HomeMy WebLinkAboutMEYER SUBDIVISION - FDP190006 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)Department: Technical Services
Contact: Jeff County, 970-221-6588, "county@fcgov.com
Topic: Plat
Comment Number: 1
05/03/2019: FOR APPROVAL -UPDATED:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response letter.
04/17/2019: FOR APPROVAL -UPDATED:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on reclined sheets and/or in response letter.
03/25/2019: FOR APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response letter.
M
Department: PFA
Contact: Andrew Rosen, 970-416-25995 arosen@poudre-fire.org
Topic: General
Comment Number: 1
04/30/2019: INFORMATION ONLY:
It is understood from the supplied Utility Plan that the water service for the new
house will be taken from the existing house which will be relocated. Please note
that, typically, when a residence is designed with a sprinkler system it may
require an upgraded water supply
04/10/2019:
ALL PFA COMMENTS RESOLVED. THANK YOU
03/27/2019: UPDATE from staff review
The applicant will show 16ft wide access for the full extent of the fire lane
Please contact the Fort Collins Building Department for assistance with the
P2904 sprinkler system.
03/18/2019: ACCESS
The Fire Lane is required to be 16ft wide and capable of supporting 40T from
Kechter Road its entire length to the residence. The provided documents show
10ft, 16ft and 25ft wide in different locations
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 2
05/07/2019: FOR APPROVAL:
The native seed called out on the landscape plan is of three invasive species
please change these out for an acceptable seed mix. Please refer to the email I
sent out on 5/7/2019 to help facilitate the selection of seed species.
04/16/2019: FOR APPROVAL:
Erosion Control Plan materials look acceptable, notes, details and escrow
figures all look acceptable based upon the 2019 Criteria, Thank you. The only
thing that looks to be missing is calling out a seed mixture. Please add a
proposed seed mix to the landscape plans for the native seeding being
proposed or at the very least add the seed blend to the erosion control sheet.
03/26/2019: Based upon discussion it appears that size and scope of project
will be changing to over 10,000 SF with the installation of a wider fire lane. As
the site disturbs more than 10,000 sq. ft. and therefore Erosion and Sediment
Control Materials need to be submitted. The erosion control requirements can
be located in the Stormwater Design Criteria under the Amendments of Volume
3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements can be
found at www.fcgov.com/eroison. The Erosion Control Materials will need to be
submitted. If you need clarification concerning the Erosion Control Material
Requirements or Comments presented above please contact myself. Jesse
Schlam (970) 224-6015 jschlam@fcgov.com
2
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6689
970.224.6134 - fax
rcgov. com/developmentreview
May 08, 2019
Adam Meyer
2503 Rock Creek Drive
Fort Collins, CO 80528
RE: Meyer Subdivision, FDP190006, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Kai Kleer, at 970-416-4284 or kkleer@fcgov.com.
Comment Summary:
Department: Outside Agencies
Contact: Chris Pletcher,
Topic: General
Comment Number: 1
04/23/2019: INFORMATION ONLY:
Based on the 1972 date of the original house in the location of the modular that
is being removed, and the likelihood that the original water service line is still in
place from the meter to the original house location, we would like to suggest that
the applicant consider completely replacing their water service line from the
meter to the house if it meets certain known causes of problems.
Comment Number: 2
04/23/2019: INFORMATION ONLY:
Water service lines installed in this time period may have had lead in the fittings
or solder — if the applicant can confirm or identify that they may have a lead
service line, then they should consider replacement. If they determine that it is
galvanized, they may want to replace it based on condition. Plastic service
lines, or if the line was replaced after the mid-80's, should not warrant replacement.