HomeMy WebLinkAboutHAMPSHIRE POND EAST PUD PRELIMINARY AND FINAL - 44 93C - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYCenter For Microcomouters
in Transportation
Center For
HCS: Unsionalized Intersection
Microcomputers
Release
In Transportation
2.1
Pape 1
HCS: Unsianalized Intersection Release 2.1
Paae "L
#MMMXM#MXM#####XY:.KMMXMMX##X###Y:XMXMMXXMXX
M.#M#MX#XM#XMXMXXMXX.KXXM:
XXXXMMXXX.RR%XMM#XXXXMX#YXMXtMXXXMMXMYXMMXXX<XMXXX#Y:X
X#K.KX Y.X##Y.MY.
File Name ................
Streets: (N-S) hampshire
(E-W)
drake
Major Street Direction....
EW
WorkSheet for TWSC Intersection
Length of Time Analyzed...
60 (min)
NB
SB
Analyst...................
mjd
Step 1: RT from Minor Street
Date of Analysis..........
8/15/95
--------------------------------------------
203
388
Other Information.........
am pm short
long
Conflicting Flows: (vph)
1093
601
Potential Capacity: (pcph)
Two-way Stop -controlled
Intersection
Movement Capacity: (pcph)
1093
881
-----------------------------------------------------------------------=
------------------------------------------
Prob. of Oueue-free State:
0.96
0.93
Eastbound
Westbound
Northbound
SOUthbound
--------------------------------_____________________
EB
L T
k; L T
R; L T
R;
L
T
R Step 2: LT from Major Street
____
WB
_- _--_-
-_
i---- ____ ----
No. Lanes 1 2<
i---- ____----
0; 1 2<
i---- ____
0; 0> 1
____
1;
---- _---
0>
_--_
1
--------------------------------------------------------
1 Conflicting Flows: (vph)
406
775
Stop/Yield
N;
N;
Potential Capacity: (pcph)
1038
658
Volumes 20 396
10; 35 660
115; 10 5
20;
55
5
50 Movement Capacity: (pcph)
1038
658
PHF .9 .9
.9; .9 .9
.9; .9 _9
.9;
.9
.9
.9 Prob. of Queue -free State:
0.96
0.96
Grade 0
MC's (%) 0 0
1 0
0; 0 0
0
0; 0 . 0
I
01
0
0
0
-------------------------------------------
0 Step 3: TH from Minor Street
----------
SU/RV's 0 0
CV's (%) 0 0
0; 0 0
0; 0 0
0; 0 0
0; 0 0
0;
0;
0
0
0
0
0 ---- "---'-'------'----'----
0 Conflicting Flows: (vph)
_NB-_-___--_-_SB
1231
1178
PCE's 1.1 1.1 1.1;
1.1 1.1
1.1; 1.1 1.1
1.1;
1.1 1.1
1.1
Potential Capacity: (pcph)
208
223
________________________________________________________________________
Capacity Adjustment Factor
due to Impeding Movements
0.92
0.92
Movement Capacity: (pcph)
192
206
Prob. of Queue -free State:
0.96
0.97
Adjustment Factors
--------------------------------------------------------
SB
Step 4: LT from Minor Street
NB
Vehicle
Critical
Follow-up
-------------------------------------------------
Maneuver
Gap (tg)
Time (tf)
Conflicting Flows: (vph)
1119
1171
------------------------------------------------------------------
Potential Capacity: (pcph)
204
189
Left Turn Major Road
5.50
.2.10
Major LT, Minor TH
Right Turn Minor Road
5.50
2.60
Impedance Factor:
0.89
0.89
Through Traffic Minor Road
6.50
3.30
Adjusted Impedance Factor:
0.92
0.92
Left Turn Minor Road
7.00
3.40
1 Capacity Adjustment Factor
due to Impeding Movements
0.85
0.90
Movement Capacity: (pcph)
________________________________________________________
174
169
i Intersection Performance Summary
FlowRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
Delay
LOS
By App
-------
i ------- ------ ----- ------
NS L 12 174 > 180
-----------
> 22.4
------
>
D
NB T 7 192 >
>
>
12.6
NB R 24 1093
3.4
A
SB L 67 169 > 172
> 36.5
>
E
SB T 7 206 >
>
>
23.6
F Sep R 62 881
4.4
A
EB L 24 658
5.7
B
0.3
j WB L 43 1038
3.6
A
0.2
` Intersection Delay =
i
I
2.4
J
Center For Microcomputers
In Transportation
Centter For
HCS: Unsignal>zeo Intersec€ion
Mi rocomputern
Kelease
Iri Transportation
_
r'age 1
HCS: Unsignalized Intersection Release 2.1
-
Page '
`
XiXXX##XXXXi##tXXX#XXXXXXX#L.X##XX#XX#XXXXXXXXXXXX#Xr'..X
�.1
X:t##K:K####
%k##R##XXXXXXX#X<#RX#X..Y:XXXY:XY:K tXXX#XXXXXX##X#YX.X X##XM'##XXXX#X
X:I.X)
File Name ................
