HomeMy WebLinkAboutSUMMERHILL PUD PRELIMINARY - 41 93 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
X##i#iXXYXXXiiiiiXl.XiiiXXXii#iiii#XX#i#XiXXXXii##iiii#iiiiXX#iYiiiXXX
IDENTIFYING INFORMATION
-------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
prospect
NAME OF THE NORTH/SOUTH STREET.......
underhill
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
7/2/93
TIME PERIOD ANALYZED .................
am aml 1995
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
--------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
--- ---- ---- ----
LEFT 10 15 5 10
THRU 370 705 1 1
RIGHT 10 15 10 5
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB
S8
-------
-------------- -------
LANES 2 2 1
1
i.r.NE Uc,Ar:: 1.1f:
1. 1:�
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- -------- --------- ---- ------------------- --
MINOR STREET
NB LEFT 6 142 137 > 137 > 132 > D
THROUGH 1 174 169 > 296 169 > 279 168 >C D
RIGHT 11 862 862 > 862 > 851 >
MINOR STREET
SB LEFT 11 142 136 > 136 > 125 > D
THROUGH 1 174 169 > 185 169 > 168 168 >D D
RIGHT 6 704 704 > 704 > 699 > A
MAJOR STREET
EB LEFT 11 464 464 464 453 A
WB LEFT 17 702 702 702 686 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... prospect
NAME OF THE NORTH/SOUTH STREET.... underhill
DATE AND TIME OF THE ANALYSIS..... 7/2/93 : am pr% 1995
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Paae-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... prospect
NAME OF THE NORTH/SOUTH STREET....... underhill
NAME OF THE ANALYST .................. mJd
DATE OF THE ANALYSIS (mm/dd/yy)...... 7/2/93
TIME PERIOD ANALYZED ................. a \ p/N/ 1995
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
------------------------ ------------ ---------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 5 5 10 15
THRU 660 300 1 1
RIGHT 5 5 15 10
NUMBER OF LANES AND LANE USAGE
------------- ------------------ ----------------------------------
EB WE NB SB
------- __ ----- __-___-
LANES = I
LANE USAGE I_TR LTP
CAPACITY AND LEVEL -OF -SERVICE Paae-3
----------------------------------------- ------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- ------- --------- ----------- ------------ ---
MINOR STREET
NB LEFT 11 176 173 > 173 > 162 > D
THROUGH 1 215 212 > 312 212 > 284 211 >C C
RIGHT 17 729 729 > 729 > 712 > A
MINOR STREET
SB LEFT 17 174 170 > 170 > 153 > u
THROUGH 1 215 212 > 249 212 > 221 711 >C C
RIGHT 11 901 901 > 901 > 890 > A
MAJOR STREET
EB LEFT 6 770 770 770 764 A
WB LEFT 6 499 499 499 493 A
IDENTIFYING INFORMATION
--------------------------------------------------------
NAME OF THE EAST/WEST STREET...... prospect
NAME OF THE NORTH/SOUTH STREET.... underhill
DATE AND TIME OF THE ANALYSIS..... 7/2/93 am pm 1995
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
X XXX#X#X###%#XXtZX##XXXX#tX###XXYX Y.#X#X#XXXX#XXYXMXX###X#X.Y(X####X###%
IDENTIFYING INFORMATION
--------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET.. 35
PEAK
HOUR FACTOR.. ...................
1
AREA
POPULATION
......................
100000
NAME
OF
THE
EAST/WEST STREET.........
prospect
NAME
OF
THE
NORTH/SOUTH STREET.......
westbridge
NAME
OF
THE
ANALYST ..................
mJd
DATE
OF
THE
ANALYSIS (mm/dd/yy)......
7/2/93
TIME PERIOD ANALYZED ................. am Pm 1995
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------- ___________
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
------------------------------------------ ----------------------
EB WB NB SB
____ ____ ____ ----
LEFT 0 40 10 --
THRU 370 725 0 --
RIGHT 20 0 20 --
NUMBER OF LANES
---------------------------------------------------------------------
ES WB NB SE.
------- ------- ------- -------
LANES--
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- ------ --------- ----------- ------------ ---
MINOR STREET
NB LEFT 11 138 133 > 133 > 122 > D
> 304 > 271 >C
RIGHT 22 857 857 > 857 > 835 > A
MAJOR STREET
WB LEFT 44 693 693 693 649
IDENTIFYING INFORMATION
--------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... prospect
NAME OF THE NORTH/SOUTH STREET.... westbridge
DATE AND TIME OF THE ANALYSIS..... 7/2/93 ; am p� 1995
OTHER INFORMATION....
1985 HCM: UNSIGNALIZED INTERSECTIONS Paae-1
............ *.... .... *.... *......
iZIkMY�Y�YY.'K lkt iMC lK�XX'.K>.Y W. Z't
IDENTIFYING INFORMATION
— -------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 35
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... prospect
NAME OF THE NORTH/SOUTH STREET....... westbridae
NAME OF THE ANALYST .................. mJd
DATE OF THE ANALYSIS (mm/dd/yy)...... 7/2/93
TIME PERIOD ANALYZED ................. Pm 1995
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------- --
EB WB NB SB
--- ---- ---- ----
LEFT 0 10 10 --
THRU 685 300 0 --
RIGHT 5 0 40 --
NUMBER OF LANES
---------------------------------------------------------------------
EB WB NB SB
------- -------------- -------
LANES 2 2 1 --
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------------------------------ ---
MINOR STREET
NB LEFT 11 173 171
RIGHT 44 718 718
MAJOR STREET
WB LEFT 11 483 483
IDENTIFYING INFORMATION
> 171 > 160 > D
> 437 > 382 >B
> 718 > 674 > A
483 472
NAME OF THE EAST/WEST STREET...... prospect
NAME OF THE NORTH/SOUTH STREET.... westbridae
DATE AND TIME OF THE ANALYSIS..... 7/2/93 am pm 1995
OTHER INFORMATION..._
APPENDIX D
1 qqs
P&A4 7&PFIC-
cSUMME2LFr«:
(n4.
