HomeMy WebLinkAboutLINDIMER SUBDIVISION PRELIMINARY - 26 93 - SUBMITTAL DOCUMENTS - ROUND 1 - VARIANCE REQUESTj
STEWART&ASSOCIATES
Consulting Engineers and Surveyors
May 3, 1993
Mr. Ted Shepard
Planning Department
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Ted:
This is to request that you initiate two variances for the proposed
Lindimer Subdivision. TN�cEE
A variance is requested for th solar orientation ordinance. Due to the
extreme site constraints, only of fifteen lots meet the required lot
orientation. The site is a small odd —shaped parcel that is infill between
two existing subdivisions.
Also, due to the boundary constraints, we are requesting a variance to
the minimum street centerline radius. The radii for the curves as shown on
the preliminary plat are 155 feet, 175 feet and 225 feet rather than the
required 240 feet.
Thank you for your assistance in this matter.
Sincerely,
6ZJ"C�� u . c
Richard A. Rutherford, P.E. & L.S.
President
jrr
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382