Loading...
HomeMy WebLinkAboutFTC WALMART S MASON WTE VERIZON - BDR190005 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSside of the building. Previously depicted access & utility easement has been revised to be access only. During the 111 staff review meeting, this revision sounded like it would alleviate concerns for that particular easement. The other utility only easement has been revised based on comments from Forestry and existing storm sewer has been depicted to demonstrate that installed fiber lines will be set back from storm sewer. I believe these changes (better route clarity, route adjustment, and depiction of storm sewer) should resolve. Corrected. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 1 04/02/2019: No comments. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General Comment Number: 1 04/12/2019: FOR APPROVAL: Please revise the legal description as marked. See redlines. Comment Originated: 04/02/2019 Comment Originated: 04/12/2019 0 Standards at http://www.fcqov.com/utilities/imq/site specific/uploads/ElectricServiceStandar ds FINAL 18November2016 Amendment.pdf You may reference our policies, development charge processes, and use our fee estimator at http://www.fcqov.com/utilities/business/builders-and-developers Comment Number: 7 Comment Originated: 04/12/2019 04/12/2019: INFORMATION: Your plans indicate that your plan is to install a submeter to track your power consumption. Light and Power is in the process to request a change in code to disallow master metering for commercial services. Please consider a back up plan for installing a separate City of Fort Collins owned meter if these code changes take place before your project happens. Architect has discussed the project with Light & Power directly to address questions and comments. Upon completion of the discussions, Light & Power agreed that if no additional service is required than no additional utility easements will be required. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 03/29/2019 03/29/2019: INFORMATION ONLY: No Comment from Erosion Control. Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 3H:1 V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now apply. erosion control materials should be submitted. Though the project at this time requires no erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seems not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit issuance any issues arise please email erosion @fcqov.com to help facilitate getting these permits signed off. Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 2 Comment Originated: 04/02/2019 04/02/2019: There are conflicts with a storm sewer along the south side of the building as well as the proposed utility easement and storm sewer on the north 5 Comment Number: 2 Comment Originated: 04/02/2019 04/02/2019: FOR APPROVAL: Please submit a detailed landscape plan that meets the Land Use Code 3.2.1 and includes, but is not limited to, the existing tree inventory, any proposed trees (species, size, quantity and method of transplant). In addition, please include the City of Fort Collins' Tree Protection Notes and General Landscape Notes to the plan. These notes are available from the city planner or Nils Saha at city forestry (nsaha@fcpov.com ). If any mitigation is required, trees must be upsized to the following dimensions: Canopy Shade Trees: 3.0" caliper balled and burlap or equivalent. Evergreen Trees: 8' height balled and burlap or equivalent` Ornamental Trees: 2.5" caliper balled and burlap or eqa Wlent. Detailed landscape plans have been added to the drawings to include exis 'rye inventory, tree protection notes, and general landscape notes as provided by Forestry. Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreager@fcqov.com Topic: General Comment Number: 1 Comment Originated: 04/09/2019 04/09/2019: INFORMATION: The existing building is being served by a 750kVA 277/480 transformer on the south side of the building. Comment Number: 2 Comment Originated: 04/09/2019 FOR APPROVAL: Your plans propose a "30A, 2P, 15kVA transformer and panel". Is this intended to be a customer owned, step down transformer? Is there a new service, proposed to be run to our utility owned transformer? Please clarify. Comment Number: 3 Comment Originated: 04/09/2019: FOR APPROVAL: Please provide a oneukne diagram and a C-1 form to Light and Power Engineering. The C-1 form can be found at: http://zeus.fcQov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf Comment Number: 4 Comment Originated: 04/09/2019: INFORMATION: Any changes to the existing electric capacity and or location will initiate electric development and system modification charges. Please coordinate power requirements with Light and Power Engineering at 224-6152. Comment Number: 5 04/09/2019 04/09/2019 Comment Originated: 04/09/2019 04/09/2019: FOR APPROVAL: The existing transformer and all primary conductor from our transformer to the property line must be located within a utility easement. Comment Number: 6 Comment Originated: 04/09/2019 04/09/2019: INFORMATION: You may contact Austin Kreager, project engineering if you have questions. (970) 224-6152. You may reference Light & Power's Electric Service 4 on the site plans. It is unclear what they are representing. Sheet Z-1 now has all existing easements labeled. