Loading...
HomeMy WebLinkAboutSUNSHINE HOUSE AT BUCKING HORSE - FDP190016 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSThe Benchmark Statement has been revised. The City has moved to the NAVD88 vertical datum, and as of January 1, 2015, all projects are required to be on NAVD88 datum. Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 DATUM - X.XX'. NE Response: Statement updated. Comment Number: 4 Comment Originated: 08/05/2019 08/05/2019: FOR FINAL APPROVAL: All Benchmark Statements must match on all sheets. NE Response: Statement updated. Comment Number: 5 Comment Originated: 08/05/2019 08/05/2019: FOR FINAL APPROVAL: There are text over text issues. See redlines. NE Response: Redlines have been addressed. Topic: Easements Comment Number: 6 Comment Originated: 08/05/2019 08/05/2019: FOR FINAL APPROVAL: There are some issues. See redlines. NE Response: Redlines have been addressed. Topic: Site Plan Comment Number: 1 Comment Originated: 08/05/2019 08/05/2019: FOR FINAL APPROVAL: Please revise the legal description as marked. See redlines. Response: Legal has been updated. Comment Number: 2 Comment Originated: 08/05/2019 08/05/2019: FOR FINAL APPROVAL: There are line over text issues. See redlines. Response: Corrected. Page 8 of 8 Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees related to this project: http://www.fcgov. com/uti I ities/bu siness/b u ilde rs-and-developers/plant-i nvestmen t-development-fees Response: Noted. Comment Number: 2 Comment Originated: 08/06/2019 08/06/2019: FOR DCP: Light & Power will require AutoCAD files of the Site Plan, Utility Plans, and Landscape Plans prior to the Entitlement Process approval. Response: Noted, CAD will be provided. Comment Number: 3 Comment Originated: 08/06/2019 08/06/2019: FOR INFORMATION: Please reference our policies, construction practices, development charge processes, electric services standards, and fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Response: Noted. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcqov.com Topic: General Comment Number: 1 Comment Originated: 08/05/2019: THANK YOU for incorporating the garden area and garden boxes into overall site design and programming. Fort Collins has a 40-yr history of integrating nature into the city's fabric and encouraging a variety of experiences to interact with nature. Incorporating garden amenities into the childcare center supports the Fort Collins Nature in the City Strategic Plan. https://www.fcgov.com/natureinthecity/pdf/natu re -in -the -city -executive -summary. pdf?l536590703 Response: Thank you. Comment Number: 2 08/05/2019 Comment Originated: 08/05/2019 08/05/2019: THANK YOU for clearly identifying on site and landscape plans current 1000-ft buffer from existing City of Fort Collins water treatment plant and the 1000-ft buffer if/when a future water treatment plant expansion occurs. This aligns with requirements set for approval. Response: Thank you. Comment Number: 3 Comment Originated: 08/05/2019 08/05/2019: READY FOR MYLARS. Environmental Planning is ready for mylars. Response: Thank you. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty@fcgov.com Topic: Construction Drawings Comment Number: 3 Comment Originated: 08/05/2019 08/05/2019: FOR FINAL APPROVAL: Page 7 of 8 the pedestrian entrance to the east side where it could still provide a 32" unobstructed pathway to each container. Response: Detail has been modified to have pedestrian entrance on side opening of enclosure for easier access, front pedestrian gate has been removed. Due to post already having been set for service gates the service gates cannot be centered. Department: PFA Contact: Andrew Rosen, 970-416-25997 arosen@poudre-fire.orq Topic: General Comment Number: 1 Comment Originated: 07/31/2019 07/31/2019: FOR INFORMATION >The gates with Knox padlocks are noted in the fence on the provided plan set dated 7-17-2019 to provide the required perimeter access to the entire building as discussed. >Thank you for extending the Fire Lane throughout the existing parking area to enable a loop. No further action required for access Response: Thank you. Comment Number: 2 Comment Originated: 07/31/2019 07/31/2019: FOR FINAL APPROVAL FIRE DEPARTMENT CONNECTION (FDC) The Riser Room is noted on the plan set in the south-west corner of the building. Please also show the FDC at that location for approval. The project team has acknowledged that the building will be designed with an approved fire sprinkler system. Please call PFA at 970-416-2891 with any fire sprinkler related questions. Response: FDC has been added to the south-west corner. Connection shown on elevations and site and landscape and utility plans. Comment Number: 3 Comment Originated: 07/31/2019 07/31/2019: FOR INFORMATION BUILDING PLAN REVIEW SUBMITTAL When you submit for your building permit though the City of Fort Collins please be advised Poudre Fire Authority is an additional and separate submittal. The link for Poudre Fire Authority's plan review application can be found at hftps://www.poudre-fire.org/online-services/contractors-plan-reviews-and-permit s/new-b u i Id i ng-p Ian -review -application. Response: Noted. Comment Number: 4 Comment Originated: 07/31/2019 07/31/2019: FOR INFORMATION ADDRESSING The Logo and name are noted on the west elevation with a monument sign showing the address number at the entrance. Response: Noted. Department: Light And Power Contact: Cody Snowdon, 970-416-2306, csnowdon@fcqov.com Topic: General Comment Number: 1 Comment Originated: 08/06/2019 08/06/2019: FOR INFORMATION: Page 6 of 8 08/06/2019: INFORMATION ONLY: The Community Recycling Ordinance (No. 109 2016) requires that all new business and multifamily complexes subscribe to recycling