V. PROPOSED IMPROVEMENTS
The development of the site would consist of single-family
homes with new local streets. The off -site flows that enter the
site at the northwest corner would be conveyed by a swale that
spills out to the proposed Hampshire Road. The swale would have
to cross Featherstar Way in a 15" RCP culvert. Curb and Gutter
would carry most of the runoff to the corner of Marshwood Drive and
Willow Fern Way at the southeast corner of the site. A drainage
swale would divert the flows to the temporary detention basin to
the east.
VI. DEVELOPED DRAINAGE
Off -site flows that enter the northwest corner of the site
amount to 3.12 cfs for the 100-year storm and 0.85 cfs for the 2-
year event. The peak runoff leaving the developed site is 43.52
cfs and 11.98 cfs for the 100-year and 2-year storms, respectively,
I as shown in Table A for design point 1. The various concentration
points quantify on and off site runoff for the design of storm
drainage facilities.
A small drainage swale with trickle pan is proposed along the
landscape buffer near Drake Road to.convey the point discharge from
an existing 12" driveway culvert west of the site. The flow would
pass under Featherstar Way in a 15" culvert, continue in the swale
to a sidewalk culvert, and enter the gutter on Hampshire Road.
Flows from Drake Road would follow the curb returns into the
subdivision and follow the gutters and cross -pans to meet at the
intersection of Marshwood Drive and Willow Fern Way, as would most
all the site runoff. Flow would then exit the gutter through a
sidewalk culvert and flow into a swale that would carry the site's
runoff to the regional detention area.
The project will be constructed in three phases as indicated
in the Site Plan. At the ends of each curb and gutter a channel
must be constructed to carry the runoff to the excavated area of
the regional detention pond. Refer to the Drainage and Erosion
Control Plan for locations.
VII. EROSION CONTROL
Temporary erosion control will consist of a soil sealant to
be applied to bare ground just after overlot grading. Straw bales
are to be placed in the temporary channels constructed for Phase
I and II development.
Permanent vegetative erosion .control will be used in
conjunction with landscaping. Permanent revegetation of areas
disturbed by construction will be the responsibility of the
contractor. Seed will be applied by drilling and protected by
crimped straw mulch. Straw shall be applied at a.rate of two tons
per acre (minimum). Erosion control performance standards and
specific erosion control measures :will be completed in the final
drainage report.
' Hampshire Pond P.U.D.
i' Final Drainage Report
page 2
III. HISTORIC DRAINAGE
Historically, the site drains to the east and southeast into
Spring Creek. Off -site runoff flows onto the west side of the
property. A driveway culvert conveys a portion of the off -site
runoff to the northwest corner. The remainder sheet flows onto the
site along the north half of the west property line. An existing
roadside swale collects runoff from the south side of Drake Road
g and conveys it east to. the adjacent property (see plan and
1 calculations for sub -basin H-6).
Five sub -basins have been identified as H-1 through H-5 on the
final drainage plan. Drainage on the entire site will be affected
by the proposed development. The runoff coefficient for grass land
(C = 0.20) was used to obtain 2 and 100 year peak stormwater flows
at the concentration points. Table A in the appendix shows the
results of peak historical runoff calculations (H-1 to H-5).
IV. DESIGN CRITERIA
The drainage design criteria established by the Stormwater
Utility Department of Fort Collins are the guidelines used for the
study. The required ponding volume for the increased runoff from
the site is compared to the historic using the mdoel UDSWM2-PC.
Peak runoff is quantified at various design points as shown on the
final drainage plan.
Prior to the construction of the regional detention basin,
temporary measures are to be taken to alleviate the increased
runoff from the site. Storage will be obtained by increasing the
capacity of a natural sump area to the east of the site where the
future regional detention basin will be. The volume of excavation
will be determined by modifying the Stormwater Departments current
data from the Urban Drainage Storm Water Management Model (UDSWMM)
for Spring Creek Basin. The increased storage volume required for
the developed site is modeled by separating the Hampshire Pond
P.U.D. site from the originally modeled subcatchment (see notes for
Det'ention Analysis in the appendix). A conveyance element was
created to store the runoff from the new subcatchment that
represents the historic condition of the site.. This data set was
input to UDSWMM to obtain the base storage volume. Then, a second
data set was created to model the developed condition of the site.
The new subcatchment was changed by increasing the impervious area.
Another conveyance element representing a new channel from the site
to the storage basin was added, and the model run. The required
volume of excavation is the difference between the storage as
determined for the two runs (volume = 0.2 ac-ft.).
r ..
Final Drainage Report
for
Hampshire Pond P.U.D.
