Loading...
HomeMy WebLinkAboutHAMPSHIRE POND EAST PUD PRELIMINARY AND FINAL - 44 93C - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGNEIGHBORHOOD INFORMATION MEETING Pro Meeting Loc Attendees: Please sign this sheet. The information will be used to update the project mailing list and confirm attendance at neighborhood meetings. Contact the Planning Department (221-6750) if you wish to receive minutes of this meeting. Did You Receive Written NotificationAddress? of this meeting? correct Name Address Zip Yes No Yes No i(.f.cA.J./n :2Sso -P A1-T G/ 7`4F7- L S Hs « 20 C4 J �1 - �6 Aek, I T� /YUZa L-G , 2i `j FcAT�ECLSTAre, kiAy v L 14. 15. Comment: Traffic from 3 to 7 P.M. daily backs way up on Taft Hill Road. Question: How tall will the townhomes be? Answer: They will be about 24' tall. Question: What is your construction timetable? Answer: I would like to begin construction next spring, 1996, if all goes well. 17. Question: Will you construct all the units at one time? Answer: No, I won't. I want to do it as soon as possible to minimize disturbance. All the units will be built within one year, hopefully. 6. Question: The existing City bicycle path along the east side of the property will have to be abandoned? Answer: The City Parks & Recreation Department has indicated that the northern portion of the trail, from the end of the cul-de-sac to West Drake Road, will be abandoned once the new trail connection to South Taft Hill Road has been completed. 7. Comment: The increase in traffic from this development will necessitate a left turn signal at the intersection of West Drake Road and South Taft Hill Road. 8. Question: Why would the City abandon the existing bicycle trail? Answer: Once the connection to South Taft Hill Road is made there will be connections east to Taft Hill and north to West Drake Road at the entry to Hampshire Pond. This connection becomes unnecessary. 9. Question: What properties is the City buying along South Taft Hill Road? Answer: The City Stormwater Utility is buying the properties that are the existing Shamrock Manor Elderly Group Home. 10. Question: How far will the intersection improvements go? Answer: I can't answer that question tonight. I can ask the -Engineering Department for an answer and contact you at a later date. 11. Comment: It would have been a good idea to have a representative of the Engineering Department here tonight to answer questions about street and intersection improvements. 12. Question: The traffic study will provide what information? Answer: Vehicle trips generated by this development, how that affects the level of service on the streets and at the intersections, and what off -site street improvements might be necessary as a result of the impacts created by this development. 13. Question: What traffic controls are planned along Taft Hill Road? We have significant delays now. Answer: The traffic will help determine the measures necessary to maintain or improve levels of service. City of Fort Collins Date: Place: Developer: City Planner: Commu. .y Planning and Environmental cvices Current Planning Neighborhood Information Meeting Minutes for the HAMPSHIRE POND EAST P.U.D. August 17, 1995 Fellowship Bible Church Bret Larimer Steve Olt The following questions, continents, and concerns were expressed at a neighborhood information meeting held for the purpose of introducing the developer/applicant and the proposed project to the participants that responded to a notification letter about this potential development. There were 87 letters sent out and 12 people attended this meeting. Question: Will these be attached, duplex units? Answer: Yes, there will be attached duplex units as well as 4-paired ranch -style and townhome units. 2. Question: What will the materials of the units be? Answer: Mostly stucco with brick trim. 3. Question: There is a grading easement on the property. Will you affect it? Answer: Yes, I will have to modify it. 4. Question: How tall are your ranch style homes? Answer: About 14' in height. 5. Question: How far from the east property line will your first building be? Answer: Approximately 40' to 50'. 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 TDD (970) 224-6002