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/19/2019 03/19/2019: no comments Department: PFA Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 03/21/2019 03/21/2019: 2018 IFC CODE ADOPTION Poudre Fire Authority and the City of Fort Collins (Town of Timnath, Larimer County) are in the process of adopting the 2-018 International Fire Code. Code adoption is anticipated in early 2019. Building plan reviews shall be subject to the adopted version of the fire code in place at the time of plan review submittal and permit application. Comment Number: 2 Comment Originated: 03/21/2019 03/21/2019: Due to the existing access and hydrant infrastructure at this location and the limited extent of this project, PFA has no comment at this time. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sbiochowiak@fcqov.com Topic: General Comment Number: 1 04/01 /2019: No comments. Department: Forestry Contact: Nils Saha, nsaha@fcqov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 04/01/2019 Comment Originated: 04/02/2019 04/02/2019: FOR APPROVAL: There are existing trees on site. Utility easements and equipment installation are proposed in close proximity to multiple trees on the property. What are the anticipated impacts to the trees? Please schedule an onsite visit with City Forestry to obtain inventory and mitigation information. Existing significant trees should be retained to the extent reasonably feasible. The site visit should occur prior to the next round of review. Applicant met with Forestry to discuss proposed fiber route and potential impacts. As a result of that meeting, we have revised the proposed utility easement and therefore the fiber route to head further north from original location. The final location is in a gap between existing trees. 3 painted to match the exterior wall. Notes should be added to page Z-3, Z-4, Z-5 and Z-7. It may best to copy and paste WALMART note #4 on sheet GN-2 to the previously mentioned pages. This has been added accordingly. Comment Number: 4 Comment Originated: 03/19/2019 03/19/2019 FOR APPROVAL: Add the following note to the site plan, "No wireless telecommunication facility or equipment owner or lessee or employee thereof shall act to exclude or attempt to exclude any other wireless telecommunication provider from using the same building, structure or location. Wireless telecommunication facility or equipment owners or lessees or employees thereof, and applicants for the approval of plans for the installation of such facilities or equipment, shall cooperate in good faith to achieve co -location of wireless telecommunication facilities and equipment. Any application for the approval of a plan for the installation of wireless telecommunication facilities or equipment shall include documentation of the applicant's good faith efforts toward such cooperation." This has been added accordingly. Department: Engineering Development Review Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/27/2019 03/27/2019: For Approval: A few questions/comments regarding the easements shown on the plan set: 1. Are these public easements (being dedicated to the City of Fort Collins)? If these are public easements, then they need to follow the City's procedure for dedication by separate document located at this link: https://www.fcqov.com/engineering/devrev.php 2. Easements can't be dedicated through a plan set, they need to be dedicated by separate document or by platting. If these are private easements, please label them on the plan set as who is dedicating the easement and who is receiving the easement, for example "Access easement - property owner to Verizon. These will not be public easements. They have been labeled to show they will be from property owner to Verizon. Comment Number: 2 Comment Originated: 04/02/2019 04/02/2019: For Approval: To help eliminate some of the confusion regarding the easements on the plan set. Please add additional information to the easement description that says who the easement is being dedicated too and who it is from, for example, Access Easement - Property Owner to Verizon. If an easement already exists, a reception number under the easement label would be helpful also. For example, "Utility, Access and Shared Parking Easement - Reception Number 20120061363" Sheet Z-1 now has all existing easements labeled. Proposed easements show they are from property owner to Verizon. Comment Number: 3 Comment Originated: 04/02/2019 04/02/2019: For Approval: For clarity, please label the grayed -out areas shown 2 Fort Collins Corrected. Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/deve/opmentreview April 12, 2019 Ryan Sagar LRK Consulting, LLC 350 S Jackson Street, Unit 127 Denver, CO 80209 RE: FTC Walmart S Mason WTE, BDR190005, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Development Review Coordinator, Todd Sullivan, at 970-221-6695 ortsullivan@fcqov.com . Comment Summary: Department: Planning Services Contact: Kai K ®er, 970-416-4284, kkleer@fcgov.com Topic: General Comment Number. 1 Comment Originated: 03/19/2019 03/19/2019 FOR APPROVAL: Please correct title page zoning reference to, General Commercial District (C-G). Update title page building, electric and fire to reference current codes. Comment Number: 2 Comment Originated: 03/19/2019 03/19/2019 FOR APPROVAL: There are a few shrubs located where the proposed fiber box will be installed. Can a detailed view of this area be provided to ensure that landscaping will not be impacted? Applicant met with Forestry to discuss proposed fiber route and potential impacts. As a result of that meeting, we have revised the proposed utility easement and therefore the fiber route to head further north from original location. The final location is in a gap between existing trees. Regardless, a detailed view of this new area is provided on Z-10. Comment Number: 3 Comment Originated: 03/19/2019 03/19/2019 FOR APPROVAL: Please provide additional notes that the transformer, panel, and cabinet will be