Loading...
HomeMy WebLinkAboutLINDIMER SUBDIVISION PRELIMINARY - 26 93 - SUBMITTAL DOCUMENTS - ROUND 1 - VARIANCE REQUESTj STEWART&ASSOCIATES Consulting Engineers and Surveyors May 3, 1993 Mr. Ted Shepard Planning Department City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Ted: This is to request that you initiate two variances for the proposed Lindimer Subdivision. TN�cEE A variance is requested for th solar orientation ordinance. Due to the extreme site constraints, only of fifteen lots meet the required lot orientation. The site is a small odd —shaped parcel that is infill between two existing subdivisions. Also, due to the boundary constraints, we are requesting a variance to the minimum street centerline radius. The radii for the curves as shown on the preliminary plat are 155 feet, 175 feet and 225 feet rather than the required 240 feet. Thank you for your assistance in this matter. Sincerely, 6ZJ"C�� u . c Richard A. Rutherford, P.E. & L.S. President jrr James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382