HomeMy WebLinkAboutRAINTREE TOWNHOMES PUD FINAL - 42-93A - CORRESPONDENCE - STAFF'S PROJECT COMMENTS7M This concludes staff comments at this time. In order to stay on schedule for the October 25, 1993 Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due October 6th, 1993 by 12:00 noon. PMT's, colored renderings, and 10 prints are due Oct. lath. Final mylars'and other documents are due October 21st. Please be aware that if a development agreement and utility plans are required with this project, these documents and plans must be signed prior to the Planning and Zoning Board Hearing. If not, a condition will be placed on the project giving you 60 days to finalize the plans and agreement, after which time, you must submit a request for an extension from the Planning and Zoning Board. If you have any questions about these schedule a time to meet to discuss them, 6750. Sincerely, Kirsten Whetstone Project Planner cc: Kerrie Ashbeck, City Engineering City Stormwater Utility TST, Engineering File comments or would like to please contact me at 221- 9. check the area of open space tracts B-G. 10. The point of beginning shown does not match the description and to match the description the tie from the NE corner to the section line should.be shown. 11. It is not mandatory, but for the convenience of builders, etc. it would be nice to know how far the easement across the rear of the lots is from the rear lot line: 12. The two ROW lines of Evenstar Court are not parallel, please show a ROW width at the P.C. of the Curve near the S.E. corner of Lot 5. 13. The pedestrian connection to the senior center should be shown with a ramp, this will also serve as the access point to the sidewalk system'for users of the handicapped parking space. 14. New dwelling units are subject to parkland fees when building permits are issued. All landscaping in the public right -of- -- --. way shall be maintained by the Homeowner's Association. 15. Parks and Recreation has concerns about drainage. The proposed detention pond off -site is on City owned property and has not yet been approved by Parks and Recreation. I will schedule a meeting to discuss this issue with Parks, Planning, Stormwater, and Natural Resources. The Planning and Zoning Board also had concerns about using City property for private benefit. Parks and Recreation will discuss participation in construction of a pedestrian bridge over the canal to the west of the Senior Center site. Staff recommends that this issue be resolved prior to the Planning and Zoning Board hearing. There is a possibility that if this is unresolved, the project will be delayed. 16. Natural Resources has requested that any landscaping in the natural area between the two ditches should be native species and should be coordinated with the landscape plans for the Senior Center and The Preserve. They would like to review the landscape plan for landscaping and habitat enhancement of this area. Any proposed landscaping for this area should be shown on the site/landscape plan and maintenance of the area should be addressed. 17. Note number two should be updated to read "final plat".. 18. Transportation and Engineering have concerns about the design. of the pork -chop at the entrance. 19. Solar lots should be identified on the plat. 20. Additional landscaping should be indicated on the outside of the wall, to soften the appearance and tie it to the ground. Commuo Planning and Environmental ices Planning Department September 27, 1993 Kay Force Jim Sell Design 117 E. Mountain Ave. Fort Collins, CO 80524 Dear Kay, Staff has reviewed your submittal for Raintree Townhouses PUD- Final and offers the following comments: 1. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. The developer is responsible for provision of all trench; street crossings, and ditch crossings for telephone facilities within the project, and the developer pays up front construction costs for facilities within the development. 2. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 3. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. 4. The closest natural gas source of distribution pressure is at the Shields and Raintree intersection. The developer will have to obtain a utility easement either from the existing private residence adjoining Shields Street, or from the Fort Collins Senior Center for access for a gas line to serve this development. 5. The.maintenance area on the south side of the New Mercer Canal must be approved by the Canal Company. No bridges will be allowed without written approval. 6. You can delete note number 3, because a variance is not needed for Evenstar Court. It appears that a formal variance request is not needed for single loaded 28' wide local streets. 7. For Water and Wastewater comments, please refer to the utility plans. These have been forwarded to TST. 8. There were some questions about the plat. Are radii needed at the Shields Street intersection? What does the bearing and distance of "S89.56115"E 197.8211' along the south side of Evenstar Court mean? Does it create another parcel or gap or overlap into the Tract to the south? 281 North College Avenue - P.O. Sox 580 - Fort Collins, CO 80522-0580 - (303)) 221-6750