Loading...
HomeMy WebLinkAboutHAMPSHIRE POND EAST PUD PRELIMINARY AND FINAL - 44 93C - CORRESPONDENCE - STAFF'S PROJECT COMMENTSfugitive dust and erosion during the construction process. You will need to provide evidence that you are exempt from State requirements or that you have applied for the permit prior to final P.U.D. approval. 15. Some additional space is needed if the sanitary sewer is intended to be extended and connected into the Dixon Creek Trunk Line. This completes the review comments at this time. Additional comments will be forthcoming because all comments have not yet been received from the various departments and reviewing agencies. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the October 23, 1995 Planning and Zoning Board hearing: ****************************************************************** Plan revisions are due no later than the end of the working day, October 5, 1995. Please contact me for the number of folded revisions required for each document. PMT's, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due on October 16,1995. ****************************************************************** Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments: Sincerely, A& I Steve Olt Project Planner xc: Kerrie Ashbeck/Sheri Wamhoff Advance Planning Stormwater Utility Transportation Parks & Recreation. Bret Larimer, Ltd. Stewart & Associates file/Project Planner b. Is the intent to have individual street addresses for each unit? If these are intended to be "zero lot line, single family attached" units, the agenda description and the Planning Objectives must be changed from "multi -family". 5. A copy of the comments received from the Building Inspection Department is enclosed with this letter. 6. The Light & Power Department will need to know meter locations prior to design of electrical facilities. 7. The City's Right of Way Agent has stated that additional right-of-way for the Drake Road/Taft Hill Road intersection must be reserved with this development. Please check with the Engineering Department. 8. The Water/Wastewater Department has offered the following comments: a. Connecting sanitary sewer to the Dixon Creek Trunk Line may trigger a sewer repay for this development. b. If each building is to have only one water and one sanitary sewer service, then there must be a homeowner's association for billing purposes. The homeowner's association documents should be submitted to the City for review. Additional water/sanitary sewer comments have been forwarded to Stewart & Associates on a red -lined set of utility plans and to Cityscape Urban Design on a red -lined Landscape Plan. 9. A copy of the comments received from the Engineering Department is enclosed with this letter. 10. A copy of the comments received from the Stormwater Utility is enclosed with this letter. 11 The Site & Landscape Plan shows a fence extending across the existing bicycle/pedestrian trail at the northeast corner of the site. 12. The Stormwater Utility would like to see plans for the future grading on the regional detention facility. This requirement could preclude this request remaining on schedule for fmal P.U.D. approval. 13. The future status of the existing bicycle/pedestrian trail from West Drake Road to the trail connection into this development at the east end of the Water Blossom Lane cul-de-sac must be resolved with the Parks & Recreation Department prior to this request going before the Planning and Zoning Board fora final P.U.D. approval. 14. The Natural Resources Department has stated that you need to contact Myrna Hanson of the Larimer County Health Department regarding a State Air Quality Permit for control of Commu i Planning and Environmental -vices Current Planning City of Fort Collins September 15, 1995 Eldon Ward Cityscape Urban Design, Inc 3555 Stanford Road, Suite 105 Fort Collins, CO. 80525 Dear Eldon, Staff has reviewed your documents for the Hampshire Ponds East P.U.D. - Preliminary and Final that were submitted to the City on August 21, 1995, and would like to offer the following comments: A copy of the comments received from U.S West is enclosed with this letter. 2. Columbine CableVision has stated that they would like to have a side easement on Lot 17. The alternative would be to have the 15' wide pedestrian and bicycle access easement along the east side of the. property to include necessary utilities. 3. The Mapping and Surveying Department has offered the following comments: a. The south side of this plat does not adjoin Tract "C" of the Hampshire Pond P.U.D. It adjoins the north side of an unpllatted parcel owned by the City. Please show as unplatted on this plat. b. The control monuments are not as shown. they do not meet State requirements. C. Describe the outer boundary monuments. d. Show/have a note vacating the existing easements shown on the plat of Hampshire Pond P.U.D. that affect this site. The four areas within the plat, not right-of-way or lots, need to have a tract designation with square footage. 4. The Zoning Department has offered the following comments: - - - - a. Need note regarding installation of landscaping or 125% of landscape valuation for securement prior to issuance of certificates of occupancy. 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 • TDD (970) 224-6002