Streets: (N-S) hampshire
(E-W)
drake
I
-Sheet for Intersection
Major Street Direction....
EW
Length of Time Analvzed...
60 (min)
---'--------------'----------------------------boob--
Step 1: RT from Minor Street
NS
SB
Analyst ...................
mid
Date of Analysis ...... ....
Other Information.........
8/15/95
am pm short
long
j
Conflictina Flows: (vph)
Potential Capacity: (pcph)
296
980
133
1186
Two-wayStop-controlled
p-controlled
Intersection
Movement Capacity: (pcph)
980
1186
boob ------bound------
-undo-----------
Prob, of Oueue-free State:
0.96
0.98
Eastbound
Westbound
Northbound 1
Southbound
---------- _---------------------------------------------
Step 2: LT from Major Street
WB
EB
L T
R; L T
ki L T
Ri
L
i
R
--------------------------------------------------------
No. Lanes 1 2<
0; 1 2<
0; 0> I
1',
0>
1
1
Conflicting Flows: (vph)
593
266
Stop/Yield
N;
N;
Potential Capacity: (pcph)
824
1234
Volumes 35 586
5; 15 216
50; 10 5
30:
95
5
15
Movement Capacity: (pcph)
824
1234
PHF .9 .9
.9p .9 .9
_9; .9 .9
.9;
.9
9
.9
Prob. of Oueue-free State:
0.98
0.97
GradMC'se(%) 0 0
01 0 0
0; 0 0
0,'
0
0
0
Step 3: TH from Minor Street
NB
SB
SU/RV's (%)i 0 0
0i 0 0
Oi 0 0
0:
0
0
0
CV's (%) 0 0
0: 0 0
0: 0 0
0i
0
0
0 j
Conflicting Flows: (vph)
906
884
PCE's 1.1 1.1 1.
1; 1.1 1.1
1.1; 1.1 1.1
1.1:
1.1 1.1
1.1
Potential Capacity: (pcph)
3222
332
_______________________________________________________________________
Capacity Adjustment Factor
due to Impeding Movements
0.94
0.94
Movement Capacity: (pcph)
304
313
Prob. of Queue -free State:
0.98
0.98
AdjustmentFactors
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
Vehicle
Critical
Follow-up
--------------------------------------------------------
Maneuver
Gap (tg)
Time (tf)
Conflicting Flows: (vph)
860
881
__________________________________________________________________
Potential Capacity: (pcph)
299
289
Left Turn Major- Road
5.50
.2.10
Major LT, Minor TH
Right Turn Minor Road
5.50
2.60
Impedance Factor:
0.92
0.92
Through Traffic Minor- Road
6.50
3.30
Adjusted Impedance Factor:
0.94
0.94
Left Turn Minor Road
7.00
3.40
Capacity Adjustment Factor
due to Impeding Movements
0.93
0.91
Movement Capacity: (pcph)
- - ------------------- ---------------------------------
277
262
Intersection Performance
Summary
FlowRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
------- ----- ------ ------
Delay
LOS
By App
NB L 12 277 > 286
------------
> 13.5
------
>
--------
C
NB T 7 304 >
>
>
7-6
NB R 36 980
3.8
A
SB L 117 262 > 264
> 25.6
>
D
SB T 7 313 >
>
>
23.1
SB R 19 1186
3.1
A
EB L 43 1234
3.0
A
0.2
WB L 19 624
4.5
A
0.2
Intersection Delay =
3.0
APPENDIX D
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release Z.1 Page 1
XYXXXXXXXXXXXXXXX/.......*....................... .XXXXX....... *1
File Name ................
