Loading...
HomeMy WebLinkAboutJACOB FAMILY SERVICES REDWOOD CENTER - 56 93 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWt owners" (APO) mailing list of names and addresses of property owners within approximately 500' of the project. 8. Planning will schedule the meeting and will need approximately 10 days to send letters out and notify the neighborhood. 9. Jan Meisel, from the Planning Department, has additional information about a long-range planning project in the area, the North College Avenue Study, which you may be interested in. Jan's number is 221-6376. 10. Please.contact Janet Perry at Light and Power (221-6700) about changes to the electrical requirements and payment of Light and Power development charges. MEETING DATE: July 6, 1993 ITEM: The Jacob Center for 50 youth at 1225 Redwood Road APPLICANT: John Carlson and Dan Fenaughty 633 Remington Street Fort Collins, CO 80524 LAND USE DATA: This is a proposal for a youth and family services agency and treatment center for approximately 50 youth to locate in an existing building (old New Beginnings). No exterior changes are being proposed to the building or landscaping. COMMENTS: 1. The project will be reviewed as an amendment to the New Beginnings PUD and will require a public hearing and review by the Planning and Zoning Board. 2. A traffic impact study will be required with the submittal. This could be in letter form from a registered traffic engineer. The study should include a traffic analysis of the proposed use versus the existing use, looking at trip generation and distribution onto Conifer and College Avenue. 3.. I will forward any comments from Engineering to you, if Mike Herzig has additional concerns. 4. A letter, addressed to Glen Schlueter at the Stormwater Utility, should be included with your submittal. This letter should state what development will occur on the site, how much impervious surface will change, and whether stormwater flows will be altered with the project. 5. There are existing wetlands on the property which should not be disturbed without review and approval by the Planning and Natural Resources Departments and Stormwater Utility. Future improvements to the detention pond will be constructed by Stormwater. There is an existing drainage easement across this property which you should be aware of. , 6. The Planning Staff will verify that all of the required landscaping has been installed as per the New Beginnings PUD. Any landscaping which is not in, will have to be completed prior to issuance of a certificate of occupancy. 7. A neighborhood meeting will be required on this proposal. Please see enclosed map which you should use to prepare the "affected property City of Fort Collins July 8, 1993 John Carlson 633' Remintgon Fort Collins, Commu. .y Planning and Environmental . .vices Planning Department and Dan Fenaughty Street CO 80524 Dear Mr. Carlson and Mr. Fenaughty: For your information, attached is a copy of the Staff's comments concerning The Jacob Center for 50 youth at 1225 Redwood Road, presented before the Conceptual Review Team on July 6, 1993. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, I: Kirsten Whetstone Project Planner KW/gjt Attachments cc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Transportation Department Stormwater Department [Proj'ect- .P1ann& File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750