Fort Collins, Colorado
August, 1993
I. GENERAL
This report summarizes the results of a storm drainage study
conducted for the proposed development of Hampshire Pond P.U.D.,
to be located in the Northeast quarter of Section 28, Township 7
North, Range 69 West of the 6th Principal Meridian, in Fort
Collins, Colorado. Methods outlined in the Fort Collins Storm
Drainage Design Criteria were used in the calculations for the
stormwater runoff portion of this study. The Rational Method was
used to estimate peak stormwater runoff from the site. Summary
calculations and other supporting material are contained in an
appendix to this report.
II. SITE DESCRIPTION
The existing site is pasture land that slopes gently down
toward the east at approximately one percent grade. Native grasses
grow over the entire site with a large cottonwood tree growing
approximately 500' south of Drake Road along the west property
line. Several choke cherry trees grow along the fence on the north
side of the site.
Existing improvements on the site are irrigation laterals and
structures, and a roadside swale along Drake Road. A six inch
diameter ADS pipe from an off -site irrigation lateral extends 5
feet onto the site approximately 510 feet south of Drake Road. A
diversion structure exists in line and east of the ADS pipe. Both
are to be abandoned. A paved bike path has recently been
constructed in an access and utility easement along the south edge
of the property.
sumac St. L e Oc. $uFfolk
bourn
Promendd,
Shro shire 3 n Kingsb
\ n. ��• Cor;. Ryeland Ave. °'o a
Rom- c� o cr
¢ Pecan er illeDr. r° o Ct 6 R ugh Dr. e a
i °. Q °
Dorset C)� g W, mne Ova W. Stuart S}, Q
cf. Sr r Z
0 ¢ u°r m c c e
° Sf " o
Ross y G �i/�P Cn
i pr• ro CI. Glee
3o Lor^ono o 2 nirh ~ o o
Gt. u ... Cr Z = m
Cpfswpr C i r.
Merino Cf. d Or'IVp
W, Stuart A
ro iQ Ct. Panama .
Neil Dr n
Bel9 Morgan o
Ct. Ct.
�o r
Clydesdale e
cl desdole / Cr orge t� w o 5~
Ct.
Pipestone 9 g O
Charo s o Sca boro h
Dr. �' Gprdec Q • /prs yO°ir �e o nr. Ct
as Cr V d I I F r
v Aej c� c °ado\te n ��E Con
Ave. V �
o ! 5�r� °nrPos pr. oy c J Valle e d •-
uu b L
w Forti 4
81u
.t o . N �% N V
e
.,_O >° rOss Dr. c° C�cP ` �P -ompshire 5� Q Ct. r
&ue ss Dr. o o 0 0 1 0
d E
At. yol Cl. = ro i odi Ct. p
N
o. co Seccomb
T
o'\ , MCKep o' 1 I 1 E
Cie m Qny r0i, c� StjCt. Frrmcnl
o _
u
ktmm r.t Dr. `.Hull SL Ct.
i orr Zendt Dr. Faicon Dr
' 81 a Lac Cf. Michner Dr. '
..nc in p
' �rsette C� Or�O'C o 'r yOQ: I H I i ne Dr. 'Hiw=
17
' PIS
DEwee,
e Kinnison , Drive
" Dora
t Moffet Drive Binning
(rep. • O
_ v � tf mg at
m
1 L Devonshire U
0 Primrose Dr. Cir.
1
Cheshire S \ �'
°•� 0 1
� / = J Der by_Ct.
i
VICINITY MAP
i
Northern Engineering Services, Inc.
July 29, 1993
Mr. Glen Schleuter
Stormwater Utility
City of Fort Collins
235 Mathews
P.O. Box 580
Fort Collins, Colorado 80522-0580
re: Hamshire Pond PUD
Fort Collins, Colorado
Project No. 9317.00
Dear Glen:
Northern Engineering is pleased to submit this Drainage Study
for your review. It represents a study of the existing and
proposed runoff characteristics for a commercial site. Soil
erosion has also been included as an item of study in this report.
Your input during the initial design of this project have been
greatly appreciated. If you should have any questions or comments
as you review this report, please feel free to contact me at your
earliest convenience.
rSincerely,
NORRTHERN ENGINEERING SERVICES, INC.
/Tbrry P McEnany
11 Michael F. Jones, P.E.
11
420 S. Howes - Suite 106 • Fort Collins, Colorado 80521 • (303) 221-4158 • Fax (303) 221-4159
rig
FINAL DRAINAGE REPORT
for
H AM P S H I RE POND P_ U_ D
Fort Collins, Colorado
August 2, 1993
prepared by
NORTHERN ENGINEERING SERVICES, INC.
420 S. Howes, Suite 106
Ft. Collins, Colorado 80521
(303) 221-4158
Project No. 9317.00