Loading...
HomeMy WebLinkAboutFTC WALMART S MASON WTE VERIZON - BDR190005 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSfee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Comment Number: 7 Comment Originated: 04/12/2019 04/ 12/2019: INFORMATION: Your plans indicate that your plan is to install a submeter to track your power consumption. Light and Power is in the process to request a change in code to disallow master metering for commercial services. Please consider a back up plan for installing a separate City of Fort Collins owned meter if these code changes take place before your project happens. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-29329 jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 03/29/2019: Information Only: Comment Originated: 03/29/2019 No Comment from Erosion Control. Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 31-1:1 V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now apply, erosion control materials should be submitted. Though the project at this time requires no erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seem not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit issuance any issues arise please email erosion@fcgov.com to help facilitate getting these permits signed off. Department: Technical Services Contact: Jeff County, 970-221-6588, (county@fcgov.com Topic: General Comment Number: 2 06/10/2019: FOR APPROVAL: Comment Originated: 06/10/2019 We have no comments, but will need to see any future submittals. Page 2 of 2 Fort Collins June 11, 2019 Ryan Sagar LRK Consulting, LLC 350 S Jackson Street Unit 127 Denver, CO 80209 RE: FTC Walmart S Mason WTE, BDR190005, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the Development Review Coordinator, Todd Sullivan, at 970-221-6695 or tsullivan@fcqov.com . Comment Summary: Department: Forestry Contact: Nils Saha, nsaha@fcqov.com Topic: Landscape Plans Comment Number: 3 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/de velopmentre view Comment Originated: 06/10/2019 6/10/2019: PRIOR TO THE NEXT ROUND OF REVIEW Please change the condition of the 9" narrowleaf cottonwood to "Good," per the tree inventory. Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com Topic: General Comment Number: 6 Comment Originated: 04/09/2019 04/09/2019: INFORMATION: You may contact Austin Kreager, project engineering if you have questions. (970) 224-6152. You may reference Light & Power's Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar ds_FINAL_18November2016_Amendment.pdf You may reference our policies, development charge processes, and use our Page 1 of 2