Loading...
HomeMy WebLinkAboutRAINTREE TOWNHOMES PUD FINAL - 42-93A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (3)16. The site plan will include landscaping and habitat enhancement of potential natural area when issues noted in # 15 above are resolved. We will coordinate this with natural resources. We will make every effort to complete this by Oct 21. 17. OK 18. We have modified our site plan to show the current design by the engineer. 20. We have added shrubs on the outside of the wall. We hope these responses meet staff concerns. Sincerely, JIM SELL DESIGN KI" F0'r6'z/ Kay Force October 6, 1993 Kirsten Whetstone Planning Department City of Fort Collins RE: Raintree Townhomes P.U.D., Final Staff Review Dear Kirsten: This letter is in response to Staff Comments received Sept. 29, 1993 regarding Raintree Townhomes P.U.D. Final. The response numbers correspond to those of Staff comments. Comments not addressed will be handled by the engineer. 1-4. The developer is aware of these conditions. 5. The site plan includes a signature block for the New Mercer Ditch Co. The developer is not proposing any bridges, only indicating access to the park via bridges by others. 6. OK 12. We have added this dimension. 13. Ramp has been designated. 14. Included in "Planting Notes". 15. The site plan will reflect storm drainage and detention issues when a decision is reached by the City and the developer. Sell D�sg �,cs ii sos� (�)"s4