Comment Number: 7 Comment Originated: 04/12/2019
04/ 12/2019: INFORMATION:
Your plans indicate that your plan is to install a submeter to track your power
consumption. Light and Power is in the process to request a change in code to
disallow master metering for commercial services. Please consider a back up
plan for installing a separate City of Fort Collins owned meter if these code
changes take place before your project happens.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-29329 jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
03/29/2019: Information Only:
Comment Originated: 03/29/2019
No Comment from Erosion Control. Based upon the submitted Planning
Materials it has been determined that this project; will disturb less than
10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes
(greater than 31-1:1 V) within or adjacent to the project, and is not part of a
larger common development that will or is under construction. Therefore, no
Erosion Control Material submittal is needed. If this project substantially
changes in size or design where the above criteria now apply, erosion control
materials should be submitted. Though the project at this time requires no
erosion control material submittal, the project still must be swept and
maintained to prevent dirt, saw cuttings, concrete wash, trash & debris,
landscape materials and other pollutants from the potential of leaving the
site and entering the storm sewer at all times during the project in
accordance with City Code 26-498. If complaint driven or site observation of
the project seem not to prevent the pollutant discharge the City may require
the project to install erosion and sediment control measures. Nearby inlets
that may be impacted by the pollutants, in particular dirt, should be
protected as a good preventative practice and individual lots should be
protected from material escaping onto the sidewalk. If at building permit
issuance any issues arise please email erosion@fcgov.com to help facilitate
getting these permits signed off.
Department: Technical Services
Contact: Jeff County, 970-221-6588, (county@fcgov.com
Topic: General
Comment Number: 2
06/10/2019: FOR APPROVAL:
Comment Originated: 06/10/2019
We have no comments, but will need to see any future submittals.
Page 2 of 2
Fort Collins
June 11, 2019
Ryan Sagar
LRK Consulting, LLC
350 S Jackson Street
Unit 127
Denver, CO 80209
RE: FTC Walmart S Mason WTE, BDR190005, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the Development Review Coordinator, Todd Sullivan, at
970-221-6695 or tsullivan@fcqov.com .
Comment Summary:
Department: Forestry
Contact: Nils Saha, nsaha@fcqov.com
Topic: Landscape Plans
Comment Number: 3
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/de velopmentre view
Comment Originated: 06/10/2019
6/10/2019: PRIOR TO THE NEXT ROUND OF REVIEW
Please change the condition of the 9" narrowleaf cottonwood to "Good," per the
tree inventory.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 6
Comment Originated: 04/09/2019
04/09/2019: INFORMATION:
You may contact Austin Kreager, project engineering if you have questions.
(970) 224-6152. You may reference Light & Power's Electric Service
Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
ds_FINAL_18November2016_Amendment.pdf
You may reference our policies, development charge processes, and use our