HomeMy WebLinkAboutHAMPSHIRE POND PUD FINAL SECOND P AND Z BOARD HEARING - 44 93A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSthe homes lined up along the western boundary. Please look at the row of
houses that line Drake Road immediately north of my driveway. Mr. Storck
has stated that this is the same type of house to be built in Hampshire Pond.
The wood fence minus the brick columns would be the same. The sheds rising
above the fence would also be part of the landscape. The houses however would
be about fifty feet closer to the fence. These lots are fifty feet deeper
than those proposed for Hampshire Pond. The lots backing on Drake vary from
150 to 178 feet in depth. The lots on the western boundary of Hampshire Pond
vary from 100 to 120 feet in depth. Please consider the impact of dense de-
velopment of this nature on the three acre and eleven acre single family homes
adjacent to the western boundary.
If after this you feel this plan could be better, if you feel it could fit
better with the surrounding area, if the plan still seems unimaginative to
you, perhaps you should not discount these intuitive feelings and ask for
something better for this piece of land. Please make your decision based on
what could be and not out of a sense of resignation that this is about as
much as you can expect from this plan.
Sincerely,
V `� ••v I � �1�N�
Larry D. Kieft
•
•
October 19, 1993
Planning and Zoning Board
City of Fort Collins
281 North College
Fort Collins, CO 80524
Dear Members of Planning and Zoning Board:
Larry D. Kieft
2333 West Drake
Fort Collins, CO 80526
I am writing to you concerning the Hampshire Pond PUD which will be before
you again October 25, 1993. The preliminary hearing on this PUD was held on
August 30, 1993. It came before you again on September 27, 1993, and it was
denied final approval at that time and comes before you again at this time.
I have reviewed the proposed site plan by way of a copy of the plan received
from the city planning office. In reviewing the "new" site plan I noted one
difference from the proposed site plan of September 27, 1993. The change
added was a small movement east of Featherstar Way so that Lots 4 - 10 of
Block 1 achieve 120 foot depth. No additional width was added to any lots.
Only lots 2 and 3 of Block 1 are wider than 60 feet. The landscape buffer
remains the same with only lots 1 - 3 of Block 1 having a "green buffer"
from the property to the west.
Perhaps this was all you meant to accomplish when you requested that the de-
veloper look at reconfiguring the site plan. I hope that you willnot simply
accept this as proposed out of a sense of resignation that it's the best that
can be done with this plan. I hope that you will look at the overall devel-
opment of a flat, square piece of land and ask that something more creative
be proposed. As volunteers serving our community I appreciate the time you
devote to the Planning and Zoning Board, but I would ask that you take a few
more minutes to prepare before the meeting of October 25, 1993. Take these
few minutes and drive to the site. Please turn into our drive and sense the
impact of this site plan on the surrounding properties. Try visualizing the
n . r_ _ r
ALL DEVELOPMENT: NUMBERED CRITERIA CHART
ALL CRITERIA APPLICABLE CRITERIA ONLY
W, the c❑tenon
Is the criterion ovoliCa01e7 be :Oesfiea?
CRITERION ;?a Yes No If no, please explain
NEIGHBORHOOD COMPATABILITY
1. Social Compatability
2. Neignbonccoa Character
3. Land Use Conflicts
4. Aoverse Traffic Impact
PLANS AND POLICIES
��t.ncnci mivc r�uli
PUBLIC FACILITIES & SAFETY
6. Slreet Capacity
7. Utility C000city
✓
/
I
8. Design Standards
T
✓
✓
I
E-1—
9. Emergency Access
I ✓
✓
10. Security Lighting
I
11. We:er Hazoras
ktbUUkUl: FRUIEUTION
12. Sons & Slope Hazard
13. Significant Vegetation
14. Wilcafe HaalICT
15. Historicci Lancmarx
16. Mineral Decosit
17. Ecc-Sensilive Areas
18. Acr:cuitural Lanas
ENVIRONMENTAL STANDARDS
19 Air 7UCIIty
20. Wc'er QUCllty
21 Nc.se
2. G�cre & Heat
Vit:ctlons
24. Exterior Lionting
25. Sewcces & Wastes
SITE DESIGN
26. C :-.munity OrocnIZCTlon
27 Site Crganizcron
28. Nc ,:,ai FeCTUreS
29 Ene.-cy Ccnser c::on
30.Shcccws
31. Sc;cr Access
32. Pnvccv
33. Ccen Scace Arrcnaemem
✓ I I I
✓I I I
I I
✓ i I
I I I
.nu relunl I
I V I
cu;ar Movementc:::ar
Design
,/ I I
F38
-I Ie
�ecreancnei Areas I
I I:e
l�UlaCCr areas
I
Convenience
-'
---=sman C cnTIICTS
✓ I I
_caoing:Ccen Arecs
I i
CSCaoinc:3aua;nas I
I I
--
'csCaclna;Screenlna
= -
i
47• 4pla'
DRAKE ROAD LANDSCAPE DETAIL
nmY. em: w°eam.w.
