HomeMy WebLinkAboutCOPPERLEAF - FDP170008 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS1/� -\
used in their on, a[, unaltered state. ANY modification(s) n. ,,be clearly
distinguished and all City logos/identifiers must be removed from the modified
detail. Detail drawings can be found in both .pdf and .dwg formats through the
links to "Construction Drawings" on www.fcgov.com/utility-development.
Comment Number: 3 Comment Originated: 03/07/2017
03/07/2017: Please see redlines.
Department: Zoning
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 03/06/2017
03/06/2017: Photometric site plan does not include light levels measured 20 ft
beyond property line.
3
Topic: Lighting Plan
Comment Number: 10 Comment Originated: 03/09/2017
03/09/2017: Please remove the address from the title block. With the project
being platted, the address could change.
Topic: Plat
Comment Number: 1
Comment Originated: 03/09/2017
03/09/2017: Please verify the bearing along the Emergency Access Easement
is correct. See redlines.
Topic: Site Plan
Comment Number: 2 Comment Originated: 03/09/2017
03/09/2017: There are line over text issues. See redlines.
Comment Number: 3 Comment Originated: 03/09/2017
03/09/2017: There are text over text issues. See redlines.
Comment Number: 4 Comment Originated: 03/09/2017
03/09/2017: Please remove the address from the title block. With the project
being platted, the address could change.
Comment Number: 5
Comment Originated: 03/09/2017
03/09/2017: Some of the sheets listed in the sheet index are not in the plan
sets. See redlines.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/08/2017
03/08/2017: Stop sign must be on the West side of the Crosswalk
Comment Number: 2 Comment Originated: 03/08/2017
03/08/2017: Trees cannot be placed within 50' of the stop sign, in an effort to
make sure the stop sign is in clear view.
Department: Water -Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 03/07/2017
03/07/2017: Please note that all City of Fort Collins Utility Customers are
subject to City Code requirements for wastewater. These requirements include
Section 26-306 Wastewater Discharge Permit Requirements and Section
26-332 Prohibitive Discharge Standards. A permit may be required depending
on activities on the site; however, discharge standards apply to every customer,
both large and small, regardless of what activities take place on the site.
Please contact Industrial Pretreatment, (970)221-6900, to discuss these
requirements and how they apply to this development.
Comment Number: 2 Comment Originated: 03/07/2017
03/07/2017: Please note that all City construction detail drawings are to be
7
Comment Num. 4r: 8
. omment Originated: 03/07/2017
03/07/2017: Please include a depth gauge for the detention basin as the depth
is shown to be greater than four feet.
Comment Number: 9 Comment Originated
03/07/2017: Please include signage for the parking lot ponding areas.
Comment Number: 10 Comment Originated
03/07/2017: Please provide detail on the proposed inlets adjacent to the
detention basin and connection thru the proposed wall.
Comment Number: 11
03/07/2017: Please show slopes on pans and swales.
Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
03/07/2017
03/07/2017
Comment Originated: 03/07/2017
Comment Originated: 02/15/2017
02/15/2017: Current Erosion Control Materials Submitted do not meet
requirements. Please submit; an Erosion Control Plan (based off of returned
redlines), an Erosion Control Report (was acceptable however escrow numbers
will need to be recalculated based upon the changes to the plan), and an
Escrow / Security Calculation (based upon changes to the plan). Also, based
upon the area of disturbance State permits for stormwater will be required since
the site is over an acre. If you need clarification concerning the erosion control
section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-65889 icounty@fcqov.com
Topic: Building Elevations
Comment Number: 7 Comment Originated: 03/09/2017
03/09/2017: There are line over text issues. See redlines.
Comment Number: 8 Comment Originated: 03/09/2017
03/09/2017: Please remove the address from the title block. With the project
being platted, the address could change.
Comment Number: 9 Comment Originated: 03/09/2017
03/09/2017: There are sheet numbering issues. See redlines.
Topic: Construction Drawings
Comment Number: 11 Comment Originated: 03/09/2017
03/09/2017: There are line over text issues. See redlines.
Comment Number: 12 Comment Originated: 03/09/2017
03/09/2017: There is text that needs to be rotated 1800. See redlines.
Topic: Landscape Plans
Comment Number: 6
Comment Originated: 03/09/2017
03/09/2017: Please remove the address from the title block. With the project
being platted, the address could change.
11
Comment Numb. . 11 - ,,nment Originated: 03/08/2017
03/08/2017: Please show the property line in heavier and darker line.
Comment Number: 12
Comment Originated: 03/08/2017
03/08/2017: The illuminance values are in ghosted text and won't reproduce
from mylar.
