Loading...
HomeMy WebLinkAboutFTC RAMS CROSSING WTE VERIZON - BDR180027 - SUBMITTAL DOCUMENTS - ROUND 4 - RESPONSE TO STAFF REVIEW COMMENTSComment Number: 2 Comment Originated: 09/04/2018 09/04/2018: Please provide a C-1 form and a one -line diagram. The C-1 form can be found here: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf Form was sent to Luke on 8123/19. Comment Number: 3 Comment Originated: 09/04/2018 09/04/2018: Electric Capacity Fee, Building Site charges, and any necessary system modification charges will apply at owners' expense. Please see the Electric Estimating Calculator and Electric Construction Policies, Practices & Procedures at the following link: http://www.fcgov.com/utilities/business/builders-and-developers Comment Number: 4 Comment Originated: 04/10/2019 04/10/2019: Sub -metering is not allowed in this application. Please call Luke Unruh at 970-416-2724 to discuss other options. New power service was requested. Department: Water -Wastewater Engineering Contact: Dan Mogen, 970-305-5989, dmogen(a fcgov.com Topic: General Comment Number: 1 Comment Originated: 08/20/2018 07/02/2019: FOR APPROVAL -UPDATED: I appreciate that updates were provided; however, there are inconsistencies between what I show for the area and what is depicted on the plans. Also, the water services need to be shown coming into the site/building to identify potential conflicts. Please contact me to discuss discrepancies and what needs to be shown. (Note: at first look, discrepancies include number of water services shown to the site, storm systems at west/south and north/east of building are not connected, storm lateral at the NW building corner that the proposed fiber will cross, storm system at NE that proposed electric service will cross, sanitary sewer main in the street needs to be shown). Plans have been revised to show existing utilities per the original slab property drawings. Contractor will be required to locate and pothole utilities they will be crossing City of Fort Collins August 15, 2019 Ryan Sagar LRK Consulting, LLC / Verizon Wireless 350 S Jackson Street Unit 127 Fort Collins, CO 80209 RE: FTC Ram's Crossing WTE, BDR180027, Round Number 3 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact your Development Review Coordinator, Todd Sullivan, at 970.221.6695 or tsullivan(a�fcgov.com . Comment Summary: Department: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer(cDfcgov.com Topic: General Comment Number: 8 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224,6134 - fax fcgov. com/de velopmentreview Comment Originated: 06/15/2019 06/15/2019 FOR APPROVAL: I do not need another round of review but please add a note to all sheets depicting cables running from the front 3-antenna array stating, " All cables associated with the installation of wireless equipment shall be fully screened from public view using the most discreet camouflage techniques possible." This note has been added to multiple sheets where cables are depicted running from the front 3-antennas. Department: Light And Power Contact: Luke Unruh, 9704162724, lunruh(ilfcgov.com Topic: General Comment Number: 1 Comment Originated: 09/04/2018 09/04/2018: Will the Cell Tower require its own electric service from the transformer? Yes, this facility will require its own electric service.