Loading...
HomeMy WebLinkAboutFTC SAMS CLUB WTE VERIZON - BDR190006 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSplan for installing a separate City of Fort Collins owned meter if these code changes take place before your project happens. Department: Technical Services Contact: Jeff County, 970-221-6588, (county@fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/12/2019 06/25/2019: FOR APPROVAL: Move the legal description down away from Note #8. See redlines. 04/12/2019: FOR APPROVAL: Please revise the legal description as marked. See redlines. Comment Number: 2 Comment Originated: 06/25/2019 06/25/2019: FOR APPROVAL: Change all references of "Existing Walmart Building" to "Existing Sam's Club Building". See redlines. Page 3 of 3 to plan set to indicate exact color for antennas, brackets, ground mounted equipment, wall mounted equipment and hardware to ensure that they match what is existing. 03/19/2019 FOR APPROVAL: Rooftop installation would be best in this situation. The projection of the antennas are not within the architectural character of the building. A louvered rooftop screen may be best (see sheet Z-3 and Z-4 as an option). Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 3 Comment Originated: 06/26/2019 06/26/2019: Please show the existing utilities near the new fiber line on the Site Plan. There are several water, sanitary, and storm sewer utilities in the area and it appears there could be some conflicts. Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreager@fcqov.com Topic: General Comment Number: 1 Comment Originated: 04/09/2019 04/09/2019: INFORMATION: The existing building is being served by a 1000 kVA 277/480 transformer. As part of this project, Light and Power requires a public utility easement that encompasses the transformer as well as all of our primary conductor from the transformer to the property line. Comment Number: 4 Comment Originated: 04/09/2019 04/09/2019: INFORMATION: Any changes to the existing electric capacity and or location will initiate electric development and system modification charges. Please coordinate power requirements with Light and Power Engineering at 224-6152. Comment Number: 6 Comment Originated: 04/09/2019 04/09/2019: INFORMATION: You may contact Austin Kreager, project engineering if you have questions. (970) 224-6152. You may reference Light & Power's Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar ds_FINAL_18November2016_Amendment.pdf You may reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Comment Number: 7 Comment Originated: 04/12/2019 04/12/2019: INFORMATION: Your plans indicate that your plan is to install a submeter to track your power consumption. Light and Power is in the process to request a change in code to disallow master metering for commercial services. Please consider a back up Page 2 of 3 City of Fort CoRi ns Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/developmen treview June 26, 2019 Ryan Sagar LKR Consulting, LLC 350 S Jackson Street Unit 127 Denver, CO 80209 RE: FTC Sam's Club WTE, BDR190006, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, please contact the Development Review Coordinator, Todd Sullivan, at 970-221-6695 ortsullivan@fcgov.com . Comment Summary: Department: Development Review Coordinator Contact: Todd Sullivan, 970-221-6695, tsullivan@fcqov.com Topic: General Comment Number: 1 Comment Originated: 06/26/2019 06/26/2019: This will require another round of review with responses to the comments below. We will perform a shortened, two -week review period, and provide comments without a formal Staff Review Meeting. Department: Planning Services Contact: Kai Kleer, 970-4164284, kkleer@fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/19/2019 06/25/2019 FOR APPROVAL: Sheets Z-7 and Z-8 do not reflect the west elevation of the building. When viewing the site, it appears to be the north elevation. Will there be equipment proposed for the north side of the building? Additionally, since the equipment cannot be roof mounted, please add callouts Page 1 of 3