HomeMy WebLinkAboutHARMONY COMMONS LOT 5 CHILD CARE - FDP170036 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (4)Department: Traffic Operation
Contact: Tim Tuttle, TTUTTLE@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/08/2018
01/08/2018: The northwest corner should have directional curb ramps instead
of the corner ramp that is shown. Please work with Engineering on the
appropriate design for the curb ramps on the site.
Comment Number: 2 Comment Originated: 01/08/2018
01/08/2018: Any final signing and striping comments will be provided at the
planning review meeting.
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/09/2018
01/09/2018: The plans show that two conflicts maybe present with the
waterline and the storm sewers. Please document how these will cross while
still providing the 18 inches of separation.
Comment Number: 2 Comment Originated: 01/09/2018
01/09/2018: The proposed trees have conflicts with the waterline and water
meter. Please provide 10 feet of separation between the trees and all utilities.
Comment Number: 3 Comment Originated: 01/09/2018
01/09/2018: Please provide a utility easement for the new alignment of the
waterline.
Department: Zoning
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 01/09/2018
01/09/2018: All fences must beat least 2 ft from a public sidewalk.
Topic: Lighting Plan
Comment Number: 1 Comment Originated: 01/09/2018
01/09/2018: Existing street lighting will need to be removed from photometric
site plan. Light levels measured twenty (20) feet beyond the property line of the
development site (adjacent to residential uses or public rights -of -way) shall not
exceed one -tenth (0.1) foot-candle as a direct result of the on -site lighting.
10
need to be subn,. J at time of the first round of FDP. Please , . Amit an
Erosion Control Plans as the recently received materials have comments and
redlines that needed to be addressed to meet City Criteria. Please submit an
Erosion Control Report as none was included in the recently received materials
and is required to be submitted to meet City Criteria. Please submit an Erosion
Control Escrow / Security Calculation as none was included in the recently
received materials and is required to be submitted to meet City Criteria. If
you need clarification concerning the Erosion Control Material Requirements or
Comments presented above please contact myself. Jesse Schlam (970)
224-6015 jschlam@fcgov.com
Contact: Wes Lamarque, 970416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/09/2018
01/09/2018: Please remove the sidewalk chase detail if it is not being used.
Comment Number: 3 Comment Originated: 01/09/2018
01/09/2018: The drainage report has the release rate from the paver section as
1.8 cfs in the calculations and 2.3 cfs in the text. Please clarify
Comment Number: 4 Comment Originated: 01/09/2018
01/09/2018: Please include a note on the Grading Plan that states the porous
pavement installation shall meet all the specifications of the ICPI.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcountV@fcgov.com
Topic: Building Elevations
Comment Number: 4 Comment Originated: 01/08/2018
01/08/2018: Please revise the legal description in the title block to Lot 5,
Harmony Commons. See redlines.
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 01/08/2018
01/08/2018: Please revise the titles & title blocks to Lot 5, Harmony Commons.
See redlines.
Comment Number: 6 Comment Originated: 01/08/2018
01/08/2018: There are line over text issues. See redlines.
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 01/08/2018
01/08/2018: There are line over text issues. See redlines.
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/08/2018
01/08/2018: There are Lot numbering issues. See redlines.
Comment Number: 2 Comment Originated: 01/08/2018
01/08/2018: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
F
Comment NumL.;e: 15 ,omment Originated: 01/09/2018
01/09/2018: On the trash and recycling enclosure, staff prefers that the person
door not have a gate. This allows for hands -free access.
Comment Number: 16 Comment Originated: 01/09/2018
01/09/2018: On the Lighting Plan, please decrease the Kelvin temperatures on
the exterior lighting from 4,000 to 3,000 degrees. Higher Kelvin temperatures
for the commercial areas of Harmony Commons were allowed based on the
anticipated level of evening patrons visiting the various restaurants and brew
pub. Since the child care center will not experience this level of night time
activity, there is no comparable justification for 4,000 degrees Kelvin. Staff
recommends that building mounted lighting be equipped with automatic
dimming capability after hours.
