HomeMy WebLinkAboutORCHARD PLACE PUD PRELIMINARY - 40 93 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFOUN DAT 1 O N
ENGINEERING
Ma6/4-c RARA +�
p I I f I II ISY�00�• �
i Il
f � Oil
i
- I
I - I
I
,
' 1
�ItOURO
ii-
I � b■0!
I
1
A s I
I
6+
� I
I
zzao I � ,
'
I
rs
v� f ns u
� y� � ��� rsc•
} rY
I
sc[.- nIt[/nloM :
— �•e , ,� f
e �'
l
I ,,,t
j
rs�•
I
Detail
r4 ,F r
I
live.
•
I
I
Ii-
BETHEL
I ! I
I
BAPTIST
�• UNRAI' PLACE
I I
l PU.D.
i
T
it o s:
Is,10,
64.
Delos
I ! v� 1 . \ am
PUN ST
31. 2
�
`
13
v_
\el "I G I TIf Mie
:�
I
No Text
Q100 = (1.25) (. 73) (6.40) (.52) = 3.04 cfs
D E T E N T I O N
Release at Historic Flow Q = .17 cfs
Developed Q = (1.25)(I)(.73)(.52) = .471
Time
I
Q100 In
Volume
Q2 Out
Volume
Volume
Min
Lin/hrZ
cfs
(cu.ft)
cfs
(cu. ft.)
(cu.ft.)
10
7.30
3.43
2058
.17
102
1956
20
5.17
2.43
2916
.17
204
2712
30
4.15
1.95
3510
.17
306
3204
40
3.50
1.65
3960
.17
408
3552
50
3.00
1.41
4230
.17
510
3720
60
2.60
1.22
4392
.17
612
3780
70
2.30
1.08
4536
.17
714
3822
80
2.06
0.97
4656
.17
816
3840
90
1.87
'0.88
4752
:17
918
3834
100
1.70
0.80
4800
.17
1020
3780
Detention Required is 3840 cubic feet.
DEVE LOPED RUNOFF
Flow Path - Developed Site
1. NW corner of site - Overland to east edge of site - 140 feet
2. Swale along east edge of site
Slope
1. Backyard at 1%
2. Sideyard at .5%
Developed Coefficient of Infiltration
Roof & Park Open Street
( 528)(.95) + (.287)(.20) + (.185)(.95) _ .73
1
Time of Coaicentration (TC)
1. Backyard from Figure 3-2 Page 3-6 = 9.0 minutes
2. Sideyard from Urban Drainage (v = 1 foot/sec) = 1.7 minutes
Total TC = 10.7 minutes
Intensity from Figure 3-1 Page 3-2
I2 = 2.25 inches/hour
I100 = 6.40 inches/hour
g2 = (1.0)(.73)(2.25)(.52) _ .85 cfs
3. The detention pond, in conjunction with rock filters and silt
fences, will provide wind and water erosion protection for the
site during construction.
4. Site landscaping will provide the final site erosion control
in conjunction with the detention/sedimentation pond.
5. The adjacent street right-of-way is included in the drainage
analysis.
HI STORI C RUNOFF
Historic Run-off Path = 195 feet diagonally across site
Slope = .75%
Historic Coefficient of Infiltration = 0.2
Time of Concentration (TC) from Figure 3-2, Page 3-6
TC = 24 minutes
Intensity from Figure 3-1, Page 3-2
IZ = 1.67 inches/hour
1100 = 4.70 inches/hour
Q = Cf C1A
QZ = (1.0)(.2)(1.67)(.52) = .17 cfs
Q100 = (1.25) (.2) (4.7) (.52) = . 61 cfs
EROS ION CONTROL
it is anticipated that the erosion potential from this site will
be minimal. The site is less than two hundred (200) feet long and
is currently surrounded by landscaped areas. Therefore, no
improvements are anticipated to control wind erosion.
The easterly end of the parking lot will provide the location for
a sediment basin to be constructed. Rock filters will provide a
filter to further trap sediments and insure protection from water
erosion. Silt forming along the south and eastern edging of the
site will protect adjacent properties.
