HomeMy WebLinkAboutFTC RAMS CROSSING WTE VERIZON - BDR180027 - SUBMITTAL DOCUMENTS - ROUND 4 - RESPONSE TO STAFF REVIEW COMMENTSComment Number: 2
Comment Originated: 09/04/2018
09/04/2018: Please provide a C-1 form and a one -line diagram. The C-1 form
can be found here:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Form was sent to Luke on 8123/19.
Comment Number: 3
Comment Originated: 09/04/2018
09/04/2018: Electric Capacity Fee, Building Site charges, and any necessary
system modification charges will apply at owners' expense. Please see the
Electric Estimating Calculator and Electric Construction Policies, Practices &
Procedures at the following link:
http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 4
Comment Originated: 04/10/2019
04/10/2019: Sub -metering is not allowed in this application. Please call Luke
Unruh at 970-416-2724 to discuss other options.
New power service was requested.
Department: Water -Wastewater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen(a fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 08/20/2018
07/02/2019: FOR APPROVAL -UPDATED:
I appreciate that updates were provided; however, there are inconsistencies
between what I show for the area and what is depicted on the plans. Also, the
water services need to be shown coming into the site/building to identify
potential conflicts. Please contact me to discuss discrepancies and what
needs to be shown. (Note: at first look, discrepancies include number of water
services shown to the site, storm systems at west/south and north/east of
building are not connected, storm lateral at the NW building corner that the
proposed fiber will cross, storm system at NE that proposed electric service will
cross, sanitary sewer main in the street needs to be shown).
Plans have been revised to show existing utilities per the original slab property drawings. Contractor will be required to
locate and pothole utilities they will be crossing
City of
Fort Collins
August 15, 2019
Ryan Sagar
LRK Consulting, LLC / Verizon Wireless
350 S Jackson Street
Unit 127
Fort Collins, CO 80209
RE: FTC Ram's Crossing WTE, BDR180027, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact your Development Review Coordinator, Todd Sullivan, at
970.221.6695 or tsullivan(a�fcgov.com .
Comment Summary:
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer(cDfcgov.com
Topic: General
Comment Number: 8
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224,6134 - fax
fcgov. com/de velopmentreview
Comment Originated: 06/15/2019
06/15/2019 FOR APPROVAL:
I do not need another round of review but please add a note to all sheets
depicting cables running from the front 3-antenna array stating, " All cables
associated with the installation of wireless equipment shall be fully screened
from public view using the most discreet camouflage techniques possible."
This note has been added to multiple sheets where cables are depicted running from the front 3-antennas.
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh(ilfcgov.com
Topic: General
Comment Number: 1
Comment Originated: 09/04/2018
09/04/2018: Will the Cell Tower require its own electric service from the
transformer?
Yes, this facility will require its own electric service.