HomeMy WebLinkAboutMULBERRY CONNECTION - PDP190015 - CORRESPONDENCE - STREET RELATED DOCUMENT (5)Charlie,
I wanted to reach out to see if you could help me with something. We are under contract on a development site in
Fort Collins, Colorado and it borders 1-25, as well as a frontage road. Would you be able to send along the
appropriate contact at CDOT who manages this area, as we have some setback and future improvement questions
for them.
Your help would be much appreciated.
Regards,
Josh
Josh S. Heiney
Senior Vice President I Comunale Properties
1855 South Pearl St., Suite 20 1 Denver, CO 80210
P: 720.414.5210 I C: 720.935.9486 1 F: 888.367.0295
jheinev@theiredsroup.com ! www.comunaleproperties.com
Tim Bilobran
Region 4 Permits Manager
Office 970-350-2163 1 Mobile 970-302-4022 1 Fax 970-350-2198
10601 W. 10th Street, Greeley, CO 80634
timothv.bilobran@state.co.us I codot.gov I www.cotrip.org
4
Josh S. Heiney
Senior Vice President I Comunale Properties
1855 South Pearl St., Suite 20 1 Denver, CO 80210
P: 720.414.5210 1 C: 720.935.9486 1 F: 888.367.0295
iheinev@theiredgroup.com I www.comunaleproperties.com
From: Young - CDOT, Charles <charles.young@state.co.us>
Sent: Thursday, March 28, 2019 4:40 PM
To: Josh Heiney <iheiney@theiredgroup.com>
Cc: Peter Sulmeisters - CDOT <peter.sulmeisters@state.co.us>
Subject: Re: Ft Collins Contact
Hi Josh,
Peter Sulmeisters (cc'd) is the right-of-way manager for Region 4, which includes Ft. Collins. We generally do not have
setback requirements as those are determined by the local jurisdictions, but Peter will know or be able to direct your
questions regarding future improvements.
Thanks,
Charlie
Charlie Young
Region 1 Property Manager
P 303.757.9255 1 M 616.540.5762
2829 West Howard Place, Denver, CO 80204
charles.young@state.co.us I www.codot.gov I www.Cotrip.orl;
On Thu, Mar 28, 2019 at 4:18 PM Josh Heiney <iheiney@theiredgroup.com> wrote:
FJ
1.This site is adjacent to CDOT roadway and all access to the site is governed by an access control plan. The access
control plan will need to be followed and implemented with any project. Plans will be routed to CDOT for
review and approval and the applicant may need to obtain access permits from CDOT. The criteria for when
you need to obtain an access permit for the Frontage Road / Redman Drive intersection is your new
development increases the daily traffic using the side street connection by greater than 20%. There isn't a ton
of development on that roadway so pretty much anything you develop will increase the traffic on the side
street at the intersection by at least 20%. A new permit will be required. The existing head in parking is also
subject to CDOT review. It is possible CDOT may require this to be removed. I am confused as to this
comment. I do not see any of the parking spots inside the CDOT right-of-way I believe. If all your parking is on
your property than it is Ft. Collins that decides on the head in question as the local municipality with land use
authority.
2.The Frontage Road is under the jurisdiction on the Colorado Department of Transportation (CDOT), so we'll need
to coordinate with them for access permits, and review of any needed auxiliary turn lanes. Correct. Just as a
FYI I think it'll be minimum 6 months from when you begin your engineering work before you are approved for
construction given a standard length of time for your consultant engineer to design the plans. The asphalt
paving season for developers ends Oct. 1st, which means that your auxiliary lanes won't be installed until 2020
at the earliest so please plan accordingly.
3.The estimated daily vehicular trips from the proposed development meets the threshold of requiring some sort
of traffic impact study (TIS). Please have your traffic engineer contact me to scope the study (it will be
coordinated with CDOT so the study meets their requirements). The City may have more specific scoping
requirements. I'm attaching a CDOT Traffic Study primer to this e-mail to go over what we're looking for.
4. There most likely will be other permits you need. Looking at your site plan, I cannot tell if the landscaping
intends to extend into the CDOT ROW as well. It can provided that the landscaping meets the requirements of
our CDOT policy (attached). The permit for this is a free Utility/Special Use Permit. Speaking of utilities be
advised that the CDOT Access Permit does not cover utility installations. You / the 3rd party utility firm will
need to pull utility permits.
1.The city also asked that we discuss proper setback's from 1-25 with CDOT, I would appreciate any feedback on
this matter. I have sent this request to the CDOT Engineering residency who is working on a potential Vine
Drive bridge project. I do not know if their set -in -stone ROW lines extend back to this intersection. Please
continue to follow up with me.
Do you have some time on Monday or Tuesday for a quick call to discuss our project and review the above items.
I look forward to hearing back.
Regards,
Josh
2
Stephen Olt
From: Bilobran - CDOT, Timothy <timothy.bilobran@state.co.us>
Sent: Monday, April 22, 2019 1:47 PM
To: Josh Heiney
Cc: Allyson.Mattson@state.co.us; Buzz Miller
Subject: Re: Ft Collins Development Project
Attachments: image001.png; Ultimate Plans (20%) - Segment 8_SH14 to Vine.pdf; 00 NI25 FEIS Plan
Set_SH14 to Vine.pdf
Josh,
Regarding the ultimate 1-25 widening & that frontage road, I've checked with the engineering team on that project. They
write:
The FEIS plans do show reconstruction of the frontage road on the west side between SH 14 and Vine Dr. However, the
ultimate 20% plans developed in 2015 show walls on mainline 1-25 to avoid this impact. See attached for sheets from
both plansets.
Looks like the frontage road will be reconstructed in its same location. No new ROW would be needed.
Thanks,
Tim
On Wed, Apr 17, 2019 at 1:02 PM Bilobran - CDOT, Timothy <timothy.bilobran@state.co.us> wrote:
Josh,
I'm very sorry that you're e-mail has been wallowing 2+ weeks in my inbox. I've typed some responses below in Red. I
attempted to be as thorough as possible. If you would still like to talk, my schedule is quite full but I can speak:
Wed. the 24th between 8 and 9:45
Friday the 26th from 11-noon
Monday the 29th all day.
If you do want to reserve one of these times, please send me a calendar invite to reserve the time on my calendar.
Thanks,
Tim
On Fri, Mar 29, 2019 at 3:02 PM Josh Heiney <iheiney@theiredgroup.com> wrote:
Tim and Allyson,
We were given your names from Peter Sulmeisters. We are in the pre -development process for a project located at
3801-4099 Redman Drive in Ft. Collins. Attached is the site plan for your reference, as you will see, the site is adjacent
to the frontage road and 1-25. We had a conceptual review meeting with the city on March 15`h, and the coordination
with CDOT came up a few times during the meeting, then also referenced in a few of the city meeting notes that were
circulated, which are outlined below.