The sedimentation/detention pond will be the first improvement
constructed on the site. Seeding and/or sodding of the site
immediately after the units are constructed will provide the
permanent erosion control solution.
C O N C L U S I O N S
1. The site does not sit in a regulated flood plain and is not
subject to severe flooding problems.
2. A detention pond will collect runoff from the site, and an
outlet structure will control releases into the existing
drainage system.
southeast and historically sheet -flow over the street curb into
Orchard Place. Flows continued along the north curb and gutter
along Orchard Place to a stormwater inlet at the northwest corner
of Taft Hill Road and Orchard Place. Historic runoff for the two
year storm is .17 cfs. Historic runoff for the one hundred year
storm is .61 cfs. (see Calculations in Appendix).
PROPOSED DRAINAGE IMPROVEMENTS
As per the requirements of the Fort Collins Storm Drainage Design
Criteria and Construction Standards, detention is proposed for this
site to insure that only historic flows are released into the
existing drainage system. Back and sideyard swales will collect
offsite flows from the north and onsite runoff from the buildings
and convey these flows to a detention pond located in the parking
lot. An outlet structure located at the southeast corner of the
parking lot will release this runoff at historic rates. The
detention pond will be sized to detain the onsite runoff and to
allow offsite flows to pass through the site. The two year flows
from the developed site are .85 cfs. The one hundred year flows
from the developed site are 3.04 cfs. Approximately 3,840 cubic
feet of detention will be required in the parking area (see
calculations in Appendix). This will require the parking area to
pool water approximately eight (8) inches deep.
M E T H O D O L O G Y
The Rational Method will be used to develop runoff and detention
volumes for this project. The Rational Formula is an excellent
predictor of flaws in drainage basins less than 200 acres.
HI STORIC_ FLOWS
Runoff in this area, typically, flows from the northwest to the
southeast. Flows are collected by the Orchard Place street curbs
and then conveyed by storm sewer to a regional drainage outlet
which exists approximately two hundred (200) feet south of Orchard
Place (See Figure 2 Photo and Topography).
Historical flows have little impact on this site. Areas to the
south and east are lower than the proposed project, and these
drainage flows run away from the site. The apartment complex to
the west constructed berms between these two (2) properties and
flows from the apartment complex are diverted to the south, away
from the site.
The trailer park to the north does discharge runoff to the south
through this site; however, these flows will be routed through the
site drainage swales.
Runoff from the property itself travels from the northwest to the
SITE DE SCRIPTION
A .42 acre eight-plex project is being developed on a 119' x 155'
lot along the north side of Orchard Place, just west of Taft Hill
Road. This property is located in the Quarter of
Section , Township North, Range West of the Sixth Prime
Meridian, Larimer County, Colorado. The site is currently vacant
and is covered by native vegetation.
Land uses vary around the project. A mobile home park exists to
the north, an apartment complex exists to the west, a vacant parcel
exists to the south across Orchard Place, and a single family
residence exists to the east.
The proposed project will have eight (8) units and provide
seventeen (17) paved parking spaces. All other areas will be
landscaped/open areas. These land use areas are summarized as
follows:
Area
Land Use
Square Feet
Acres
Per Cent
Building and Parking
11,955
0.27
52.8
Open Space
6,490
0.15
28.7
Street Right -of -Way
4,185
0.10
18.5
TOTALS
22,630
0.52
100.0
I N T R O D U C T I O N
This Drainage and Erosion Control Report is being prepared in
conjunction with preliminary site plans for the development of an
eight (8) unit complex along Orchard Place. This report has been
prepared to meet the requirements of the City of Fort Collins Storm
Drainage Design Criteria and Construction Standards as they apply
to this project.
PRELIMINARY DRAINAGE AND
EROSION CONTROL REPORT
FOR
ORCHARD PLACE EIGHT-PLEX
For
Lew, Ltd.
P.O. Box 271035
Fort Collins, Colorado 80527
June, 1993
Prepared by
FOUNDATION ENGINEERING
CONSULTING ENGINEERS, LTD.
100 East Third Street
Loveland, Colorado 80537