Comment Number: 17
Comment Originated: 01/10/2018
01/10/2018: Staff is concerned that the east elevation facing Lady Moon lacks
horizontal relief. The length of the east side of the building is 130 feet. Please
note that Section 3.5.3(D) — Variation in Massing — requires that horizontal
masses must not exceed a height : width ratio of 1 : 3 without substantial
variation in massing that includes a change in height and a projecting or
recessed elements,
Comment Number: 18 Comment Originated: 01/10/2018
01/10/2018: Also, with regard to the east elevation, Section 3.5.3(E)(2)(a)
addresses minimum wall articulation and requires that building bays be a
maximum of 30 feet and visually established by architectural features such as
columns, ribs, or pilaster, piers and fenestration pattern. The standard goes on
to state that no wall that faces a street shall have a blank, uninterrupted length
exceeding 30 feet without including at least two of the following: change in
plane, change in texture or masonry pattern, windows, treillage with vines, or an
equivalent element that subdivides the wall into human scale proportions.
Comment Number: 19 Comment Originated: 01/10/2018
01/10/2018: On the Site Plan, please add building envelope dimensions and
distances to the nearest property lines.
Comment Number: 20 Comment Originated: 01/10/2018
01/10/2018: Staff has learned that several trees will need to be removed or
relocated due to conflicts with existing underground utilities. Please be sure to
make the necessary adjustments, but, at the same time, find other opportunities
to add landscaping in areas where conflicts do not exist.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, Ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 01/03/2018
01 /03/2018: The site disturbs more than 10,000 sq. ft. and therefore Erosion
and Sediment Control Materials need to be submitted. Current Erosion Control
Materials Submitted do not meet requirements. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements
can be found at www.fcgov.com/eroison. The Erosion Control Materials will
1.1
Comment Numb..,: 8
,,omment Originated: 01/09/2018
01/09/2018: Section 3.8.11 requires that fences along collectors (Lady Moon
Drive) that exceed 100 feet must vary in alignment or setback at least one-third
of the length of the fence by a minimum of five feet. The standard also includes
a qualitative aspect that fences must be made visually interesting by integrating
architectural elements such as brick or stone columns, incorporating articulation
or openings into the design varying the alignment or setback or softening the
appearance with plantings or similar techniques.
Comment Number: 9 Comment Originated: 01/09/2018
01/09/2018: Please provide more detail on the specifications of the proposed
fence. I could not find any references on the internet to the Rahab, Inc. It is not
clear what exactly is proposed with references like "semi -private" or "Danbury."
The color must be specified. Staff recommends that white not be selected as
PVC white causes glare. With the extent of fencing proposed, an earth -tone
color would be more compatible with the center.
Comment Number: 10
Comment Originated: 01/09/2018
01/09/2018: With regard to the fence alignment along Timberwood, please
reconcile the Site and Landscape plans.
Comment Number: 11
Comment Originated: 01/09/2018
01/09/2018: Fences cannot exceed 42 inches in any sight distance triangle.
There may be a sight distance triangle at the north driveway.
Comment Number: 12 Comment Originated: 01/09/2018
01/09/2018: Please indicate if there will be rooftop mechanical equipment. If so,
please provide a building cross-section that indicates the equipment mounting
height relative to the height of the parapet to ensure proper screening. If the
parapet is insufficient, then a roof -mounted mechanical screen wall will be
required to screen the equipment from the public streets. The elevations
indicate what appears to be a rooftop screen but it's not labeled. If this is a
screen wall, then it appears to be relatively sizable (27 feet long by 4.5 feet
high). Staff will need a sample of the material for this screen wall.
Comment Number: 13
Comment Originated: 01/09/2018
01/09/2018: Utility meters, electrical panels, gas valves, phone and cable
pedestals and outdoor condensing units will likely be located along the east
elevation facing Lady Moon Drive. Since the exact location and extent of these
appurtenances are not yet determined, please add a Site Plan Note and
General Landscape Note that ensures these various devices must be screened
by landscaping or by a screen wall or any combination thereof and that
adjustments in the field may be necessary to achieve compliance prior to
issuance of a Certificate of Occupancy. Staff has learned that the transformer
will likely be moved either off -site to the north, or remain on -site but closer to the
intersection of Lady Moon and the private east -west drive. Please note that
both locations will end up being highly visible and will need to be landscaped in
accordance with the clearance requirements of Light and Power.
