linder Real Estate 3500 J.F.K. Parkway, #221 Fort Collins, CO 80525 Dear Mark and Brett: rvices For your information, attached is a copy of the Staff's comments concerning Extension of Birmingham Drive - Single Family Homes, presented before the Conceptual Review Team on January 25, 1993. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these. comments may be made at the' time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, -ZZ4 j4f Ted Shepard Senior Planner TS/gjt Attachments cc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Transportation Department Project Planner File 281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80322-0580 - (303) 221-6750