Loading...
HomeMy WebLinkAboutEAST RIDGE THIRD FILING REPLAT - BDR190011 - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSCc: Kyle Pollock <KylePollock@gallowayus.com>; James Prelog <JamesPrelog@gallowayus.com> Subject: East Ridge Third Filing (ERTF) - Replat Mosaic Townhomes I SWMP Citrix Attachments H F H 13.20_S W M P_20190904. pdf Herman Feissner uses Citrix Files to share documents securely. Hi Jesse, Expires March 2, 2020 Thank you for reviewing the Stormwater Management Plan (SWMP) for ERTF — Replat Mosaic Townhomes. I attached a revised copy with two comments addressed: 1. Text comment on PDF page 119 — upside down text fixed. 2. Note added to the general notes — "Any tracking of mud or debris onto adjacent streets by the contractor(s) shall be immediately remedied and swept". If I missed a comment, please let me know. Could we schedule a meeting and discuss the escrow calculation? I want to make sure money is not put into escrow twice. ERTF was approved in Nov/Dec 2017. The approval included both a north and south portion. Currently the south portion is under construction and the north portion (i.e., Replat Mosaic Townhomes) is being re -designed. Perhaps money for the north portion was placed in escrow at the time of the prior approval. Please let me know what time you have available over the next week or two. It's easiest for me to meet in the mornings. Galloway Herman Feissner, PE SR. CIVIL PROJECT ENGINEER 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 O 970.800.3300 HermanFeissner@GallowayUS.com GallowavUS.com COLORADO i CALIFORNIA I UTAH Nationally Recognized. Locally Preferred. 2 Stephen Olt From: Jesse Schlam Sent: Thursday, September 05, 2019 6:21 AM To: Herman Feissner Cc: Kyle Pollock; James Prelog; Brandy Bethurem Harras; Basil Hamdan Subject: RE: East Ridge Third Filing (ERTF) - Replat Mosaic Townhomes I SWMP Herman, Thank you for forwarding this information did this go to Brandy for the routing first or did she direct you to reach out to us directly? I did not do the most recent review that was Basil. I cc'd him in on this email chain. As far as the escrow is concerned, last I remembered we have collected escrow site wide for the full area. At this time I do not see any reason we cannot just work the calculation even though the escrow may not be collected. This calc may have a use later when the site starts to get stabilized or if that area is to be sold off or built upon by a different company that may need to place their escrow on the table instead of the overall developer. Basil, Please make sure this is added to the materials that are to be reviewed for the MA at East Ridge. Would you also take a quick glance at the areas we already have collected escrow on to make sure we are not doubling up? Thank you both, Jesse If you need anything else from me please let me know. �En clue puedo servirle? Jesse Schlam, CFM City of Fort Collins City of I Utilities:: Environmental Government Affairs Division: Fort Collins Senior Environmental Regulatory Specialist (970) 218-2932 c. (970) 224-6015 o. 0schlam @fcgov.com Erosion Control Requirements and Info may be accessed through www. fcgo v. com/erosion Soil Amendment Requirements and Info may be accessed through www. fcgo v. com/soil-amendment Building permit status and Development Projects may be accessed through Citizen Portal https://accela-aca.fcgov.com/CitizenAccess/Default.aspx Tell us about our service, we want to know From: Herman Feissner <HermanFeissner@gallowayus.com> Sent: Wednesday, September 04, 2019 2:59 PM To: Jesse Schlam <JSchlam@fcgov.com>