STEWART&&SSOCIATES
Consulting Engineers and Surveyors
July 26, 1993
Mr. Glen Schlueter
Storm Water Utility
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Glen:
The following are the cost estimates for erosion control measures for
Lot 1, Second Replat of North Lemay Subdivision, Second Filing:
A. 1,
Straw Bale Dike - 2
@ $100
$ 200.00
2.
Sediment Trap = 1 @
$150
$ 150.00
3.
Permanent Reseeding
- 73,181 S.F. @ 0.0149
$1090.00
B. 1.
Reseeding - 252,212
S.F. @ 0.0115
$2900.00
The City of Fort Collins requirement of 150% of cost would make the total
collateral $4350.00.
If you have any questions regarding the estimated cost, please call.
Sincerely,
Richard A. Rutherford, P.E. & L.S.
President
jrr
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box'429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
EFFECTIVENESS CALCULATIONS
------
----------------=---------- -.---------------------------------
PROJECT: Lo-rl, .SeceND kAFMAT A/ci erq 6&MAy..!'us,Zvo, STAIIDARD FORM B
COMPLETED BY: o-U UATE: ZG JYL /q
I Erosion
C-Factor P-Factor
Method
Value
Value
Comment
-Control
p ---------------------------------------------
'DA2E SOIL
1.00
.• /• O'D
1.89 Ac.
�UILt>ti
0.01
/i0D
/-03 Ae.,
As PHAc-TL Co�vc.e6r6
6,01
A
'h 19 Ac,
CS7-•98(-JS1q6D C;,eq o
0,06
'%.o�
D.28Ac•
.SE1'/M6.v7- T�eAP*-
I..00
QS0
ST/2 A w
----P j.CZ&LlALEAli_,eE�-rec-n•N� o,4S ----- =---------
/, 68A-----------
MAJOR
PS,
SUB
AREA
BASIN
(o)
BASIN
(Ac)
CALCULATIONS
----
73.8%,
-----
-----
,
-------------------------------------------
=
WTD
C FAW-ooe A81) f
(6-0? )t/,0s�+(0.01k,f9)
.014 4-3
w'fD
- PACTu12• r 0- Sw X
0, 80 = 0, 0i-U
ELF
= CI - (ova 4 3 x o
Ok > -23. 8 %
-------------------------------------- --------------------------------1
DI/SF-B:1989
CONSTRUCTION SEQUENCE
PROJECT: Lo-r L Xrco.ue RepcAY A)IkErm LEHAy Fliawe STANDARD FORM C
SEQUENCE: FOR 19 93 ONLY.: COMPLETED BY: ' DATE: ,xuc. p993
Indicate by use of a bar line or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting a new schedule for
approval by.the City Engineer.
YEAR
MONTH
----------------------------
OVERLOT GRADING
WIND EROSION CONTROL
Soil Roughing
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
Other
RAINFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other - 1B u it.D/,o(
VEGETATIVE:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed.Planting
Sod Installation
Nettings/Mats/Blankets
Other
- J I F I A I A I M I J I J I A
----------------------------------+----
1--------------------------------------------------------------------
STRUCTURES: INSTALLED BY MAINTAINED BY
VEGETATION/MULCHING CONTRACTOR
DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON
HDI/SF-C:1989
0
RAINFALL PERFORMANCE STANDARD EVALUATION'
------------------------------------------------------------
PROJECT:Lor /, XECaND ReF4AT iOVOk+HCEh.4yJur,z„0 STANDARD FORM A
COMPLETED BY: R Ae DATE:
------------------------------------------------------------
DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS
SUBBASIN ZONE (ac) (ft): M (feet) M (o)
--Him H-----6,07At. Ezo - o. &o%-------------- I -,3-g
e
---------------------------------------------------------------------
DI/SF-A:1989
STEWART&ASSUCIATES 103 PH. S. IVIEL33DR1FAX FORT COLLINS, CO 80521
482-9482-9382
Consulting Engineers and Surveyors
By: JRA P` Date: 71zo19-s Client: -T-Ai c-, Sheet No. of
Project: Loz Q lu E-: flcnAj n R s PLA -r r- /U,9 k, rH LeFm Ay -fu PAD i L/ t-rle) Al t p .
