April 12, 2019
Ryan Sagar
LRK Consulting / Verizon Wireless
350 S Jackson St
Unit 127
Denver, CO 80209
RE: FTC MO JEAUX WTE, BDR180026, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Development Review Coordinator, Todd Sullivan, at 970-221-6695 ortsullivan@fcqov.com .
Comment Summary:
Department: Planning Services
Contact: Kai Kleer, 970.4164284, kkleer@fcqov.com
Topic: General
Comment Number: 4
Comment Originated: 03/18/2019
03/18/2019 FOR APPROVAL: The height to width scale of the enclosures is not
correct when viewing the west elevation. To better integrate with existing
architecture, please make side dimension the same as front dimension (see
redlines on sheet PH-2). Also extend the wall leg on both enclosures so that it
appears to be a continuous enclosure from all view -able angles (see redlines on
sheet Z-2).
The side dimensions now match the front dimensions to the greatest extent possible. Walls have also been extended to create a
more complete enclosure from all viewable angles to the greatest extent possible. We hope these changes have created a more
architecturally compatible final design.
Department: Engineering Development Review
Contact: Morgan Uhlman, 970416-4344, muhlman@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/29/2018
04/01/2019: FOR APPROVAL: The legal descriptions for the easement have been
submitted Planning Materials it has been determined that this site; disturbs less
than 10,000 sq. ft., is not in a sensitive area, has no steep slopes (greater than
31-1:1 V) and is not part of a larger common development under construction.
Therefore, no submittal of Erosion Control Materials is needed at this time (if
this site substantially changes in size or design where the above criteria are
anticipated, erosion control materials should be submitted in such a case).
Though the site at this time requires no erosion control material submittal, it still
must be swept and maintained to prevent dirt, saw cuttings, concrete wash,
trash & debris, landscape materials and other pollutants from entering the storm
sewer at all times in accordance with City Code 26-498 or erosion and
sediment control measures will be required of the site. Nearby area inlets
should be protected as a good preventative practice. If at building permit
issuance any issues arise please email erosion@fcgov.com to help facilitate
getting these permits signed off. If you need clarification concerning the Erosion
Control Material Requirements or Comments presented above please contact
me at (970) 224-6015 or Ischlam@fcqov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, lcounty@fcqov.com
Topic: General
Comment Number: 2 Comment Originated: 09/03/2018
04/05/2019: FOR APPROVAL -UNRESOLVED:
Please revise the legal description as marked. See redlines.
09/03/2018: Please revise the legal description as marked. See redlines.
The legal description as marked has been updated accordingly.
It is unclear how personnel will access this equipment. Clarification is requested
for PFA.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 09/04/2018
09/04/2018: INFORMATION:
It is my understanding from the one -line diagram that this project will require a
new service to the existing transformer. The existing transformer on the south
west corner of the building is a 75kVA 120/208 transformer.
Comment Number: 2
Comment Originated: 09/04/2018
04/09/2019: FOR APPROVAL:
Thank you for placing the transformer in an easement. As a point of clarification
though, the entirety of the primary conductor owned by the City of Fort Collins
needs to be in a utility easement, not the service to the building. Please add this
before the next submittal.
09/04/2018: Light and Power would require the existing transformer and
existing electric line to be in an easement if a new service is being run to it.
Comment Number: 3
Comment Originated: 09/04/2018
09/04/2018: FOR APPROVAL:
Please provide a COMPLETED C-1 form to Light and Power Engineering. The
C-1 form can be found at:
http://zeus.fcQov.com/utils-procedures/files/EngWikiMikiPdfs/C/C-1 Form.pdf
Comment Number: 4 Comment Originated: 09/04/2018
09/04/2018: INFORMATION:
You may contact FCU Light & Power, project engineering if you have
Questions at (970) 221-6700. You may reference Light & Power's Electric
Service Standards at
http://www.fcgov.com/utilities/imp/site specific/uploads/ElectricServiceStandar
ds FINAL 18November2016 Amendment.pdf
You may reference our policies, development charge processes, and use our
fee estimator at
htto://www.fcaov.com/utilities/business/builders-and-developers
Comment Number: 5 Comment Originated: 04/09/2019
04/09/2019: INFORMATION:
I acknowledge that your intent is to provide us with the C-1 at time of building
permit. It would be far preferable to have all the necessary information before
that process begins as to not hold up your project.
The existing transformer and existing electric line are now shown to be within an easement that will be dedicated to the city.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 08/22/2018
08/22/2018: No Comment from Erosion Control at this time. Based upon the
i
accepted, and the language for the Deed of Dedication is now being looked at
by the City Attorney's Office. I will continue to work with the attorneys to finalize
the easement documents.
08/29/2018: 1 have been working with Ryan Sagar to dedicate the Emergency
Access Easement to the facility location that is shown on the plans. I sent back
the legals, deed of dedication and recording fees on 8/1/2018. 1 am still waiting
to receive the official documents and recording fees from Ryan.
Comment Number: 3
Comment Originated: 04/02/2019
04/02/2019: FOR APPROVAL: To help eliminate some of the confusion regarding
the easements on the plan set. Please add additional information to the
easement description that says who the easement is being dedicated too and
who it is from, for example, Access Easement - Property Owner to Verizon. If
an easement already exists, a reception number under the easement label
would be helpful also. For example, "Utility, Access and Shared Parking
Easement - Reception Number 20120061363".
All existing easements have been labeled while all proposed easements now indicate who will be receiving the easement. It is
unclear to me as to where we are at with the dedication of the EAE, but we will now need to include the easement for the
transformer and primary conductor per Light & Power's request as part of that existing or new dedication. We can provide an
updated exhibit and easement description once we know the current status of the EAE dedication, if the new utility easement as
proposed works for Light & Power, and what the department prefers for making sure both EAE & utility easement get dedicated.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1
03/19/2019: no comments
Department: PFA
Contact: Andrew Rosen, 970-416-25995
Topic: General
Comment Number: 1
arosen @ poudre-f ire.org
03/20/2019:
The Fire Lane shown is appropriate for this project
All PFA comments are resolved at this time
Comment Originated: 03/19/2019
Comment Originated: 08/31/2018
08/31 /2018:
ACCESS
Access is required to within 150ft of all points of the perimeter of the building.
This cannot be measured from Elizabeth Street because it is classified as an
arterial street. A Fire Lane is required on the property to achieve this access.
The building is greater than 30ft in height which will trigger the requirement for
aerial apparatus access. The required Fire Lane will be 26ft wide and no
closer than 15ft to the building or further than 30ft. This Fire Lane will be
required from Elizabeth Street through the parking area along the east side of
the building and connect to the Hub property at the southwest corner. This Fire
Lane should be shown on the Plat or dedicated by separate legal document.
4