I ,
(EO(-)AJbC-b
vI�, To
Vj(i-ie�L S
I
Jn
o-- 30017et5'
30017 Z S
d
�- 5//5
, F ! O140 NOSP(,3C
(60r37a
zo
4
�I
� II
— ()A)
I
I
"
I
I I
I �
APPENDIX C
No Text
APPENDIX B
WEST PROSPECT ROAD
EXISTING
5-PLEX INGLE FAMILY
ENVELOPE
CONVERT TO A -4 >
4 PLEX WITH
4 UNASSIGNED
PARKING SPACES
f
AND 4 COVERED 11
FINGLEFAMII �rt 61-3-T
SPACES. EXISTING m
5-PLEX
61
iIIL-----�
E-
cn
>
zi
EXISTING
S-PLEX
ENVELOPE
in
I i;f MAIL KIOSK 9z 67w 7/1,
EXISTING
5-PLEX
r ENVELOPE i59 I 57.5
)<
GAS EASEMENT
(TO BE
ABONDONED)
EXISTING ENVELUEE-
(FOR GARAGES)
TO BE ABANDONED 54.. Qj
s..
EXISTING WELL
45
EXISTING FAMILY
S-PL X -SINGLE
ENVELOPE
CHANGE TO A OL 9-5
6-PLEX ENVELOPE
WITH PARKING FMO' NEW AL
MERCER CAN PPROX. CANAL BANK
1.-'
14 VEHICLES 6
--15, u-nurry EASEMENT
APPENDIX A
Land Use
Summerhill PUD
62 d.u.
1981 Underhill PUD
222 d.u.
Table
1
Trip Generation
Daily
A.M.
Peak
P.M.
Peak
Trips
Trips
Trips
Trips
Trips
in
out
in
out
370
5
23
23
12
1310
17
82
82
42
Table 2
1995 Peak Hour Operation
Level of Service
Intersection AM PM
Prospect/Westbridge (stop sign)
NB LT D D
NB RT A A
WB LT A A
Prospect/Underhill (stop sign)
NB LT/T/RT C C
SB LT/T/RT C D
EB LT A A
WB LT A A
Table 2 shows the intersection operation at the two key
intersections using the traffic shown in Appendix C.
Calculation forms are provided in Appendix D. The stop sign
controlled intersections will operate acceptably. Acceptable
operation is defined as level of service D or better.
It is concluded that the key intersections accessing the
Summerhill PUD will operate acceptably. The Summerhill PUD
will generate significantly less traffic than the Underhill
PUD, which was proposed at this site in 1981.
co
Cl)
MEMORANDUM
co
O
0
o
TO: Eldon Ward, Cityscape
Od
Fort Collins Transportation Division
10
Fort Collins Planning Department
o
FROM: Matt Delich
Z
g
W
DATE: July 3, 1993
O
SUBJECT: Summerhill PUD traffic study (File: 9345MEM1)
w
z
Summerhill PUD is a residential development located south
aof
Prospect Road and approximately 1/2 mile west of Shields
Street in Fort Collins. It consists of 62 dwelling units on
Z
a
5.23 acres. The units are attached in 2 - 6 plex groupings.
r
Z
m
Access is proposed to Prospect Road via Westbridge Drive
co
on the east and Underhill Drive in the west -central portion
M
of this development. A reduced scale drawing of the
Summerhill PUD site plan is in Appendix A. Westbridge Drive
also serves as an access to the "Bridges" residential area to
the east of Summerhill PUD.
Since Prospect Road is currently being reconstructed,
current traffic counts could not be obtained. Therefore,
counts contained in a number of traffic studies were used to
synthesize the peak hour traffic. The synthesized traffic
depicts the conditions when Colorado State University is in
session. The synthesized peak hour traffic is shown in
Appendix B.
z
Trip generation was estimated using Trip Generation, 5th
W
Edition, ITE as the reference document. The townhome category
Z
(Code 230) was used in the trip generation calculation. Table
z
1 shows the daily and peak hour vehicle trips generated at the
LJ
"'
Summerhill PUD. In 1981 a residential development known as
>
Underhill PUD was proposed at this same location. Underhill
PUD consisted of 222 dwelling units on a larger site which
=
Z
extended south of the New Mercer Canal. However, in the
c�
o
Underhill PUD there were the same two accesses to Prospect
F
Road (Westbridge Drive and Underhill Drive). Table 1 also
Wo
o
shows the expected trip generation from the Underhill PUD.
N
The proposed Summerhill PUD will generate approximately 1/4
.
¢
the number of trips as the Underhill PUD. This is a
significant reduction in traffic at the two accesses to
Prospect Road.
W
s
Appendix C shows the 1995 peak hour traffic at the two
Q
intersections that access the Summerhill PUD. This traffic
Q
includes the background traffic from the existing dwelling
units along Underhill Drive. -And from the "Bridges" residential
area.