Loading...
HomeMy WebLinkAboutRIVER DISTRICT BLOCK 8 MIXED USE - FDP160025 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS` 1 City of 6rt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax tcgov. com/developmentreview June 24, 2016 Brent Cooper 419 CANYON AVENUE, SUITE 200 Fort Collins, CO 80521 RE: River District Block 8 Mixed -Use, FDP160025, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 06/21/2016 06/21/2016: Please remove note #7 on the paving plan (C200). It reflects 6" concrete paving in right-of-way, but technically 8" concrete paving is required for the driveway out to Willow Street per LCUASS detail 707.2. Comment Number: 2 Comment Originated: 06/21/2016 06/21/2016: The paving plan (C200) identifies proposed 30" curb and gutter for the driveway removal along Linden Street. This area of Linden Street was built with a wide curb head and I believe the total length of the curb and gutter is greater than 30". Please indicate matching existing curb and gutter instead. Comment Number: 3 Comment Originated: 06/21/2016 06/21/2016: The Storm Drain Plan and Profile Sheet C301 has a cover issue of less than 3 feet from the top of the Willow Street roadway for a distance of about 10 feet of the pipe into Willow Street. Alternatives to achieve the 3 foot minimum cover would need to be explored. Topic: Site Plan Comment Number: 5 Comment Originated: 06/20/2016: Please change the project title on all sheets to "Lots 1 & 2, River District Block Eight Mixed Use" Comment Number: 6 Comment Originated: 06/20/2016: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Department: Traffic Operation Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com Topic: General Comment Number: 1 06/21/2016: No comments. 06/20/2016 06/20/2016 Comment Originated: 06/21/2016 Department: Water -Wastewater Engineering Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/21/2016 06/21/2016: Please note that all City construction detail drawings are to be used in their original, unaltered state. ANY modification(s) must be clearly distinguished and all City logos/identifiers must be removed from the modified detail. Detail drawings can be found in both .pdf and .dwg formats through the links to "Construction Drawings" on www.fcgov.com/utility-development. Comment Number: 2 Comment Originated: 06/21/2016 06/21/2016: Please see redlined utility plan. Comment Number: 17 Comment Originated: 06/21/2016 06/21/2016: Please tie the coordinate values shown for utilities to the project boundary. We would prefer that this be done by adding property corner values to each sheet, or showing the property corner values on the horizontal control plans and adding a note to each sheet with coordinate values. Comment Number: 18 Comment Originated: 06/21/2016 06/21/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Topic: General Comment Number: 14 Comment Originated: 06/20/2016 06/20/2016: BUILDING HEIGHT: Please change the project title on all sheets to "Lots 1 & 2, River District Block Eight Mixed Use". Comment Number: 15 Comment Originated: 06/20/2016 06/20/2016: SUN SHADE ANALYSIS: Please change the project title on all sheets to "Lots 1 & 2, River District Block Eight Mixed Use". Topic: Landscape Plans Comment Number: 7 Comment Originated: 06/20/2016 06/20/2016: Please change the project title on all sheets to "Lots 1 & 2, River District Block Eight Mixed Use". Comment Number: 8 Comment Originated: 06/20/2016 06/20/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Comment Number: 9 Comment Originated: 06/20/2016 06/20/2016: There are line over text issues. See redlines. Comment Number: 10 Comment Originated: 06/20/2016 06/20/2016: Please correct the title & number on sheet 4. See redlines. Topic: Lighting Plan Comment Number: 11 Comment Originated: 06/20/2016 06/20/2016: Please change the project title on all sheets to "Lots 1 & 2, River District Block Eight Mixed Use" Topic: Plat Comment Number: 1 Comment Originated: 06/20/2016 06/20/2016: There is a missing call in the legal description. See redlines. Comment Number: 2 Comment Originated: 06/20/2016 06/20/2016: Please add "Name" & "Title" to the signature blocks as marked. See redlines. Comment Number: 3 Comment Originated: 06/20/2016 06/20/2016: Please add new title commitment information as available. Comment Number: 4 Comment Originated: 06/20/2016 06/20/2016: All reception numbers for documents recorded by separate document, must be added prior to producing mylars. R Comment Number: 3 Comment Originated: 06/21/2016 06/21/2016: Please show how this site's release rate relates to Basin 102. Please include an exhibit of Basin 102 showing the total area of the basin and pro -rate the release for this site to show compliance with