Streets: (N-S) hampshire (E-W) drake
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 8/15/95
Other Information......... am prti sha-t long
Two-way Stop -controlled intersection
Eastbound Westbound Northbound Southbound
L T R; L T R; L T R; L T k
---- ---- ---- I ---- ---- ----I---- ---- ---- I ---_ ---- ----
No. Lanes 1 2< 0; 1 2< 0; 0> 1 1 0> 1 1
Stop/Yield N; W
Volumes 20 315 10; 35 528 115; 10 5 20: 55 5 50
PHF .9 .9 .9; .9 .8 .9; .9 9 .9; .9 .9 .9
Grade 0 0 0 0
MC's (%) 0 0 0; 0 0 0; 0 0 0{ 0 0 0
SU/RV's (%); 0 0 0; 0 0 0; 0 0 0I 0 0 0
CV's (%) 0 0 0; 0 0 0; 0 0 0; 0 0 0
PCE's ; 1.1 1_1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap
(tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.50
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minot- Road
6.50
3.30
Left Turn Minor
Road
7.00
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Paae 2
XYX... R.*......XXXXX.....*...... XXXX...... XX XXXXX XXXL.....YXZ.F XXXXI
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step is RT from Minor Street NB SB
Conflicting Flows: (vph)
162
322
Potential Capacity: (pcph)
1146
951
Movement Capacity: (pcph)
1146
951
Prob. of Queue -free State:
0.98
0.93
--------------------------------------------------------
Step 2: LT from Major- Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
325
643
Potential Capacity: (pcph)
1147
774
Movement Capacity: (pcph)
1147
774
Prob. of Queue -free State:
--------------------------
960_97
-----------0_
Step 3: TH from Minor Street
--------------------------------------------------------
---------
NB
SB
Conflicting Flows: (vph)
1018
966
Potential Capacity: (pcph)
277
297
Capacity Adjustment Factor
due to Impeding Movements
0.93
0.93
Movement Capacity: (pcph)
258
277
Prob. of Queue -free State:
--------------------------------------------------------
0.97
0.97
Step 4: LT from Minor Street
--------------------------------------------------------
NB
S8
Conflicting Flows: (vph)
905
958
Potential Capacity: (pcph)
279
258
Major LT, Minor TH
Impedance Factor:
0.91
0.91
Adjusted Impedance Factor:
0.93
0.93
Capacity Adjustment Factor
due to Impeding Movements
0.87
0.91
Movement Capacity: (pcph)
--------------------------------------------------------
243
235
Intersection Performance Summary
F1owRate
MoveCap
SharedCap
Avg.Total
Delay
y
Movement
--------
v
-(pcph)
CM(pcph)
------
----pcph)
----'-
Delay
By
NB
L
12
243 >
248
---------'--
> 15.7
-LOS--
------
> C
-App
---------
--
NB
T
7
258 >
>
>
9 3
NB
R
24
1146
3.2
A
SB
L
67
235 >
238
> 21.9
> D
SB
SB
T
R
7
62
277 >
951
14.7
4.0
A
ES
L
24
774
4.8
A
0.3
WB
L
43
1147
3 3
A
0 2
Intersection
Delay =
1.8
Center For
Microcomputers
In Transportation
Center For Microcomputers
In Transportation
HCS: Unsiqnalized Intersection Release 2.1
Page.l
HCS: Unsignalized Intersection Release 2.1
Page 2
WY:KXX.XXWX%X.W.W.Y.XXW:XW:W.W YXWXW%XYXt2WWXXXXX:K W.W M'XWWWYXXXI W. XW.'XYZXXW1Xk'
XX.tW.W:W.)KX..Y:ztYXZFXRW:Z1:XtW:R XXX.FY.LZ.KXY-<XXRXR<\:-KW.T.'Y. Y: t'K XYWYW.'K'Y.
W.X
)KW W.KXY
File Name ................
Streets: (N-S) hamshire
(E-W)
drake
Major Street Direction....
EW
WorkSheet for- TWSC Intersection
Length of Time Analyzed...
60 (min)
---------------------------------------------
Analyst ...................
mjd
Step 1: RT from Minor Street
NB
SB
Dateof Anal vsis..........