0¢ryglW .I.Ti Y+ rd P4elY II¢. 4rt Y¢ y� fu
I xg t'r:.Rme
J�
PRIVACY FENCE
.< � - Nwe Slave mlumm.loM poke Rw mly.
PLANT LIST
—_ .c. cam•pnneNe
.ua aeemm
rsnse, ppmey.� ..
e:be.w� 'rer:
vrvq
w�wm
wee.: vm.
.w z
v+bkc�v.
sp.
/:°In+� �s'mwrnb'
°' up:°'
®ue obk:r141T fp.
xgplpya sp.
I nbwue�lmir:.wli.
um14
>w•I..M
fp.
xp.
V IPrr hvgb'°yp�6W'
crp uo..I
Gbry G:Ys1.BWm
sp. t
sp. e
rr
L>a�vm
Nec R:b.w...:�e:alm:.
mw�emne
Mp:c.•
sw a le m.s
mlp o:®Ip
warbnlp
to . m®
end.. mm-xro
I IofYil�®e�y.m
:1' I
LANDSCAPE NOTES
r .n�.+bp..rb.ypaw.wr.
I I��w.b°� ®n:�Arllb.rlu Mm w.arrru
6ruLLPaepe
ASMMM
PROJECT ENTRY SIGN
NWMSCALE
"vV
NORTHERN ENGINEERING SERVICES` 931 oo`e D0.
'� 21,
AAMPSHIRE PONDspU s q Ipp. °Ire. pp pR.pp apszlpE=,pNERILANDSCAPE PLAN (JOJ) "t21 -4156 pRARSMAN�GgEpgRm: LIM
0
•
V�fN w
OWNERS [SRT?I"rfd
otwuwon .c. M rimn murm u m m .w. m wor
ww a�
ATTORNEYS CEFIYFJGTd
A PROVROiuw..
w .. a.,.....e m..Pm
PROPER,; DEECRIF,ION'
arn.��Mi�u.oM
uwaM����n eanae_ u -V v nw'. ,aarvau
rwm M s
I
muu aasslxc ' I
991III` 91101PL'➢[IMRI1 I
F.l9tlW CDU1T II6 U
PHASED
PHASE III
. as
fA BlOSSOY a�
0 k o �'^f �667et iE o
NORTHERN ENGINEERING SERVICES
,,"MR mm sun 10C R'. COLLIIS. cmoR 60621
(300) 2MI166
F
0 . �3 _ -
- m
r�.
o�
Iy.nrn ®e ®.. m.1E14(D PoMD
HAMPSHIRE POND P.U.D. 1
SITE PLAN 1
9�eet
4
ITEM: HAMPSHIRE POND PUD North
NUMBER: 44-93 A
•
Hampshire Pond P.U.D., Final - #44-93A
October 25, 1993 P & Z Meeting
Page 7
approval of this planned unit development shall become null
and void and of no effect. The date of final approval for this
planned unit development shall be deemed to be the date that
the condition is met, for purposes of determining the vesting
of rights. For purposes of calculating the running of time for
the filing of an appeal pursuant to Chapter 2, Article II,
Division 3, of the City Code, the "final decision" of the
Board shall be deemed to have been made at the time of this
conditional approval; however, in the event that a dispute is
presented to the Board for resolution regarding provisions to
be included in the development agreement, the running of time
for the filing of an appeal of such "final decision" shall be
counted from the date of the Board's decision resolving such
dispute.
0 0
Hampshire Pond P.U.D., Final - #44-93A
October 25, 1993 P & Z Meeting
Page 6
Lots 24 & 25, Block 3, that provide connections from local streets
to the bicycle/pedestrian trail.
RECOMMENDATION:
This request is in substantial conformance with the approved
Hampshire Pond P.U.D., Preliminary and meets the applicable All
Development Criteria of the Land Development Guidance System. Staff
considers this request to be compatible with surrounding land uses
in the area. The two conditions of approval at preliminary,
requiring provisions for a future street access into the City -owned
property to the north and east and additional buffering between
this development and the property to the west, are considered to
have been met. Therefore, staff recommends approval of Hampshire
Pond P.U.D., Final - #44-93A with the following condition:
1. The Planning and Zoning Board approves this planned unit
development final plan upon the condition that the development
agreement, final utility plans, and final P.U.D. plans for the
planned unit development be negotiated between the developer
and City staff and executed by the developer prior to the
second monthly meeting (December 13, 1993) of the Planning and
Zoning Board following the meeting at which this planned unit
development final plan was conditionally approved; or, if not
so executed, that the developer, at said subsequent monthly
meeting, apply to the Board for an extension of time. The
Board shall not grant any such extension of time unless it
shall first find that there exists with respect to said
planned unit development final plan certain specific unique
and extraordinary circumstances which require the granting of
the extension in order to prevent exceptional and unique
hardship upon the owner or developer of such property and
provided that such extension can be granted without
substantial detriment to the public good.
