Loading...
HomeMy WebLinkAboutHAMPSHIRE POND EAST PUD PRELIMINARY AND FINAL - 44 93C - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORMHAMPSHIRLOPONDS EAST PRELIMMARY AND FINAL PUD Activity A: ALL DEVELOPMENT CRITERIA ALL CRITERIA APPLICABLE CRITERIA ONLY Is the criterion applicable? will the criterion be satisfied? If no, please explain Pre- aCRITERION nry Final Not Ap- Yes No Al. COMMUNITY -WIDE CRITERIA 1.1 Solar Orientation X 1.2 Comprehensive Plan X X X 1.3 Wildlife Habitat X 1.4 Mineral Deposit X 1.5 Ecologically Sensitive Areas reserved 1.6 Lands of Agricultural Importance reserved 1.7 Energy Conservation X X X 1.8 Air Quality X 1.9 Water Quality X X X 1.10 Sewage and Wastes X X X 1.11 Water Conservation X X X 1.12 Residential Density X X I X A2. NEIGHBORHOOD COMPATIBILITY CRITERIA 2.1 Vehicular, Pedestrian, Bike Transportation X X X 2.2 Building Placement and Orientation X X X 2.3 Natural Features X X X 2.4 Vehicular Circulation and Parking X X X 2.5 Emergency Access X X X 2.6 Pedestrian Circulation X X X 2.7 Architecture X X X 2.8 Building Height and Views X 2.9 Shading X X X 2.10 Solar Access X X X 2.11 Historic Resources I X 2.12 Setbacks X X X 2.13 Landscape X X X 2.14 Signs X 2.15 Site Lighting X X X 2.16 Noise and Vibration X 2.17 Glare or Heat X 2.18 Hazardous Materials X A3. ENGINEERING CRITERIA 3.1 Utility Capacity X X X 3.2 Design Standards X X X 3.3 Water Hazards X 3.4 Geologic Hazards X -61-