Comment Number: 13 Comment Originated: 03/08/2017
03/08/2017: Sheet E-2 needs to contain the ordering information per the
Schedule.
Comment Number: 14 Comment Originated: 03/08/2017
03/08/2017: Graphics and font size on sheet E-2 need to be revised in order to
be reproduced from mylar. Cutting and pasting the cut sheets from the catalogs
needs to be re -done. Please delete unnecessary information. Most all of the
text is too small and won't reproduce.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 03/07/2017
03/07/2017: Please note that all City construction detail drawings are to be
used in their original, unaltered state. ANY modification(s) must be clearly
distinguished and all City logos/identifiers must be removed from the modified
detail. Detail drawings can be found in both .pdf and .dwg formats through the
links to "Construction Drawings" on www.fcgov.com/utility-development.
Comment Number: 3
Comment Originated: 03/07/2017
03/07/2017: Please provide evidence that the detention basin is in compliance
with drain times per Colorado Revised Statute 37-92-602(8). More information
on this statute is available at http://tinyurl.com/RevisedStatuteMemo, and a
spreadsheet to show compliance is available for download at
http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at
(970)224-6192 or dmogen@fcgov.com with any questions about this
requirement or for assistance with the spreadsheet.
Comment Number: 4
Comment Originated: 03/07/2017
03/07/2017: Please add the following note to the proposed pavers on the
grading and utility plans:
Please refer to the erosion control plan sheets and report for temporary control
measures and construction sequencing that shall be used to prevent loading of
this drainage facility with sediment during construction.
Comment Number: 5 Comment Originated: 03/07/2017
03/07/2017: Please provide calculations for the proposed spillway/driveway.
Comment Number: 6 Comment Originated: 03/07/2017
03/07/2017: Please see redlined drainage report and plans.
Comment Number: 7
Comment Originated: 03/07/2017
03/07/2017: Please clarify detention volume calculations to show
considerations were taken to account for the varying cross section of the
pavers.
5
Department: Planning Services
Contact: Ted Shepard, 970-221-63437 tshepard@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 03/08/2017
03/08/2017: Please provide a manufacturer's cut sheet or schematic of the
bike rack that is planned for the breezeways. Are all of these to be wall -mount?
Any floor -mount? Staff is concerned that not all residents will be willing or able
to use the wall -mounts. Also, please indicate the number of bikes that can be
accommodated per breezeway.
Comment Number: 2 Comment Originated:
03/08/2017
03/08/2017: Please add the standard note regarding exterior bike racks.
Comment Number: 3 Comment Originated:
03/08/2017
03/08/2017: Please provide a detail of the retaining walls.
Comment Number: 4 Comment Originated:
03/08/2017
03/08/2017: Please provide dimensions for the pergolas or provide a separate
detail.
Comment Number: 5 Comment Originated:
03/08/2017
03/08/2017: On the Landscape Plan, please do not ghost existing trees and
label as "Ex."
Comment Number: 6 Comment Originated:
03/08/2017
03/08/2017: On the architectural elevations, for the south elevation of Building
C, staff is concerned that the elevation appears monochromatic. Please
consider using a different color for the board and batt siding that is more
contrasting in relationship to horizontal and vertical siding. Or, explore other
options in terms of the color pattern or use of materials that result in adding
more variety and interest to this elevation.
Comment Number: 7 Comment Originated:
03/08/2017
03/08/2017: On the Photometric Plan, E-1, fixture BB on the east side of
Building Envelope BE-4, needs to be equipped with a back -side shield. Does
this fixture need to be an AM
Comment Number: 8 Comment Originated:
03/08/2017
03/08/2017: The AA fixture between Building Envelopes BE-1 and BE-8
seems to throw excessive illumination to the west even with the back -side
shield. Have you considered eliminating this pole mount and replace with two
wall mounts, one on each end of each garage?
Comment Number: 9 Comment Originated:
03/08/2017
03/08/2017: Lighting controls are now becoming normal on most fixtures. But, if
the applicant is not interested in providing dimming capability, staff suggests
that wherever fixtures BB are located immediately adjoining a building, that
these too are equipped with back -side shields. Otherwise, excessive
illumination is being thrown into the units.
Comment Number: 10 Comment Originated: 03/08/2017
03/08/2017: Please add a quantity column in the Luminaire Schedule.
4
Comment Numb,... 4 . ,,mment Originated: 03/09/2017
03/09/2017: Light and Power will most likely need to extend primary lines into
the site to feed transformers. 10ft minimum separation is needed between all
water, sewer, storm water, and gas main lines. Transformer locations are
needed to determine the electric primary route.
