HomeMy WebLinkAboutSANCTUARY ON THE GREEN - PDP190003 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS (3)Summary of key comments:
Footprint Recommendations:
Site plan on east side needs more space around buildings/more massing breaks— both vertically and
horizontally:
• More varied building heights around project perimeter.
• Smaller building footprints— instead of 9's and 12's, maybe those become 7's and 10's.
• More space btw. buildings in certain areas.
• Adhere to 30' setback along Taft.
• More consistent landscape transition space around building perimeters.
Walkway recommendations:
Stronger Midblock pedestrian spaces per LMN 4.5(E)(1): Stronger visual/and spatial links between open
courtyard spaces; less pinched and compromised by building placement and narrow openings between
buildings. Mid -block connection through courtyard space in the MF area is the biggest concern. Please
see redlines.
Lot recommendations:
Place courtyard spaces/walkways in tracts that are commonly maintained; pull lots back. Add common
fencing and landscaping. Flip housing in some areas.
Park space:
Meet LMN 1-acre park standard or dodo in tandem with a modification request for the location.
Notes:
Setbacks for SF and DP's:
Front is 15' from non -arterial. Alternative compliance for setbacks is for this front.
Sides 5 and rear S. Reducing this would be a modification.
Front lot line — PL dividing the lot for ma street.
Rear— line opposite the front.
Lot line side -- any lot line other than the front or rear.