Loading...
HomeMy WebLinkAboutSPRING COURT STORAGE PUD FINAL - 50 93 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWindicate on the utility plans the general direction of drainage flow across the site. 7. Erosion control during construction is now a City requirement. Please indicate your erosion control plans on the utility sheet. 8. The property is located in the Spring Creek Drainage Basin. where development fees are $1691.00 per acre of new impervious surface. 9. Street oversizing fees are $5252.00 per acre for mini -storage warehouses. These fees are collected at the time of building permit issuance. Please call Matt Baker at 221-6605 for a prorated amount for this addition. 10. There are no Building Code issues at this time. Please submit a standard submittal of two sets of drawings to the building department for review. 11. The addition will be processed as an amendment to a PUD which will be reviewed by the Planning Department and forwarded to the Planning and Zoning Board for the final decision. Please submit an Auto -Related Uses Point Chart with the submittal (see attached). 12. We would encourage you to consider additional landscaping (some low deciduous and evergreen shrubs would be an improvement) along the perimeter of the site and anywhere else where it would be feasible. We would suggest some shade trees could be planted to add greenery and shade to the large expanse area of paving on the site. 13. Your amended PUD submittal should include a site and landscape plan (these can be combined) which shows details of the site, both existing and proposed. I have included a check sheet for submittal requirements for your information. CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: November 2, 1992 ITEM: Additional Storage Units (2800 square feet) APPLICANT: Jim Brown Mountain Plains.Constructors, Inc. PO 1059 1708 East Lincoln Fort Collins, CO 80524 LAND USE DATA: This is a proposal for two additional 20' by 70' storage buildings for mini storage warehouses, to locate between an ex isting.storage building and an existing car wash. The property is located in Spring Court Subdivision, between the railroad right- of-way and College Avenue, just north of the Glick Mobile Home Park and south of Stuart Street. COMMENTS: 1. The property is in the HB, Highway Business, Zoning District. There is an existing Planned Unit Development (PUD) on the property. This proposal would have to be processed as an. amendment to the Spring Court "Unit Development Plan" (PUD). 2. Light and Power does not have comments at this time, unless you anticipate the need for additional power. 3. Water and Sewer does not have comments at this time. 4. Poudre Fire Authority has two concerns. First, adequate fire and emergency access is required around the building. You may want to remove the parking that is shown, if it is not needed or used, to provide at least a 20' access drive. Second, you will be required to provide a fire hydrant within 400' of the new buildings. There are not adequate hydrants in the area now. There is a 6" water line on the site which could be used for the hydrant. You will need to show the hydrant details on a utility plan. 5. The property is in the Spring Creek floodplain. You will need to elevate the building 18" above the flood plain or wait until FEMA approves the amended flood plain maps that were submitted by the City. Stormwater Utility. Contact Glen Schlueter at 221-6589 for more information. 6. If the area is already paved, please submit a letter, addressed to the Stormwater Utility, indicating that there will be no increase in the amount of impervious area. Also 0 Comas ly Planning and Environments !rvices Planning Department City of Fort Collins November 6, 1992 Jim Brown Mountain Plains PO 1059 1708 E. Lincoln Fort Collins, CO Dear Mr. Brown: Constructors, Inc. 80522 For your information, attached is a copy of the Staff's comments concerning the Mini Storage Warehouse addition which was presented before the Conceptual Review Team on November 2, 1992. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. sincerely, KIIL- Kirsten Whetstone Project Planner Attachment xc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Project —Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6730