Loading...
HomeMy WebLinkAboutNCR PARKING LOT EXPANSION IP SITE PLAN REVIEW - 35 93 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWk, 8. For more information on drainage in the general area, you may want to contact Vic Meline at 226-2323, who is working on the drainage plans for other projects in the area. 9. A standard development agreement between the City and the owners/developers will be required. Please contact Mike Herzig or Kerrie Ashbeck (221-6750) for details. 10. Please provide a cut -sheet for the proposed parking lot lighting. Planning Staff recommends low level wattage, high pressure sodium fixtures on 20-25' poles. With a residential area to the west it is important to provide a level of lighting that works for a parking lot, for security, etc. and yet, limits glare and light spill off -site. 11. Please provide a letter at the time of submittal to address reasons for the increased parking need, information about numbers of employees, hours of operation (shifts), and general information about impacts on the surrounding streets from additional parking and traffic. CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: March 1, 1993 ITEM: APPLICANT: NCR parking lot expansion Mike Jones c/o Northern 420 S. Howes Fort Collins, Engineering St. CO 80521 LAND USE DATA: This is a proposal for a parking lot expansion for NCR, an existing industrial use, located north of Horsetooth Road and East of Timberline Road. The site is currently undeveloped and is approximately 3 acres in size. COMMENTS: 1. The property is located in the IP, Planned Industrial, Zoning District. Parking lots. are allowable uses in this zone, subject to an administrative review of an IP Site Plan. The parking lot development must meet setback and landscaping requirements. At a minimum, a 5' landscaped buffer is required along lot lines. A minimum of 6% of the interior parking lot area must be in landscaping. 2. If you are not making changes to your water or sewer services, then the City Water Utility does not have comments at this time. 3. Development Fees are normally required.for Light and Power for electric utilities. Please contact Light and Power at 221- 6700 for an estimate of the charges. 4. You will have to apply for a building permit for the parking lot lighting system, which will be inspected by the City Building Department. 5. The property is in the 'i drainage basin and Stormwater fees are $5501.00 per acre, subject to both on -site detention and the coefficient .of imperviousness (which in the case of a parking lot is nearly 100%). 6. It is unlikely that you will be allowed to upsize the diameter of the stormwater pipe existing in Timberline. If you are increasing flow through the pipe, please coordinate your plans with the High School plans. 7. A standard stormwater submittal is required, including grading and drainage plans, drainage report, and an erosion control plan. I Community Planning and Environmental Services Planning Department City of Fort Collins March 2, 1993 Mike Jones Northern Engineering 420 S. Howes Fort Collins, CO 80521 Dear Mike: For your information, attached is a copy of the Staff's comments concerning NCR Parking Lot Expansion, presented before the Conceptual Review Team on March 1, 1993. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Kirsten Whetstone Project Planner KW/gjt Attachments cc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Transportation Department Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750