8/15/95
________________________________________________________
Other Information.........
am m hort
ps
long
Conflicting Flows: (vph)
240
112
Potential Capacity: (pcph)
1046
1215
Two-wayStop-controlled
Intersection
Movement Capacity: (pcph)
1046
1215
Prob. of State:
0.98
' Eastbound
Westbound
Northbound
Southbound
------free
---
----
L T
R; L T
R; L T
R;
L
T
R
Step 2: LT from Major Street
WB
EB
No. Lanes 1 2<
0; 1 2<
0; 0> 1
1;
0>
1
1
Conflicting Flows: (vph)
479
224
Stop/Yield
N;
N;
Potential Capacity: (pcph)
948
1300
Volumes 35 474
5; 15 174
50: 10 5
30:
95
5
15
Movement Capacity: (pcph)
946
1300
PHF .9 .9
.9; .9 .9
.9; .9 .9
.9;
.9
.9
.9
Prob. of Oueue-free State:
0.98
0.97
Grade 0
0
0
0
MC's (%) 0 0
01 0 0
0; 0 0
0;
0
0
0
________________________________________________________
Step 3: TH from Minor Street
NB
SB
SU/RV's (%); 0 0
0; 0 0
0; 0 0
0;
0
0
0
CV's (%) 0 0
PCE's i 1.1 1.1
0; 0 0
1.11 1.1 1.1
0I 0 0
1.1: 1.1 1.1
01
1.1;
0
1.1 1.1
0
1.1
0
________________________________________________________
Conflicting Flows: (vph)
750
726
---------------------------------------------------------
----
-----
Potential Capacity: (pcph)
397
409
Capacity Adjustment Factor
-
due to Impeding Movements
0.95
0.95
Movement Capacity: (pcph)
376
388
Adjustment Factors
Prob. of Oueue-free State:
----------------------------------------------------
0.98
0.98
Vehicle
Critical
Follow-up
Step 4: LT from Minor Street
NB
SB
Maneuver
Gap (t9)
Time (tf)
------------'-----------------------------------------
Conflicting Flows: (vph)
704
725
__________________________________________________________________
Left Turn Major Road
5.50
2.10
Potential Capacity: (pcph)
376
364
Right Turn Minor Road
5.50
2.60
Major LT, Minor TH
Through Traffic Mina- Road
6.50
3.30
Impedance Factor:
0.93
0.93
Left Turn Minor Road
7.00
3.40
Adjusted Impedance Factor:
0.95
0.95
Capacity Adjustment Factor
due to Impeding Movements
0.93
0.91
Movement Capacity: (pcph)
--------------------------------------------------------
350
333
Intersection Performance
Summary
i
FlowRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
Delay
LOS
By App
________ ______ ______ ______
NB L 12 350 > 359
------------
> 10.6
------
>
---------
C
NB T 7 376 >
>
>
6.3
NB R 36 1046
3.6
A
SB L 117 333 > 336
> 16.9
>
C
SB T 7 388 >
>
>
15.4
SB R 19 1215
3.0
A
i
EB L 43 1300
2.9
A
0.2
WB L 19 948
3.9
A
0.2
Intersection Delay =
2.4
APPENDIX C
Center For Microcomputers In Transportation
HCS: Unsionalized Intersection Release 2.1 Page 1
Y%ZZ�.ZZxxZZZZZxZZZxZZxxZZZZZxxZZZZxxxxZxxZZZxZZZxxxZZZZZZZZtx Y.ZZ
File Name ................
Streets: (N-S) hampshire (E-W) drake
Major Street Direction.... EW
Lenath of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 8/15/95
Other- Information......... am pr 1993
Two-way Stop -controlled Intersection
Eastbound I Westbound ' Northbound ; Southbound
L T R; L T R; L T R; L T k
--- ---- ---- I ---- ---- --- -- ---- ---- I ---- ---- ----
No. Lanes 1 1 0; 0 1 1, 0 0 0; 1 0 1
Stop/Yield N; N;
Volumes 19 457 763 1081 51 45
PHF .9 .9 i .9 .9; 1 _9 .9
Grade 0 0 0 i 0
MC's (%) 0 0 0 00 0
SU/RV's (%); 0 0 0 0; 0 0
CV's (%) 0 0 0 0; 0 0
PCE's 1.1 1.1 1.1 1.1� 1.1 1.1
__________________________-_______-_______________________________-_____
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver-
Gap (tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
`_,.30
Left Turn Minor
Road
6.50
3.40
Center For Microcomputers In Transportation
HCS: Unsionalized Intersection Release 2.1 Paae 2
xxx x.x xxxxxxxxx x.x xxxxzxxxxxxxxxx x.x xxxxxxxxxxxxxxxxxx x.rxxxx:xxxxxx x.