If the staff and the developer disagree over the provisions to
be included in the development agreement, the developer may
present such dispute to the Board for resolution if such
presentation is made at the next succeeding or second
succeeding monthly meeting of the Board. The Board may table
any such decision, until both the staff and the developer have
had reasonable time to present sufficient information to the
Board to enable it to make its decision. (If the Board elects
to table the decision, it shall also extend the term of this
condition until the date such decision is made.)
If this condition is not met within the time established
herein (or as extended, as applicable), then the final
Hampshire Pond P.U.D., Final - #44-93A
October 25, 1993 P & Z Meeting
Page 5
Signage:
One project identification sign is being proposed and will be
located on the west side of the main entry into the development at
the intersection of West Drake Road and Hampshire Road. The signage
will be individual letters mounted on the 6' high solid wood fence,
centered between 2 stone columns, along a rear lot line.
Solar Orientation Ordinance:
All 73 lots in this development are subject to the City's Solar
Orientation Ordinance. A total of 55 lots comply with the
requirements of the ordinance, equalling 75%, and this exceeds the
minimum 65% compliance requirement.
4. Transportation:
This development will be accessed from West Drake Road by two local
public streets that will connect to a local public street network
internally. There is a street connection being provided, at the
southwest corner, for future access into the property to the west
when development should occur. Also, a street connection for future
access into the City -owned property to the north and east is being
provided on this development. This meets and satisfies the intent
of the condition placed on the Hampshire Pond P.U.D., Preliminary
that stated that "the developer of Hampshire Pond is required to
provide adequate street right-of-way and a publicly dedicated
temporary turnaround on this property and/or the City -owned
property to the north and east (and south of West Drake Road) of
Hampshire Pond prior to a final development request going before
the Planning and Zoning Board for a decision".
5. Storm Drainage:
This property is 22.79 acres in size, overall. However, the City
Stormwater Utility will be purchasing a 4.87 acre parcel of land
located on the southeast portion of the property. This land
acquisition becomes part of the City's regional detention facility
planned for this area.
6. Parks & Recreation:
A 30' wide utility and public access easement is being dedicated
on -site along the entire south property line to provide for the
City bicycle/pedestrian trail that is planned for and currently
under construction. The trail meanders through the easement
providing a separation of 3' to 8' between the trail and the rear
lot lines. There are two access easements, between Lots 14 & 15 and
0 •
Hampshire Pond P.U.D., Final - #44-93A
October 25, 1993 P & Z Meeting
Page 4
for the installation of a 2" caliper shade tree per street
frontage.
Fencing:
The developer will be responsible for perimeter fencing as shown on
the Site Plan. A 6' high wood privacy fence will be provided along
the rear of the lots abutting the West Drake Road streetscape, the
entire west property line (from the south edge of the West Drake
Road streetscape to the north line of the public access easement),
and along the east property line from the south edge of the West
Drake Road streetscape to the north line of the regional detention
area (Tract 'H'). A 4' high three -rail fence will be provided along
the rear of the lots adjacent to the public access easement
(housing the City trail) and along the portion of the east property
line adjacent to the regional detention area. Side lot line privacy
fences will transition to a 4' height where they meet the three -
rail fences on lots abutting the public access (trail) easement and
regional detention pond.
Buffering:
The Planning and Zoning Board placed a condition on the approval of
the Hampshire Pond P.U.D., Preliminary stating that "more buffering
be provided to the west because this development is the more
intensive use", meaning that there were concerns about the type and
amount of buffering between the urban -sized lots in this
development and the large acreage properties to the west. Possible
solutions offered by the Board at the meeting included eliminating
one or more lots on the west side of Featherstar Way to allow for
fewer and wider lots, realigning Featherstar Way to allow for
deeper lots on the west side of the street, and additional
landscaping to supplement the existing off -site landscaping on the
property to the west.
