HomeMy WebLinkAboutFTC SAMS CLUB WTE VERIZON - BDR190006 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSplan for installing a separate City of Fort Collins owned meter if these code
changes take place before your project happens.
Department: Technical Services
Contact: Jeff County, 970-221-6588, (county@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 04/12/2019
06/25/2019: FOR APPROVAL:
Move the legal description down away from Note #8. See redlines.
04/12/2019: FOR APPROVAL:
Please revise the legal description as marked. See redlines.
Comment Number: 2 Comment Originated: 06/25/2019
06/25/2019: FOR APPROVAL:
Change all references of "Existing Walmart Building" to "Existing Sam's Club
Building". See redlines.
Page 3 of 3
to plan set to indicate exact color for antennas, brackets, ground mounted
equipment, wall mounted equipment and hardware to ensure that they match
what is existing.
03/19/2019 FOR APPROVAL:
Rooftop installation would be best in this situation. The projection of the
antennas are not within the architectural character of the building. A louvered
rooftop screen may be best (see sheet Z-3 and Z-4 as an option).
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 06/26/2019
06/26/2019: Please show the existing utilities near the new fiber line on the Site
Plan. There are several water, sanitary, and storm sewer utilities in the area
and it appears there could be some conflicts.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 04/09/2019
04/09/2019: INFORMATION:
The existing building is being served by a 1000 kVA 277/480 transformer. As
part of this project, Light and Power requires a public utility easement that
encompasses the transformer as well as all of our primary conductor from the
transformer to the property line.
Comment Number: 4
Comment Originated: 04/09/2019
04/09/2019: INFORMATION:
Any changes to the existing electric capacity and or location will initiate electric
development and system modification charges. Please coordinate power
requirements with Light and Power Engineering at 224-6152.
Comment Number: 6 Comment Originated: 04/09/2019
04/09/2019: INFORMATION:
You may contact Austin Kreager, project engineering if you have questions.
(970) 224-6152. You may reference Light & Power's Electric Service
Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
ds_FINAL_18November2016_Amendment.pdf
You may reference our policies, development charge processes, and use our
fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 7
Comment Originated: 04/12/2019
04/12/2019: INFORMATION:
Your plans indicate that your plan is to install a submeter to track your power
consumption. Light and Power is in the process to request a change in code to
disallow master metering for commercial services. Please consider a back up
Page 2 of 3
City of
Fort CoRi ns
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmen treview
June 26, 2019
Ryan Sagar
LKR Consulting, LLC
350 S Jackson Street
Unit 127
Denver, CO 80209
RE: FTC Sam's Club WTE, BDR190006, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, please contact the Development Review Coordinator, Todd Sullivan, at
970-221-6695 ortsullivan@fcgov.com .
Comment Summary:
Department: Development Review Coordinator
Contact: Todd Sullivan, 970-221-6695, tsullivan@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 06/26/2019
06/26/2019: This will require another round of review with responses to the comments
below. We will perform a shortened, two -week review period, and provide comments
without a formal Staff Review Meeting.
Department: Planning Services
Contact: Kai Kleer, 970-4164284, kkleer@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 03/19/2019
06/25/2019 FOR APPROVAL:
Sheets Z-7 and Z-8 do not reflect the west elevation of the building. When
viewing the site, it appears to be the north elevation. Will there be equipment
proposed for the north side of the building?
Additionally, since the equipment cannot be roof mounted, please add callouts
Page 1 of 3