Subject: c-- (^.A C- L) ATiQ A.) r
'I /.SB
i,_xt w -Z F,
6 CIA C.
1 6.
� V 0 If
;'(0
U
lA
i
I i 2
0-7 6 776 3 S
6 /IV -
V
f
, 3 1 (V .1z X1
0 pe 0,./ Val
f
I
,'
i
..I
ii
1S. MELDRUhFAX , r'ORT COLLINS, CO 80521
EWART&ASSUCIATES03
ST PH. 482-9382
482-9331
Consulting Engineers and Surveyors
By: R A Date: Vzo/ Client jEq r= / Ps —72) / x) no -TAI c- Sheet No. of
Project: L a -r (2 A) E c o A) n P Z-A T- 0,4-- A) A.C. 1- H Z f --- M A (USWQ1f1QA.- 74J>
Subject: T) r--- r ez-- AI -ri n A-) I>e) A) m AAA r-r /A r, z A iLi
C-'Fto)t A o 0
(�z c
K-
0
7
Z�r-X
0
53
!/7,364-� 16,1-1(,
I
-080 7-3,164-
'ZO. 90 S7, J
--- i3o:
3 z 7'59-o
/q-. 01 I 33,-76'8 I z9, 17 7
so___
—
13.� !
�00
2,66
/Z 10 31 41-0
13
Z-30
1
1
0
18,
1
I
-I
j
18 3
511 5
7'
1
14034 1 0
'7- 71
11�0
4,-5
:4 c? 30, 6 f.)o
5S-1 Z
5-0, wo
C)o 0
jI.i
i
I;�
�
� ilii�i�li
30,000-
-
kL
7-0,00
N
�_
1,
�� ;��� ,
J--
qJ
Aer
/0300
0
-----------
o 10 Z10 3o 40 5-0 Go -70 8D 90 Izo iBp
rIA4 E M
STEWART&ASSUCIATES 103 S. IVIEL
3DIRFAX r:ORT gOLLINS, CO 80521
Consulting Engineers and Surveyors
By: P A P— Date: ? Client: P H 6: ps -T o + U -ro u T ✓c. Sheet No. of
Project: / o i Q ,y F y. T E r o ,V rn Re P L.AT o,- % % H C B r? A✓ rJ B r /✓ r: •; . J
Subject: 17y e-'r "n p e n (AJA rE;e &",u oF,c G 4 LCV L Q T/n tl r -
i c-.L
I'
10'U1!.G�.I Eia 9G, 7S3 s+F 21�2
i (i�C2vlo� 1G.7�'70G S•F; ,3.:
! C ! �.6 xi �!3�c� + ( o.zsx 0.63 - ' O,ss
i
(, 87 (),l -.0 53 i soot I �
i
i I I I !! O`•%i�3 i i�. j d.S$ F7? 3% M/N,
OS3_X !• Z.f3 x 'G • 0 % i = C, F J.
I 1 i
I ! �Deu-•I Q/oy� = .ID S3 x -2i3! X �� 0 _ I. ¢-o c•F. t,
1 I I 1
i ..I ,fo.oy,�•! T"� :i 87[//-1 o�s.01 Soo'iZ+ _
DEv;. /oeye, i
I /.2Sxj O•S3 x Q•I X 10.0;7 IG,Sc.F r.
,II1
l I 1 !
—- 1 Ii! I�,
,I I {
I
STEWART&OLSSOCIATES 103 PH. S. MEL9331 DRL)FAX ..-, FORT COLLINS, CO 80521
482-482-9382
Consulting Engineers and Surveyors
By: P A r— — Date: 7/Ze)/I---5 Client Plye(-ps --FolAl 7-e .y T RI Sheet No. —of
Project: Cnr nil,-# T E r 0 AJ V> QPVLAT A Op- T-H 'f I 4�1 J-(/V' 7; IV If/ e) 44
Subject: -n? r A, 1,0 A -7 r-- Ae, jE!o AMr-,=- CALC IP/ A 71n u r 141,5 7c2f--1 n
A 0
C1
1 I - H.ii.t r.. I -7C 97 0: 7-5
7 Y3
, 4
y4t
! ! ! �?- i ! � I I
! 1 :3,1-6 ' r- r.