service that is at minimum 1 /3 of their overall service capacity (total bin capacity x number of weekly pickups, include both trash and recycling when calculating overall service capacity). In general recycling containers must be at least 50% the size of proposed trash containers to meet this requirement. Please make sure proposed containers meet this requirement and that adequate space is provided in all enclosures. Response: Noted, more than adequate space has been provided for facility. Comment Number: 2 Comment Originated: 08/06/2019 08/06/2019: FOR FINAL APPROVAL: Please label the proposed dumpsters "trash" or "recycle" as applicable. Response: Detail has been updated to show trash and recycle label on the bins. Comment Number: 3 Comment Originated: 08/06/2019 08/06/2019: INFORMATION ONLY: It is recommended to use two dumpsters (one for trash and one for recycling) rather than carts for recycling. Carts are not an efficient method of collecting cardboard (which is required to be recycled) and they can quickly overflow from large or not perfectly broken-down boxes. In general it is cheaper to have a larger container that is serviced less frequently then it is to have smaller containers serviced more frequently. Response: Option for both recycling dumpster and rolling carts has been shown and will owner discretion on best fit for facility. Trash will be dumpster. Comment Number: 4 Comment Originated: 08/06/2019 08/06/2019: FOR FINAL APPROVAL: Per standard 3.2.5 of the City's Land Use Code trash and recycling enclosures are required to be constructed of masonry, metal or other durable material. Wood fencing is not considered to be a durable material in this application, though it can be used to finish the exterior of the enclosure to compliment the development to which it is associated. Similar to the proposed gate design if wood fencing is desired it should be internally framed with metal or other like material to increase its longevity. Response: As discussed at staff review the posts and concrete pad have already been installed. Owner and City agreed that providing additional 67x6" posts at no greater than 4' spacing along dumpster enclosure interior wall as well as angle stop for dumpsters will protect the enclosure from damage. Detail has been modified to show this. Comment Number: 5 Comment Originated: 08/06/2019 08/06/2019: FOR FINAL APPROVAL: Per standard 3.2.5 of the City's Land Use Code trash and recycling enclosure gates and associated latches/hinges/posts should be constructed of metal or other durable material. Wood posts have not been found to hold up long term in this application. Response: Please see response to above comment. Note has been added for all gate hinges and latches to be metal commercial grade. Comment Number: 6 Comment Originated: 08/06/2019 08/06/2019: FOR FINAL APPROVAL: The main service gates on the proposed trash and recycling enclosure do not provide efficient servicing conditions for the eastern dumpsters within the enclosure. There is only -5.5' between the dumpster and eastern side of the gate that the -4' dumpster would need to pass through to be removed without removing the first dumpster as well. It is recommended to center the service gates on the front of the enclosure and move Page 5 of 8 replaced with a solid lid. Comment Number: 7 Comment Originated: 08/05/2019 O8/05/2019: The volume required for the rain gardens is ponding into the parking lot. This volume needs to be retained within the RG. Small retaining walls may be needed to meet this requirement. NE Response: Water will flow into overflow risers prior to ponding into parking lot. Comment Number: 8 Comment Originated: 08/05/2019 08/05/2019: Please label the dimensions for the concrete wall/flush curb between the rain garden and the tree landscaped area. NE Response: Dimensions added and rain garden cross -sections added. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 1 Comment Originated: 08/05/2019 08/05/2019: Please design and show the water and sewer services all the way to the building to ensure placement and separation requirements. NE Response: Services are now shown extending to building. Department: Forestry Contact: Nils Saha, , nsaha@fcqov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL The symbols for hackberries do not match between LP100 and LP101 (please see redlines). Additionally, there are two different symbols for hackberries shown on LP101. Response: Symbols have been shown with correct center mark rotation. Comment Number: 2 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL Please adjust the location for the Texas red oaks north of the parking lot to maintain a 10' separation between shade trees and storm sewers. Please see redlines. Response: Texas red oak has been shifted for adequate clearance. Comment Number: 3 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL The two Kentucky coffeetrees proposed in the southwest corner are approximately 25' apart. Please switch one of these to an ornamental or a columnar species. Response: Coffeetree has been replaced with ornamental tree. Department: Environmental Services Contact: Jonathon Nagel, 970-416-2701, jnagel@fcqov.com Topic: General Comment Number: 1 Comment Originated: 08/06/2019 Page 4 of 8 not warranted at this time, and the daycare will be adding less than 10 trips in the peak hour to the westbound right turn movement, where there could be consideration for a future right turn lane. A warrant for a turn lane is 40 trips in the peak hour. The existing traffic volume is 33. Given the low impact from this proposal, and the fact that the warrant may or may not be met, staff has determined that no contribution towards the lane will be required. Bottom