the basin's release rate. Comment Number: 4 Comment Originated: 06/21/2016 06/21/2016: Please provide complete analysis within the drainage report and detail how the site will function with the StormTech system. The level of detail should explain to the extent that someone unfamiliar with the site and StormTech system would understand what is proposed; this may include additional details within the plans as well. Comment Number: 5 Comment Originated: 06/21/2016 06/21/2016: Please provide an easement for the underground treatment area. Comment Number: 6 Comment Originated: 06/21/2016 06/21/2016: Please provide detail for the proposed tree wells and roof drain connections. Comment Number: 7 Comment Originated: 06/21/2016 06/21/2016: Please provide additional detail on the proposed spill containment area. It is unclear from the grading plan how this would capture a spill. The drainage report calls for a 1000-gallon cistern; however, no details for the system are seen with the plans. Contact: Jesse Schlam, 970-218-2932, ischiam@fcqov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 06/16/2016 06/16/2016: Current Erosion Control Materials Submitted do not meet requirements. Please submit; Erosion Control Plan (based upon latest redlines), Erosion Control Report (please see redlines specifically around contaminated sites) , and an Escrow / Security Calculation (May need to be recalculated based upon plan redlines). If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Department: Technical Services Contact: Jeff County, 970-221-6588, *county@fcgov.com Topic: Building Elevations Comment Number: 12 Comment Originated: 06/20/2016 06/20/2016: Please change the project title on all sheets to "Lots 1 & 2, River District Block Eight Mixed Use". Comment Number: 13 Comment Originated: 06/20/2016 06/20/2016: There are line over text issues. See redlines. Topic: Construction Drawings Comment Number: 16 Comment Originated: 06/20/2016 06/20/2016: Please change the project title on all sheets to "Lots 1 & 2, River District Block Eight Mixed Use". 5 Comment Number: 5 Comment Originated: 06/22/2016 06/22/2016: Please re -word the note that explains why there is no off-street parking. It's not exactly accurate to state that the T.O.D. does not require parking. How about "Minimum required off-street vehicular parking in the T.O.D. not in effect at the time of application." Comment Number: 6 Comment Originated: 06/22/2016 06/22/2016: On the Lighting Plan, the FIN wall pack (quantity 20) appears to be a contemporary and sleek fixture that is appropriate for most locations along the southwest elevation (facing Mawson Lumber) and southeast (facing Kiefer Concrete). But, where three of these fixtures are visible from Linden Street and Willow Street, the fixtures appear to be mismatched with the character of the building. Perhaps a wall pack along the streets could be selected that is complementary to the building style. Comment Number: 7 Comment Originated: 06/22/2016 06/22/2016: Along Willow Street, there is a symmetrical arrangement of 10 PSDNA wall packs. But at the gate to transformers at the rear of the building, this consistency is interrupted by one FIN wall pack. Why not just continue the PSDNA's at this location instead of introducing a very different looking fixture? Comment Number: 8 Comment Originated: 06/22/2016 06/22/2016: 1 can't read the wall pack fixture along Willow Street along the front building. Per the above comments, if this fixture is a FIN, please consider using a PSDNA for consistency along Willow Street. Comment Number: 9 Comment Originated: 06/22/2016 06/22/2016: On the Lighting Plan schedule, three of four fixtures are not specified as to their Kelvin temperature. Please indicate that per the cut sheets on Sheet 6, these temperatures should be noted as 3,000 degrees. Comment Number: 10 Comment Originated: 06/22/2016 06/22/2016: On the Landscape Schedule, please indicate the size of the mitigation trees. Comment Number: 11 Comment Originated: 06/22/2016 06/22/2016: There are two Landscape Plan Sheet 3's. The detail sheet should be Sheet 4. Comment Number: 12 Comment Originated: 06/23/2016 06/23/2016: Regarding the Lighting Plan, it would be helpful if schedule included information from the Department of Energy "Lighting Facts" which establishes ratings for Backlight, Up -light and Glare. Department: Stormwater Engineering Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/21/2016 06/21/2016: Please see redlined drainage report and utility/grading plan. 4 Department: Light And Power Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/22/2016 06/22/2016: Comcast would like to do joint trench with Light and Power. Please contact Don Kapperman at Comcast and Janet McTague at Light and Power for further details. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, Ilynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 06/08/2016 06/08/2016: FIRE PITS Fire pits fueled by natural gas are allowed. Wood burning or smoke producing fire pits are prohibited. Fire pits shall have a 10' separation to combustible construction and/or vegetation. In particular, the fire pit shown on the West side of Building 2 is placed against an exterior wall. At time of building plan review, plans will need to show that this is addressed by a UL rated device for this application and construction is noncombustible. Department: Planning Services Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/22/2016 06/22/2016: Along the Willow Street side of the front building, the Landscape Plan indicates a 6' Metal Fence" but the Architectural Elevations, Sheet 7, indicates a wire mesh screen that is approximately 16 feet high. Please resolve. Also, please indicate the color of this metal screen fence/wall. Staff expects that given the quality of the two buildings and the character that is being established along Willow Street, this fence/wall will be a wire mesh and not chain link and be black or vinyl -clad with black coating. This fence/wall should not be galvanized. Comment Number: 2 Comment Originated: 06/22/2016 06/22/2016: Please further describe the fence at the rear property line. Is this an existing fence that separates the site from Kiefer Concrete? Please further describe this fence. Comment Number: 3 Comment Originated: 06/22/2016 06/22/2016: The surface treatment of the Outdoor Dining area is described as crusher fines. Is this accurate? This seems like an odd surface for this area. Comment Number: 4 Comment Originated: 06/22/2016 06/22/2016: Please indicate the location of the enclosed bike parking spaces. 3 Comment Number: 4 Comment Originated: 06/21/2016 06/21/2016: The diagonal parking/striping shown on Willow Street in the ultimate condition (cross section sheets and signing and striping sheet) should be indicated as being for reference only and for illustrative purposes. Final design for Willow Street might provide a different configuration of the striping along Willow Street, including the diagonal parking (striping alternatives are currently being looked at for the portion of Willow Street west of Linden Street.) Comment Number: 5 Comment Originated: 06/21/2016 06/21/2016: The interim and ultimate (for reference only) roadway designs for Willow Street are satisfactory provided that all parties agree that the local street portion of pavement and subgrade along the frontage of Lots 1 & 2 will be provided. A "temporary" subgrade design along Willow Street for the road widening and curb & gutter/sidewalk, will be considered by our Director as part of a proposed pavement design report. Comment Number: 6 Comment Originated: 06/21/2016 06/21/2016: The design of the drive approach off of Willow Street should be shown on the civil plans, and its conformance with the 707.2 detail. Please show the proposed access ramp/truncated dome design on the plans as part of the detail. Topic: General Comment Number: 7 Comment Originated: 06/21/2016 06/21/2016: The pre -hearing drawings were known as Lot 1, River District Block Eight Mixed Use. Since the hearing, it appears that Lot 1 is now subdivided into two lots (Lot 1 and Lot 2), with the development plan comprising of Lots 1 and 2, with the plat also platting Lot 3. The drawings should be titled Lots 1 and 2, River District Block Eight Mixed Use, to reflect the fact that the associated final approval and vesting is for Lots 1 and 2 only, not Lot 3. Are there any implications in general on the development plan now being for two lots, which was previously only one lot? Comment Number: 8 Comment Originated: 06/21/2016 06/21/2016: Additional comments may be provided after the 22nd, I'm out of the office on the 22nd and won't be at staff review. Department: Historic Preservation Contact: Maren Bzdek, 970-221-6206, mbzdek@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/24/2016 06/24/2016: On April 27, 2016, the Landmark Preservation Commission voted to recommend approval for this project based on findings that included a water tower that is compatible with the overall proportions of the associated distillery buildings. The current elevations for the FDP indicate a proportional change between the water tower and the buildings. Staff is looking at the implications and rationale for this change. Because this issue may constitute a major change to the plans that the LPC approved, it may require a return to the LPC if it can't be resolved at the staff level. Please contact us asap to discuss. 2