HomeMy WebLinkAbout308 CHERRY STREET CARRIAGE HOUSE - FDP190011 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)https://www.fcgov.com/building/codes.php
Comment Number: 3
06/10/2019: BUILDING PERMIT:
An air tightness test will be required at the end of the project.
Comment Number: 4
06/10/2019: BUILDING PERMIT:
The new dwelling must be PV ready (conduit in place) - Local amendment
Comment Number: 5
06/12/2019: FOR APPROVAL:
Provide additional information on the function/use of the second
floor. Will this space be used by any staff associated with the adjacent
Business? Will any work related functions or events take place on the 2nd floor?
5
building lot coverage, rear lot floor area, and number of proposed bedrooms.
One parking space is required for each bedroom.
Comment Number: 4
06/12/2019: BY HEARING:
Utility Plan. Please label "Utility Plan" in title block and on plan sheet. Identify
existing conditions plan, grading and utility plan. Add any required details and notes.
Comment Number:
06/12/2019: BY HEARING:
Landscape plan - add legend and details for new planting areas. The symbol for
ground plane planting is not clear what material is used.
Comment Number:
06/12/2019: BY HEARING:
Site Plan. Add notation identifying required landscape area for carriage house (Min. 120 SF).
Will fence on west/north side by solid wood to match east side?
Comment Number:
06/12/2019: BY HEARING:
Building elevations. Add floor plans to this sheet to document location of bedrooms.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org
Topic: General
Comment Number: 1
06/07/2019: FOR APPROVAL:
The applicant states that Carriage House will be designed with a residential
sprinkler system to offset the lack of access availability. Please contact
Assistant Fire Marshal, Jerry Howell with any fire sprinkler related questions at
970-416-2868.
Comment Number: 2
06/07/2019: FOR APPROVAL:
The address including unit identifier will be clearly visible from the street or
wayfinding signage will be used.
Department: Building Services
Contact: Katy Hand, khand@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
06/10/2019: BUILDING PERMIT:
If the building will be sprinkled with a residential sprinkler system for fire access,
a sprinkler system design in accordance with plumbing code P2904 will need to
be submitted at time of building permit application.
Comment Number: 2
06/10/2019: BUILDING PERMIT:
The current adopted codes and amendments are listed on our website:
4
Comment Number: 3
06/11/2019: INFORMATION ONLY:
Development charges, electric Capacity Fee, Building Site charges and any
system modification charges necessary will apply to this development.
Comment Number: 4
06/11/2019: INFORMATION ONLY:
You may contact Austin Kreager, project engineering if you have questions.
(970) 224-6152. You may reference Light & Power's Electric Service Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
ds_FI NAL_18November2016_Amendment. pdf
You may reference our policies, development charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4344, muhiman@fcgov.com
Topic: General
Comment Number: 1
06/10/2019: FOR APPROVAL:
Please provide a cover sheet for the utility plan set. Larimer County Urban Area
Street Standard Appendix E-4 lists what is needed on a coversheet that is
submitted to the City. Here is a link to that list:
https://www.larimer.org/sites/detaulYfiles/apdxe.pdf
Comment Number: 2
06/12/2019: BUILDING PERMIT:
Larimer County Regional Road Fees and Transportation Capital Expansion
Fees will be due at the time of building permit. Please contact Kyle Lambrecht
at 221-6566 if you have any questions.
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
Comment Number: 1
06/10/2019: BY HEARING:
Site Plan. Existing driveway and parking lot needs to provide unobstructed
access to 2 new parking spaces. This may require signage or marking for the
existing 3 spaces leave drive clear for access. The new 2 parking spaces
should be moved perpendicular to lot and allow back-up space for turn around.
Comment Number: 2
06/10/2019: BY HEARING:
Site Plan. Please show sidewalk from carriage house entrance on main level
and from stair pad to parking. The driveway can act as pedestrian access to street if that is intent.
Comment Number: 3
06/10/2019: BY HEARING:
NCB zoning standards. Please include on cover page the metrics for meeting
9
to be clarified to show how it is directed between the proposed carriage house
and the adjacent off -site building.
Comment Number: 3
06/10/2019: FOR APPROVAL:
Please see redlines provided via PDF. I encourage you to reach out with any
questions or to review potential revisions, and I'd be happy to set up a meeting
or conference call to do so.
Department: Water -Wastewater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcqov.com
Topic: General
Comment Number: 1
06/10/2019: FOR APPROVAL:
In the comment response letter, I see that a fire sprinkler system is proposed to
be installed. Has this system been designed to determine if the proposed
water service will be adequate or if a separate fire service will be required? If
this has not been determined, I encourage early investigation into what is
needed for the fire protection system as a 3/4" service is typically inadequate or
requires additional considerations such as a tank/pump in the building. Please
contact me with any questions.
Comment Number: 2
06/10/2019: FOR APPROVAL:
It appears the proposed water and sewer services run under existing trees and
do not provide adequate separation. Please review and revise to meet
separation requirements as shown on the landscape plan.
Comment Number: 3
06/10/2019: FOR APPROVAL:
Please see redlines provided via PDF. I encourage you to reach out with any
questions or to review potential revisions, and I'd be happy to set up a meeting or conference call to do so.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcqov.com
Topic: General
Comment Number: 1
06/11/2019: FOR APPROVAL:
According to our standards as well as City Municipal Code, every dwelling unit
must be individually metered. This carriage house is to be considered a
dwelling unit, therefore, this unit must have their own meter and separate electric
service. Please show this new electric service on your next submittal. Thank you.
Comment Number: 2
06/11/2019: INFORMATION ONLY:
Light and Power would like to remind you that all of our facilities must have a ten
foot clearance away from all water, wastewater, and storm sewer facilities. We
also require a three foot clearance away from all other utilities with the exception of communication lines.
2
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6689
970.224.6134 - fax
rcgov. com/developmentreview
June 14, 2019
Kim Medina
Cherry Street LLC
308 Cherry Street
Fort Collins, CO 80521
RE: 308 Cherry Street - Carriage House, FDP190011, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, please contact your Development Review Coordinator Brandy Bethurem Harras at
970.416.2744 or bbethuremharras@fcgov.com.
Comment Summary:
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 1
06/10/2019: FOR APPROVAL:
Please document the net change in impervious area as there are areas being
removed and added to the site. Please note that there are multiple versions of
the site plan that need to be aligned as there is currently variation between them.
Comment Number: 2
06/10/2019: FOR APPROVAL:
Please clarify the proposed grading. Currently, it appears runoff from at least a
portion of the proposed impervious areas is directed east onto adjacent
property. Please show proposed grading will be routed to either the north or
south property boundary and not adversely affect adjacent properties. A
drainage memo may also be submitted to explain the proposed grading and
drainage and justify what has been proposed (note: a drainage memo is not
required at this point based on the impervious area added with this project,
which is assumed to be less than 1000sf).
Also, the grading/swale on the west side of the proposed carriage house needs