line, there is no required fee in lieu from the Sunshine House proposal for transportation improvements. Response: Noted, thank you. Department: Stormwater Engineering Contact: Basil Harridan, 970-224-6035, bhamdan@fcgov.com Topic: Erosion Control Comment Number: 2 Comment Originated: 08/01/2019 08/01/2019: FOR FINAL APPROVAL: Please address the reclined comments provided. ESC is ready for mylars once these minor issues are addressed. NE Response: Redlines have been addressed. Comment Number: 3 Comment Originated: 08/01/2019 08/01/2019: FOR FINAL APPROVAL: An ESC Report specific to this site will need to be provided. NE Response: Erosion control report has been prepared. Contact: Marsha Hilmes-Robinson, 970-224-6036, mhilmesrobinson@fcgov.com Topic: Floodplain Comment Number: 1 Comment Originated: 07/31/2019 07/31/2019: For FINAL: On the Site Plans and Utility Plans, please remove the line labeled as "500-year Floodplain Limits with Current Topography". Response: Line and label have been removed from planning set cover, site, tree protection and landscape plan as well as utility plans. Contact: Wes Lamarque, 970-416-2418, wlamarque@fcqov.com Topic: General Comment Number: 4 Comment Originated: 08/05/2019 08/05/2019: Please show and label how drainage will enter the rain gardens. Forebays are also required for energy dissipation and sediment collection. NE Response: Per discussion at staff review, water will sheet flow into rain gardens over flush curb, negating the need for forebays. Comment Number: 5 Comment Originated: 08/05/2019 O8/05/2019: Please clarify what rain garden detail is being used. Is small 1-foot retaining walls required to meet the volume? You can cross out the part of the detail that is not being used. NE Response: No wall is required, and detail has been updated. Comment Number: 6 Comment Originated: 08/05/2019 08/05/2019: The existing inlets in both rain gardens need to be removed or Page 3 of 8 O8/05/2019: FOR APPROVAL: On site plan, please revise references to "Modifications Requested" to "Approved Modifications." Response: Edit has been completed. Comment Number: 4 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL: Please see redlines on site/landscape plan set. Response: All redlines have been addressed. Comment Number: 5 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL: Please include the existing street trees to be protected on the Existing Conditions and Demolition Plan (Sheet C100) of the utility plan set. NE Response: Approximate location of existing trees added and note stating to protect in place added. Department: Engineering Development Review Contact: Spencer Smith, 970-221-6603, smsmith@fcqov.com Topic: General Comment Number: 1 Comment Originated: 08/02/2019 08/02/2019: FOR APPROVAL Is there a missing detail on sheet LS501 of the Site Plans? Response: Several additional details have been added for playground curbing. Some detail shad to be renumbered to fit new details. Comment Number: 2 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL Please change all references in the emergency access easement documents to "Emergency Access Easement" rather than "Fire Access Easement". Also, add "Exhibit 'A'" to the top of the legal description and exhibit to match how the documents are referenced in the easement agreement. See redlines. NE Response: Exhibit has been updated. Comment Number: 3 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL See utility plan redlines for comments on cover and existing conditions/demolition plan as well as easement and site plan redlines for additional comments. NE Response: Redlines have been addressed. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 08/06/2019 08/06/2019: FOR INFORMATION ONLY The TIS has been received, reviewed, and the conclusions accepted. Response: Noted, thank you. Comment Number: 2 Comment Originated: 08/06/2019 08/06/2019: FOR INFORMATION ONLY Staff has carefully reviewed the TIS, the standards for Level of Service, and the volumes and function of the intersection of Miles House and Drake. A signal is Page 2 of 8 Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax lcgov.corrdevelopmentreview August 09, 2019 Shelley Lamastra Russell + Mills Studios 506 S College Ave, Unit A Fort Collins, CO 80524 RE: Sunshine House at Bucking Horse, FDP190016, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, please contact your Development Review Coordinator, Todd Sullivan, at 970.221.6695 or tsullivan @fcqov.com . Comment Summary: Department: Planning Services Contact: Rebecca Everette, 970-416-2625, reverette@fcqov.com Topic: General Comment Number: 1 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL: In the next submittal, please include the additional exhibit for mitigation plantings on Lot 9, across from the parking lot (Clarkson property). Please add a note to the Conditions of Approval section of the site plan cover sheet to indicate that mitigation plantings will be coordinated with the property owners on Lots 9, 10 and 11.Once you have received confirmation of the mitigation preferences for all three property owners, please include that information for final documentation and to ensure that the Planning and Zoning Board conditions have been met. Response: Exhibits for lots have been included as well as correspondence email with Lot 9 and memo of phone conversation with Lot 10. Comment Number: 2 Comment Originated: 08/05/2019 08/05/2019: FOR APPROVAL: On sheet LS001, please update the title in the signature block on the site plan to read "Director of Community Development and Neighborhood Services" rather than "Director of Current Planning." Response: Title has been updated. Comment Number: 3 Comment Originated: 08/05/2019 Page 1 of 8