HomeMy WebLinkAboutROCKY MOUNTAIN HIGH SCHOOL EXPANSION SITE PLAN ADVISORY REVIEW - 48 93 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS4
Robb, Brenner an( ig, Inc
On the basis of our meeting this morning, Matt Delich will be
working with Rick Ensdorf to evaluate impacts at the Shields -
Drake intersection. We will also look at other means of
minimizing the impact of traffic on the surrounding area.
Obviously this will not be done before the meeting of September
27th, although we may have some additional information.
As at Fort Collins High School, this appears to be an item which
will require some ongoing discussions between the School District
and the City. Our minutes for that meeting this morning will
encourage such dialogue.
Bob Hendrickson (landscape and irrigation consultant) and I met
with Tim Buchanan, and Ralph Zentz of the City; and Jerry
Garretson of Poudre R-1 School District at the site on Friday,
September 3rd. On the basis of that meeting, Ralph will mark
trees which do not have enough value to save. Discussion are
currently underway with the School District as to whether those
trees will be removed this year yet and the remaining trees that
can remain a viable part of our landscape scheme can be pruned.
Our parking lot layout may be modified to reflect the results of
this meeting. That modification probably will not be completed
before September 27th.
We have placed the recommended notes (slightly modified) on the
Landscape Plan.
The height of the auditorium is shown on the plan.
We will have a colored elevation and colored Site Plan present
for the Neighborhood Meeting tomorrow night.
I look forward to our Neighborhood Meeting tomorrow night and
responding to the communities concerns.
Sincerely,
William O. Brenner, Jr., AIA
President
WOB/lw
Enclosures: 3 Site Plans
3 Landscape Plans
Robb, Brenner an lig, Inc. 125 South Howes - Suite 880 • P O. Box 2' port Collins, CO 80522 • (303) 484-0117
Architecture
Planning
Interior Design
RB+B
September 8, 1993
Mr. Ted Shepard
Senior Planner
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
RE: Rocky Mountain High School
Dear Ted,
Please refer to my letter to you dated August 30, 1993 for basic
comments.
In addition, the Site and Landscape Plans have been revised in
response to the comments on your letter of August 27th.
Phil Robinson of Stewart and Associates has met with Glen
Schleuter and is making revisions on his report. Phil tells me
that no revisions are necessary on the Drainage Plan and so we
are not resubmitting it.
Note that the natural gas line that exists on the west side of
the building is shown. It will be re-routed as necessary for the
new construction.
Parking lot lighting is shown on the plans.
The Transfort Bus Stop which currently exists, is labeled on both
the Site and Landscape Plans.
Bicycle racks are now shown on the plans. On the basis of our
meeting this morning, attended by you, we will survey students at
Rocky Mountain High School to determine the best location(s) for
bike racks to encourage the greatest use of this kind of
transportation to the site.
The number of parking spaces in each location is indicated on the
plans.