Comment Number: 14
Comment Originated: 01/09/2018
01/09/2018: On the architectural elevations, the brick color BR-1 is not
specified. Please be sure to make a selection prior to either the next round of
review or the public hearing. As noted, it maybe helpful to provide a material
sample board prior to public hearing.
�- 1.-"\
The table that o..ribes the breakdown between primary ano ;ondary uses
must use all of Tract S as the basis as this is how the O.D.P., Seventh
Amendment, was approved. Please adjust the table to include all seven lots
and use the Replat as the basis for the lot sizes. Please note that this will
require that Lots 1 and 7 be developed as Primary Uses.
Comment Number: 3
Comment Originated: 01/09/2018
01/09/2018: If there was a curb cut on Timberwood that aligned with the
north -south drive in front of the building, then three sides of the parking lot drive
would not be needed to be dedicated as fire lanes. As such, in any location
where the drive aisles do not serve double -loaded parking, these drives could
be reduced in width from 24 to 20 feet in width and there would be less
impervious surface and less area needed to be dedicated as an Emergency
Access Easement. It appears that such a driveway would comply with the
spacing requirements from the intersection.
Comment Number: 4 Comment Originated: 01/09/2018
01/09/2018: What is the expectation for cross -access to allow the lunch crowd
to be able to park on Lot 5? If the expectation is to allow for cross -access for
parking, please indicate on the Site Plan with an explanatory note.
Comment Number: 5 Comment Originated: 01/09/2018
01/09/2018: Regarding parking lot perimeter landscaping, there are gaps
along the northwest portion of the parking lot. These gaps need to be filled in to
comply with Section 3.2.1(E)(4).
Comment Number: 6
Comment Originated: 01/09/2018
01/09/2018: The fence linework is hard to follow and distinguish from other lines.
On the site plan it appears that the area southwest of the building is not fenced
but shows as being fenced on the landscape plan. Both plans use a different
graphic depiction for the fence. Please label all linework and use a consistent,
distinctive graphic so the extent of the fence can be followed.
Comment Number: 7 Comment Originated: 01/09/2018
01/09/2018: Regarding the extent of the fence, Staff is concerned about the
fence along not only a portion of the west and south sides but also along the
entire east and most of the north sides of the building as well. This results in a
significant exposure along Lady Moon Drive. Staff has learned that the east
sidewalk provides access from the building to the outdoor play areas. With this
being a walkway and not an outdoor play area, Staff recommends that the
fencing along Lady Moon be softened in both material and height. Perhaps
wrought iron (or its visual equivalent) could be considered. And, at six feet in
height, this fence would comprise approximately one-third of the total building
height (18' 10" to the top of the parapet). Staff encourages the applicant to
consider a lower height along this area, especially since the site is slightly
elevated above the grade of the public right-of-way.
M
Comment Numb.,.. 7
,jmment Originated: 01/09/2018
01/09/2018: Electric Capacity Fee, Building Site charges, and any system
modification charges necessary will apply to this development. Please contact
Light & Power Engineering if you have any questions at 970-221-6700. Please
reference our Electric Service Standards, development charges and fee
estimator at the following link:
http://www.fcgov.com/utilities/business/builders-and-developers
Department: PFA
Contact: Andrew Rosen, arosen@fc oq v.com
Topic: General
Comment Number: 1
Comment Originated: 01/08/2018
01 /08/2018:
ACCESS
The 'Flares' of the Fire Lanes should be included as integral to the Fire Lane
where they meet the street entrances
The fire lanes on the provided Site Plan do not appear to be denoted as
Emergency Access Easements on a separate legal document.