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB
--------
SB
--
--- ------ -----------------------------
Conflicting Flows: (vph)
763
Potential Capacity: (pcph)
569
Movement Capacity: (pcph)
569
Prob. of Queue -free State:
0.90
-------------------------------------------------------
Step 2: LT from Major- Street WB
------------------------------
EB
------------------------
Conflicting Flows: (vph)
871
Potential Capacity: (pcph)
659
Movement Capacity: (pcph)
659
Prob. of Queue -free State:
0.97
--------------------------------------------------------
Step 4: LT from Minor Street NS
S8
--------------------------------------------------------
Conflicting Flows: (vph)
1293
Potential Capacity: (pcph)
189
Major LT. Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
Movement Capacity: (pcph)
--------------------------------------------------------
182
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1
ZZ ZZZZZZZZZZZZZZZZZZZZZZtZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZ%ZZZZZ
Page 3
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay
LOS
By App
' SB L 63 182 30.2
E
j
19.3
SB R 55 569 '.0
B
EB L 23 659 5.7
B
0.2
Intersection Delay = 1.4
Center- For Microcomputers In Transportation
HCS: Unsionalized Intersection Release 2.1 Page 1
YYY X ZYYYZ Y Y Y % W.Y YYYYYY tYY Y f.%1Y. Y YIKY ZIKY Y.>YY Y'i %Y t ]KX t Y'KYY YY Y'I( %'A(%'I: Y'Y %Y.
File Name ............
Streets: (N-S) hampshire (E-W) drake
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 5 15/95
Other Information......... am pm 1993
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound I Sou thb ound
,
L T R; L T R; L T R; L T R
No. Lanes 1 1 0; 0 1 1; 0 0 0; 1 0 1
Stop/Yield N; N
Volumes 30 692 247 47; 1 89 11
PHF .9 .9 .9 .9; .9 .9
Grade 0 i 0 0 0
MC's (%) 0 0 ; 0 0; 0 0
SU/RV's (%); 0 0 0 0; 0 0
CV's (%) 0 0 0 0; 0 0
PCE's 1.1 1.1 1.1 1.1; 1.1 1.1
------------ ____________________________________________________________
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through, Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
Center For Microcomputers In Transportation
HCS: Unsionalized Intersection Release 2.1 Page 2
XtYYYMYY.XYY#RY...XXYYY.Y1[<K:KYK YYY YY YYYYYK.Y ZZYZYYZYZY YY..... M2YY t<'4
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
247
Potential Capacity: (pcph)
1038
Movement Capacity: (pcph)
1038
Prob. of Queue -free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street
WB EB
________________________________________________________
Conflicting Flows: (vph)
294
Potential Capacity: (pcph)
1242
Movement Capacity: (pcph)
1242
Prob. of Queue -free State:
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
-NB-----------SB
----------------- - --------------__----
Conflicting Flows: (vph)
992
Potential Capacity: (pcph)
282
Major LT, Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
Movement Capacity: (pcph)
--------------------------------------------------------
274
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
Y>"L YYl[F YYYY YYYt......iRYYZZYYYYYYYYICYYYt'KY....%Z Y'YYZYYY.....***Y%YY
Intersection Performance Summary
Flowkate
MoveCap SharedCap
Avg.Total
Delay
Movement
________
v(pcph)
______
Cm(pcph) Csh(pcph)
______ ______
Delay
------------
LOS By App
------ ---------
SB L
109
274
21.7
0
19.7
SB R
13
1038
3.5
A
EB L
36
1242
3.0
A 0.1
Intersection
Delay =
1.8
APPENDIX B
Q
IMATTHEW J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 805M
TABULAR SUMMARY OF VEHICLE COUNTS
Dm f 17 13 �y f4c,u bA U pity Fo 2 �' &41 AJ S R = Right turn
Obwrver S = Straight
�/
INTERSECTION OF f�h A M P S 41 R CE AND u K A fe- Cr L = Left tum
14-AA4PSWiO6 O r2A_KC: DR/-IK� ��
TOTAL SOfrom WEST TOTAL
BEGINS TIMEfrom NORTH from UTH North�^ EASTNALL
R S L Total R S L Total South R S I L I Tmal � R S L TOW
73v I I
745 1 t I
rcrra II 41
IS f of
28
z(p
j5
20
34
2-7I
zo
I
1
I
11
I
I II
I II
34
z�
1 9
ZC.)