The developer has eliminated one lot from the tier of eleven 60,
wide lots west of Featherstar Way and incorporated the area into
two lots immediately adjacent to the existing single family
residence to the west. These two lots are now 90' wide and the
developer is providing 5 large deciduous trees and 10 large
deciduous shrubs on the rear of Lots 1 through 3, Block 1. Also,
Featherstar Way has been realigned to provide an additional 20' of
lot depth beginning with the third lot south of West Drake Road.
The first two lots vary from 103' to 116' in depth. The increased
lot depths occur as soon as possible, taking into consideration the
required street tangent lengths and curve radii to meet City
standards. Staff believes that this satisfies the intent of the
Board's condition.
Hampshire Pond P.U.D., Final - #44-93A
October 25, 1993 P & Z Meeting
Page 3
COMMENTS:
1. Background
The surrounding zoning and land uses are as follows:
N: RP, BP; existing single family residential and shopping
center (Hampshire Court, Drake Crossing)
S: FA-1; large acreage residential in Larimer County
E: RP; existing single family residential
W: Rp, FA-1; existing large acreage single family residential in
the City and Larimer County
The property was annexed into the City with the West Drake Road
Annexation in April, 1987 and zoned RP, Planned Residential with a
planned unit development condition attached.
The Hampshire Pond P.U.D., Preliminary was approved by the Planning
and Zoning Board on August 30, 1993 with two conditions attached.
The conditions related to a provision for future access from this
property to the City -owned property to the north and east, and
additional buffering between this development and the property to
the west.
2. Land Use•
This is a request for final approval of 73 single family lots on
17.93 acres. The development is divided into, and will be
constructed in, three phases. The overall property under one
ownership is 22.79 acres; however, the City Stormwater Utility is
purchasing 4.87 acres from the developer for a regional detention
facility. The gross residential density for the "developable"
portion of the property is 4.13 dwelling units per acre. The
request is in substantial conformance with the approved Hampshire
Pond P.U.D., Preliminary and meets the Applicable All Development
Criteria of the Land Development Guidance System.
3. Design:
Landscaping:
A 45' landscape buffer, including a 4' wide detached sidewalk, is
being provided along the West Drake Road frontage incorporating
shade trees at 40' on -center in the parkway, ornamental and
evergreen tree groupings along rear yard fences, and planting beds
with a mix of deciduous and evergreen materials at the entries into
the development.
The developer is providing each homeowner with a certificate good
Hampshire Pond P.U.D., Final - #44-93A
October 25, 1993 P & Z Meeting
Page 2
deciduous shrubs on the rear of Lots 1 through 3, Block 1. Also,
Featherstar Way has been realigned to provide an additional 20' of
lot depth beginning with the third lot south of West Drake Road.
Staff believes that this satisfies the intent of the Board's
preliminary condition requiring more buffering by this development
to the large acreage property to the west.
ITEM NO. 12
MEETING DATE 10/25/93
STAFF Steve Olt
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Hampshire Pond P.U.D., Final - #44-93A
APPLICANT: Richard R. Storck
Storck Development Corp.
4401 McMurray Avenue
Fort Collins, CO. 80525
OWNER: Same as Applicant
PROJECT DESCRIPTION:
This is a request for final planned unit development (P.U.D.)
approval for 73 single family residential lots on 17.93 acres
located south of West Drake Road and west of South Taft Hill Road.
The property is zoned rp, Planned Residential with a P.U.D.
condition attached.
RECOMMENDATION: Approval with a condition
EXECUTIVE SUMMARY:
This is a request for final planned unit development (P.U.D.)
approval for 73 single family residential lots on 17.93 developable
acres (22.79 acres overall) located south of West Drake Road and
west of South Taft Hill Road. It is in substantial conformance with
the approved Hampshire Pond P.U.D., Preliminary and meets the
applicable All Development Criteria of the Land Development
Guidance System. There is an extensive landscape buffer, with entry
features, along the West Drake Road frontage and the developer is
providing for one street tree per lot frontage throughout. One
project identification sign is being proposed and will be located
on the west side of the main entry into the development at the
intersection of West Drake Road and Hampshire Road. The request is
in compliance with the Solar Orientation Ordinance, with 750 of the
applicable lots meeting the requirements. Staff considers this
request to be compatible with the land uses in the surrounding
area. The City Stormwater Utility is purchasing a 4.87 acre parcel
from the developer to function as part of its regional detention
facility for the area. A public access easement for a City
bicycle/pedestrian trail is being dedicated along the entire south
property boundary. A street connection for future access into the
City -owned property to the north and east is being provided on this
development. This satisfies the condition placed on the Hampshire
Pond P.U.D., Preliminary. Two lots immediately adjacent to the
existing single family residence to the west are 90' wide and the
developer is providing 5 large deciduous trees and 10 large
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Boy SHO Fort C ofims, CO 80522-0380 (303) 221-6750