Comment Number: 5 Comment Originated: 03/09/2017
03/09/2017: Electric capacity fees, development fees, building site charges
and any system modification charges necessary to feed the site will apply to this
development. Please contact me or visit the following website for an estimate
of charges and fees:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Comment Number: 6
Comment Originated: 03/09/2017
03/09/2017: A commercial service information form (C-1 form) and a one line
diagram for the commercial meter will need to be completed and submitted to
Light & Power Engineering. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/bu ilders-and-developers/development-
forms-guidelines-regulations
Comment Number: 7
Comment Originated: 03/09/2017
03/09/2017: Please document the panel size on existing single family home on
the site. You will receive a credit on fees for this exiting service.
Comment Number: 8 Comment Originated: 03/09/2017
03/09/2017: Please label electric meter locations on the buildings.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler@poudre4ire.org
Topic: General
Comment Number: 1
Comment Originated: 03/04/2017
03/04/2017: 2015 IFC CODE ADOPTION
Be advised, the Poudre Fire Authority and the City of Fort Collins are in the
process of adopting the 2015 International Fire Code. Building plan reviews
shall be subject to the adopted version of the fire code in place at the time of
plan review submittal and permit application.
Comment Number: 2
Comment Originated: 03/04/2017
03/04/2017: FIRE DEPARTMENT TRAINING OPPORTUNITY
Poudre Fire Authority is currently looking to temporarily acquire a single-family
residential structure to use for a major emphasis drill during the first week in
June (for an attic fire simulation). The training will be marginally invasive with an
intent to pierce small holes in the roof and insert a fog nozzle to distribute water.
There is no live -fire but the intent is to flow some amount of water into the attic,
then repeat the exercise as needed to train multiple engine companies. Please
contact me if your site may be willing and capable of pursuing a discussion
along this line and I will put you in touch with our training division chief. Thank
you.
3
Department: Environmen, . Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
03/05/2017: Update the songbird nesting note on landscape plans to: "NO
TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON
(FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL
ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY
TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE
SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF
ACTIVE NESTS ARE FOUND, THE CITY WILL COORDINATE WITH
RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE
WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND
CONSTRUCTION APPLY."
Reminder: no tree removal or tree work (beyond healthy pruning) is to occur until
a Development Construction Permit (DCP) is issued for the approved project.
Department: Forestry
Contact: Molly Roche, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 12
03/05/2017
Comment Originated: 03/09/2017
03/09/2017:
Thank you for making adjustments to make space for trees #22 and #23. The
increased distance helps, but the structure is still quite close to tree and should
be carefully managed and evaluated during the construction process.
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tiegmund@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 03/09/2017
03/09/2017: Light and Power has existing single phase electric facilities
running along the south edge of the property and feeding an existing dwelling
unit on the site. Light and Power has 3phase electric facilities running along
Shields St adjacent to the site. Power will most likely need to be looped through
the site. Please submit power requirements for the proposed buildings so Light
and Power can determine where the feed will come from.
Comment Number: 2 Comment Originated: 03/09/2017
03/09/2017: Removal of the existing Light and Power infrastructure on the site
will need to be coordinated with Light and Power and paid for by the developer.
Removals will be billed time and materials needed for crews to remove
infrastructure. Please contact me to discuss if you have any questions.
Comment Number: 3
Comment Originated: 03/09/2017
03/09/2017: (2) transformer pads are identified on the plans. Depending on
power requirements for the buildings an additional transformer may be needed
for building C. Please submit power requirements (c-1 form) so Light and
Power can determine the number of transformers needed.
K
City of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - tax
tcgov. com/developmentreview
March 10, 2017
Scott Ranweiler
Brinkman Partners
3528 Precision Drive, Suite 100
Fort Collins, CO 80528
RE: Copperleaf, FDP170008, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov,com
Topic: General
Comment Number: 1 Comment Originated: 03/08/2017
03/08/2017: Please refer to redlines for various Utility Plan and Plat cleanup.
Comment Number: 2
Comment Originated: 03/08/2017
03/08/2017: Where is the connection to the existing waterline in the private
drive being done? I can't find any records that indicate there is a Utility
Easement in this area?
Comment Number: 3
Comment Originated: 03/08/2017
03/08/2017: Please provide offsite grading from the site. I'm not sure how the
proposed site transitions to the existing contours.
Comment Number: 4 Comment Originated: 03/08/2017
03/08/2017: Please modify the grading plan to show the high points at the
driveway on Shields Street. I'm unsure if there is more than 750 SF of drainage
is occurring from the site.
Comment Number: 5 Comment Originated: 03/08/2017
03/08/2017: Please include detail 707.2 (Type IV Driveway for attached walk)
in the Utility Plans.