14 s91
1(0 -)II
lilt I
I 1
17
3 11 L17
9 3 z,IS tl l2Zlo
1 II 1411s
II rll Co
z2s
1 o'4I
11?
Zy�r 332
131g 1134�
z i5 1z34
Ss4-ilao4
I
I
I
I
h
1
1
I
I
7so-B3o
I t I i
1 of
I
I
I t o 0
14 7
zk 7
1 Z 9 4 9 0
'� Z 21
I O 1 (9
i l l I Co
I i
I
I I
11
I
I
I I I
I If
II
f
I
I I
N
I
I I I
I
I
i
I I
I
I
I
I
I
I
I
II
I
I
I
I
I
¢3d
44 s�
sari
Iol
l
I(I
I
12
10
l(,
z31
z�
7-1
I 2
I
I
I
I
H 23
I 25
z l
Z'7
z31(ol
z7
Z3
35
t8?
IS
22(n)
I
i
I g
Z 1 4-
1 Z
I Z (
It2o
o
It
is1
3
8
z3
it 4
1 iZ 4
c
307
32 $ 1
Cv 13s'
37& 1140
330
3 s
3
430-5-3
45
S I
q !v.
�1 (o
7 f
05
19
4 7 (o,
13 4-*
4 4 3
APPENDIX`. A
Table 3
Short Range Peak Hour Operation
Level
of Service
Intersection
AM
PM
Drake/Hampshire
NB LT/T
C,
C
NB RT
A
A
SB LT/T
C
D
SB RT
A
A
EB LT
A
A
WB LT
A
A
Intersection
Drake/Hampshire
Table 4
Long Range Peak Hour Operation
Level of Service
AM PM
NB
LT/T
C D
NB
RT
A A
SB
LT/T
D E
SB
RT
A A
EB
LT
A B
WB
LT
A A
Table 1
1993 Peak Hour Operation
Intersection
Drake/Hampshire
SB LT
SB RT
EB LT
Land Use
26 Single Family Duplex
D.U.
Level of Service
AM PM
D E
A B
A B
Table 2
Trip Generation
Daily A.M.
Peak
P.M. Peak
Trips Trips
Trips
Trips Trips
in
out
in out
250 5
14
17 9
T
k�
9
m
0
W -
Q I \
x Na
i
x
�m
I^ Cm
00 �- 47/108
Lt"-w-- 247/763 DRAKE
30/19 1
592/457 -s-
AM / PM
1993 PEAK HOUR TRAFFIC Figure 1
-- - W - --
m
x N
a
i
x
' R- 50/115
"' a' — 290/880
--15/35 DRAKE
3Y20
790 525-r oN
510
/ �� AM / PM
- o ,r, Rounded to the Nearest
6 Vehicles.
SHORT RANGE PEAK HOUR TRAFFIC Figure 2
x N
CD
LO
a
s
x
,,In' � 50/115
LO a' 360/1100
} r-15/35 DRAKE
35/20 -�
980/660 -�
5/10 -�
I
o Ln o
o\ AM/PM
,., Rounded to the Nearest
6 Vehicles.
LONG RANGE PEAK HOUR TRAFFIC Figure 3
service E. When the Drake Road cross section is improved, this
operation should improve due to distributing the approach traffic
on Drake Road into two lanes. This will increase the number and
size of the gaps in the main street traffic.
Hampshire Ponds is a residential development, consisting of
74 single family detached dwelling units. It is currently under
construction. Therefore, the traffic forecasts for that
development were used at the Drake/Hampshire intersection.