Comment Number: 2 Comment Originated: 01/10/2018
01 /10/2018:
At the Staff Review meeting today, 1-10-18, the Project Team and PFA
discussed the Fire Lane plan and signage. The Fire Lane shall be dedicated as
an Emergency Access Easement by a separate Legal Document.
Should an entrance be considered off Timberwood, the full street and address
will be required to be readily visible on the building from this new accessway.
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 01/09/2018
01/09/2018: A Child Care Center is a permitted use in the Harmony Corridor
zone, subject to Administrative Review (Type One). But, Lot 5 of Harmony
Commons is within a designated Convenience Shopping Center which is a
permitted use within the H-C, Harmony Corridor zone, subject to Planning and
Zoning Board review (Type Two). The original P.D.P. for Lots 3,4 and 5 was
approved by the P & Z Board. Therefore, the Major Amendment is also subject
to review by the Planning and Zoning Board.
Comment Number: 2
Comment Originated: 01/09/2018
01/09/2018:Both Child Care Center and Convenience Shopping Center are
further defined by the Harmony Corridor zone as Secondary Uses. Within
Harmony Commons, Parcel S of the O.D.P., there can no more than a total of
7.57 acres of secondary uses.
5
Department: Light And F_ .ar
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 01/09/2018
01/09/2018: Proposed transformer location shown is considered to be
out -of -access. The transformer needs to be no more than 10' from the asphalt.
Also, it needs to be a minimum of 2' behind the sidewalk. A concrete pad, able
to support a line truck, could be poured in the parkway for access. This would
have to be a minimum of 9' wide.
Comment Number: 2 Comment Originated: 01/09/2018
01/09/2018: Proposed transformer location does not meet clearance
requirements from doors. "Oil insulated, pad -mounted transformers shall not be
located within a zone extending 20' outward and 10' to either side of a building
door". Please go to Electric Service Standards
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 3 Comment Originated: 01/09/2018
01/09/2018: Any proposed Light & Power electric facilities or existing electric
facilities that will remain within the limits of the project must be located within a
utility easement.
Comment Number: 4
Comment Originated: 01/09/2018
01/09/2018: Transformer locations need to be within 10' of an asphalt surface
accessible by aline truck. A minimum clearance of 8' must be maintained in
front of the transformer doors and a minimum of 3' on the sides Transformer
and meter locations will need to be coordinated with Light & Power
Engineering. Certain building materials and or building design may require
more clearance. Please click on the following link for Electric Service
Standards.
http://www.fcgov.com/uti I ities/b usiness/bu ilders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 5
Comment Originated: 01/09/2018
01/09/2018: A commercial service information form (C-1 form) and a one line
diagram will need to be submitted to Light & Power Engineering for all
proposed commercial buildings and multi -family (commercial) buildings larger
than a duplex or greater than 200amps. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/bu ilders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 6
Comment Originated: 01/09/2018
01/09/2018: Any relocation or modification to existing electric facilities will be
at the expense of the owner/developer. If Light & Power's existing electric
facilities are to remain within the limits of the project they must be located within
a utility easement.
4
Comment Numbr... 3
�,, rnment Originated: 01/08/2018
01/08/2018:
Are there street lights or stop signs proposed in the right-of-way? If so, please
provide proper tree separation:
Street light: 40 feet from canopy shade trees and 15 feet for ornamental
trees
Stop sign: 20 feet from sign
Comment Number: 4
Comment Originated: 01/08/2018
01/08/2018:
If there are any existing trees on -site, please schedule an on -site meeting with
City Forestry to obtain tree inventory and mitigation information.
Comment Number: 5 Comment Originated: 01/08/2018
01/08/2018:
Please verify that all trees meet the required tree/utility separation. There is one
Catalpa north of the proposed building that might be too close to the existing
storm line and one Honeylocust south of the building that is placed between a
water and sewer line.
10' between trees and public water, sanitary, and storm sewer main lines
6' between trees and public water, sanitary, and storm sewer service lines
4' between trees and gas lines
Comment Number: 6
Comment Originated: 01/08/2018
01/08/2018:
Please place the bolded street tree permit note on Sheet L1 to emphasize
importance.