4t I) -- SO4k;.
A
Nut.
,I
Y�
-
,
'S
ix
0 7
av 31-0
0a fT,l«
-7 ',//3II;II
J
IUD
Ix
-4
Lot 1, Second Replat of North Lemay Subdivision, Second Filing
Page 2
A detention pond with a capacity of 37,516 cubic feet is planned in the
southeast corner of the site. A twelve —inch A.D.S. pipe with a restriction
plate will meter the allowable discharge rate of 1.58 cubic feet per second.
The outfall drainage swales which flow easterly and southerly to the Lincoln
Avenue swale are in dedicated drainage easements. The detention pond is also
in a drainage easement.
Erosion Control: The site is in a moderate wind erodibility zone and in a
high rainfall erodibility zone. The existing ground cover is good with grasses
and weeds. The sequence of construction will start with the building and
parking and loading areas being stripped and the detention pond being built.
The excavation for the detention pond is minimal with most of the detention
volume being generated by the berm. The outlet pipe will be installed and
a rock filter placed to immediately develop a sedimentation pond. The pad
for the building will then be constructed with imported material such as pit
run. The foundation will then be built which will alleviate some of the wind
erodibility. The curbs and base material will be constructed to provide an
all—weather surface for construction activities. The detention pond will be
reseeded at the appropriate time'in the fall season. Straw bales willbe placed
at the southeast corner of the public parking area and at the southeast corner
of the employee parking and loading area.
The Runoff calculations and mass diagram, the erosion control calculations,
and the grading and drainage plan are enclosed as a part of this report. The
erosion control collateral cost estimate is also enclosed.
If you have any questions regarding this report, please call.
Sincerely,
Richard A. Rutherford, P. & L.S.
President
jrr
enclosures
STEWART&ASSOCIATES
Consulting Engineers and Surveyors
July 26, 1992
Mr. Glen Schlueter
Storm Water Utility
City of. Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Glen:
The following is the storm drainage report for Lot 1, Second Replat of
North Lemay Subdivision, Second Filing.
The site is located 370 feet west of the intersection of North Lemay Avenue
and Buckingham Street in the Northeast 'a of Section 12, Township 7 North, Range
69 West of the 6th P.M., Fort Collins, Colorado. The area of the site is 6.07
acres, and it is located in. the Cache la Poudre River drainage basin. The.
site is bounded by Buckingham Street on the north, by an undeveloped industrial
lot on the east, by a self —storage business on the south and by an undeveloped
industrial lot on the west.
The site slopes at approximately 0.7% grade from northwest to southeast.
Buckingham Street slopes from west to east at 0.30% more or less. The site
is in the Cache la Poudre River 100—year flood plain.
The site was approved previously as an industrial subdivision which is
zoned I.L., Light Industrial; however, the only development that has taken
place is the self —storage business. The drainage scheme approved previously
is to have each lot detain the difference between the two—year historic runoff
and the 100—year developed runoff on site. Each lot will discharge in surface
drainage swales that are planned to drain east to North Lemay Avenue and then
south along the west side of Lemay Avenue in a Swale with a concrete pan to
the existing Lincoln Avenue drainage Swale. That approved plan is what is
proposed for this site also.
There is no offsite-area that drains through this site. The area west
of this site drains southerly through the Vanworks property to Lincoln Avenue.
The area north of Buckingham Street will drain into Buckingham Street, and,
the areas south and.east of this site are below this site.
The owner proposes to construct a cabinet manufacturing plant on Lot 1.
A public parking lot and an employee parking lot and loading area will also
be constructed. The building will have a finish floor elevation of 4946.5
which is 1.5 feet above the.100—year flood elevation of 4945.0.
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
STORM DRAINAGE REPORT
FOR
LOT 1, SECOND REPLAT OF NORTH LEMAY SUBDIVISION, SECOND FILING
PREPARED
FOR
PHELPS-TOINTON, INC.
JULY 26, 1993
STEWART & ASSOCIATES, INC.
103 SOUTH MELDRUM STREET
FORT COLLINS, COLORADO 80521
303/482-9331