Hampshire Ponds East is a residential development, consisting
of 26 single family duplex dwelling units. Table 2 shows the
expected daily and peak hour trip generation using rates contained
in Trip Generation, 5th Edition, ITE. The trip distribution used
was 75% to/from the east and 25% to/from the west.
Figure 2 shows the short range peak hour traffic at the Drake/
Hampshire intersection. This assignment also includes an increase
in background traffic on Drake Road. The recently approved "Fox
Creek" development is reflected in the background traffic. The
west access to Hampshire Ponds will not likely experience an
increase in traffic due to the proposed Hampshire Ponds East
development. Therefore, it was not evaluated in this traffic
study. The Drake/Hampshire intersection operates as indicated in
Table 3. Calculation forms are provided in Appendix C. Operation
will be acceptable at the Drake/Hampshire intersection. This level
of service calculation assumes that Drake Road will have a five
lane cross section. Based upon the traffic forecasts shown in
Figure 2, a signal is not warranted at this intersection.
Figure 3 shows the long range peak hour traffic at the Drake/
Hampshire intersection.. This reflects a year 2010 future as
performed for the Hampshire Ponds development. Table 4 shows the
operation at the Drake/Hampshire intersection. Calculation forms
are provided in Appendix D. Operation will be acceptable, except
for southbound left turns/throughs during the peak hour. The level
of service E operation is typical at stop sign controlled streets
along arterials during the peak hours. Operation will be
acceptable for 21-23 hours on a typical day. Using the traffic
forecasts shown in Figure 3, a signal will not be warranted at this
intersection. If a signal were warranted (based upon other
warrants that cannot be forecasted), it would be due to the traffic
on the north leg of Hampshire rather than the south leg.
It is concluded that the Hampshire Ponds East development will
not significantly impact the operation at the Drake/Hampshire
intersection. Operation of traffic movements from/to the south leg
of Hampshire Road will be acceptable in the short and long range
futures. A signal will not be warranted due to the traffic on the
south leg of Hampshire Road.
c
M
o
MEMORANDUM
co
O
0
o
To: Bret Larimer
�
d
Terence Hoaglund, Cityscape Urban Design
10
Eric Bracke, Fort Collins Traffic Engineer
o
Fort Collins Planning Department
gM
From: Matt Delich
W
>O
J
Date: August 18, 1995
w
Subject: Hampshire Ponds East traffic study
z
(File: 9578MEM1)
w
a
a
Hampshire Ponds East is a single family duplex
'z
residential development, located south of Drake Road and west
m
of Taft Hill Road in Fort Collins. Specifically, it is east
M
of the Hampshire Ponds residential development. Access will
be provided by extending Water Blossom Lane to the east.
Access to Drake Road will be via Hampshire Road. This traffic
study addresses the incremental increase in traffic due to the
Hampshire Ponds East development.
Drake Road is designated as an arterial street. In this
area, it currently has an enhanced two lane cross section.
There is curb and gutter on both sides of Drake Road. There
is a design project east of the Drake/Taft Hill intersection
that will include improvements to the west leg of Drake Road.
It is assumed that these improvements will enable Drake Road
to have a five lane cross section in this area.
Hampshire Road functions as a collector street north of
Q
Drake Road. It has a continuous, curvilinear alignment from
w
Drake Road to Prospect Road, which is the next arterial street
cm
to the north. Hampshire Road has stop sign control at its
w
intersection with Drake Road. Drake Crossing Shopping Center
LLi
J
is adjacent to Hampshire Road. Primary access to Drake
a
Crossing Shopping Center occurs directly from Drake Road, east
•
of Hampshire Road and Taft Hill Road. A windshield survey of
o
Hampshire Road indicates that development along it is
a
virtually complete. Therefore, traffic is not expected to
W
¢
increase significantly on Hampshire Road.
c
C)
a
z
Peak hour traffic volumes were obtained at the Drake/
—o
Hampshire intersection in May, 1993. These counts are
•
presented in Figure 1. Raw data is provided in Appendix A.
This intersection was evaluated using the 1994 Highway
W
LL
a
Capacity Manual (1994 HCM) technique for unsignalized
=
�..
¢
intersections. Table 1 shows the result of this analysis.
f—
Calculation forms are provided in Appendix B. All movements
¢
operate acceptably, except for the southbound left turns
during the afternoon peak hour. These operate at level of