Loading...
HomeMy WebLinkAboutRAINTREE TOWNHOMES PUD PRELIMINARY - 42 93 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (3)TST, INC. Ms. Kirsten Whetstone August 4, 1993 Page 2 15. Responsibility for maintenance of the south bank of the ditch. This tract is outside the property boundary being developed and is owned by the City of .Fort Collins. Everything inside the property line shall be maintained by the individual owners and open spaces are the responsibility of the Home Owners Association. 16. We are pursuing ongoing negotiations with the Parks Department and Stormwater Utility Department pertaining to this detention issue. If you have any additional questions or comments, please contact us at 226-0557. TST, INC., CONSULTING ENGINEERS Keith G. Sheaffer KGS/lc Stephen F. Humann, P.E. August 4, 1993 Ms. Kirsten Whetstone City of Fort Collins Planning Department 281 N. College P.O. Box 580 Fort Collins, CO 80522-0580 RE: Raintree Townhomes Preliminary P.U.D. Project No. 10-742-000 Dear Kirsten: We at TST, Inc., Consulting Engineers have reviewed the comments from the respected departments concerning Raintree Townhomes P.U.D. Preliminary Submittal. With respect to these comments, as summarized in your letter, we have the following responses: 4. Utility easements in the rear of the lots will be addressed for final submittal. 6. Natural gas distribution will be addressed for final submittal. 7. Handicapped parking spaces in the center parking area and the ramp at the northwest corner of Evenstar Court and Shields Street will be addressed for final submittal. 8. New Mercer Ditch Company's concerns about inadequate space to maintain their ditch is being addressed through meetings with the Ditch Company. 9. Variance requests for Evenstar Court will be addressed on final submittal. 10. We are in the process of discussing this issue with Warren Jones. 11. The soils report will be addressed for final submittal. The traffic study will be submitted under separate cover. 13. We would be glad to discuss the cul-de-sac/parking design at staffs convenience. 14. Additional comments on the plat and the overall utility plan. These comments have been addressed and corrected for this re -submittal. TST, INC. Consulting Engineers 748 Whalers Way • Building D Fort Collins, CO 80525 (303) 226-0557 Metro Denver (303) 595.9103 FAX (303) 226-0204 102 Inverness Terrace East Englewood, CO 80112 (303)792-0557 FAX (303) 792-9489