Department: Internal Services
Contact: Jonathon Nagel, inagel@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
01/03/2018: The Community Recycling Ordinance (No. 109 2016) requires that
all new business and multifamily complexes subscribe to recycling service that
is at minimum 1/3 of their overall service capacity(total bin capacity x number of
weekly pickups, include both trash and recycling when calculating overall
service capacity). In general recycling containers must be at least 50% the size
of proposed trash containers to meet this requirement. Please make sure
proposed containers meet this requirement and that adequate space is
provided in all enclosures.
Comment Number: 2 Comment Originated:
01/03/2018: Please provide drawings of the proposed trash/recycling
enclosure showing overall dimensions, widths of service gates and required
pedestrian entrance along with proposed containers and their capacity.
01/03/2018
01/03/2018
3
rverette@fcgov.com
Department: Environmei. Planning
Contact: Rebecca Everette, 970-416-2625,
Topic: General
Comment Number: 1
Comment Originated: 01/03/2018
01/03/2018: LIGHTING PLAN: The light fixtures previously approved for
Harmony Commons Lots 3, 4, 5 and 6 all had color temperatures of 3000K.
Please update all light fixtures to match (all fixtures are currently shown as
4000K).
Lots 3, 4 & 5: http://citydocs.fcgov.com/?
cmd=convert&vid=51 &docid=2735495&dt=L-LIGHTING+PLAN
Lot 6: http://citydocs.fcgov.com/?
cmd=convert&vid=51 &docid=2950361 &dt=L-LIGHTING+PLAN
Comment Number: 2
Comment Originated: 01/03/2018
01/03/2018: LIGHTING PLAN: For the BB light fixture, please consider the
motion/ambient light sensor option to reduce unnecessary lighting at night.
Alternatively, automatic dimming or shut-off after a certain time of night could be
considered. The surrounding street and parking lot lighting in this area should
provide adequate security when the building is not in use.
Comment Number: 3 Comment Originated: 01/03/2018
01/03/2018: NATURE IN THE CITY: This location could be a great opportunity
to partner with Nature in the City or other community programs to install a
habitat garden and/or vegetable garden as a site amenity. Other child care
centers in town have made similar improvements, in some cases funded by
local non -profits or the Nature in the City program. Please contact me if you
would like to discuss this opportunity further.
Department: Forestry
Contact: Molly Roche, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 01/08/2018
01/08/2018:
It appears the number of Kentucky Coffeetree and Bur Oak exceed the
maximum percentage species diversity on the landscape plans. According to
LUC 3.2.1 (D) 3, if there are 60 or more trees on -site, the maximum percentage
of any one species allowed is 15%. Because there are 66 trees proposed on
the plans, all species must fall below 15% diversity. Please incorporate
additional species such as Hackberry and Accolade Elm to balance out the
diversity percentages.
Comment Number: 2
Comment Originated: 01/08/2018
01/08/2018:
Please label all public streets on the landscape plans.
2
F6rt Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
lcgov. corn/devefopmentreview
January 16, 2018
TB Group
444 W Mountain Ave
Berthoud, CO 80513
RE: Harmony Commons Lot 5 - Child Care, FDP170036, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced.project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 01/08/2018
01/08/2018: We'll want to discuss timing of the vacation of utility related
easements in conjunction with the impacted utility provider(s). Typically we
coordinate these documents prior to plan approval, but with the utilities being
existing, I suspect the utility providers would not prefer to vacate easement(s)
until the utilities are physically relocated. (Any newly dedicated utility easement
can at least be coordinated prior to plan approval). Ultimately I'm looking to
ensure that the timing of the dedications and vacations of easements are
processed such that the dedications are completed prior to plan approval and
the vacations are typically completed upon the work being done to relocate
them.
Comment Number: 2 Comment Originated: 01/08/2018
01/08/2018: I'll want verification from Stormwater/Water Utilities on whether a
new development agreement or amendment to the existing development
agreement will be needed.