Loading...
HomeMy WebLinkAboutSANCTUARY ON THE GREEN - PDP190003 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS (3)Summary of key comments: Footprint Recommendations: Site plan on east side needs more space around buildings/more massing breaks— both vertically and horizontally: • More varied building heights around project perimeter. • Smaller building footprints— instead of 9's and 12's, maybe those become 7's and 10's. • More space btw. buildings in certain areas. • Adhere to 30' setback along Taft. • More consistent landscape transition space around building perimeters. Walkway recommendations: Stronger Midblock pedestrian spaces per LMN 4.5(E)(1): Stronger visual/and spatial links between open courtyard spaces; less pinched and compromised by building placement and narrow openings between buildings. Mid -block connection through courtyard space in the MF area is the biggest concern. Please see redlines. Lot recommendations: Place courtyard spaces/walkways in tracts that are commonly maintained; pull lots back. Add common fencing and landscaping. Flip housing in some areas. Park space: Meet LMN 1-acre park standard or dodo in tandem with a modification request for the location. Notes: Setbacks for SF and DP's: Front is 15' from non -arterial. Alternative compliance for setbacks is for this front. Sides 5 and rear S. Reducing this would be a modification. Front lot line — PL dividing the lot for ma street. Rear— line opposite the front. Lot line side -- any lot line other than the front or rear.