HomeMy WebLinkAboutRAINTREE TOWNHOMES PUD FINAL - 42-93A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS16. We have added landscaping around the detention pond. It is
similar in character to that existing at the southern end of the
pond, as proposed in "The Preserve". We have also specified a
grass mix for the detention pond as suggested by Natural
Resources.
17. OK
18. We have modified our site plan to show the current design by
the engineer.
20. We have added shrubs on the outside of the wall.
We hope these responses meet staff concerns.
Sincerely,
JIM SELL DESIGN
ko, � c e/
Kay Fdree
October 27, 1993
Kirsten Whetstone
Planning Department
City of Fort Collins
RE: Raintree Townhomes P.U.D., Final
Staff Review
Dear Kirsten:
This letter is in response to Staff Comments received Sept. 29, 1993
regarding Raintree Townhomes P.U.D. Final. The response numbers
correspond to those of Staff comments. Comments not addressed will
be handled by the engineer.
1-4. The developer is aware of these conditions.
5. The site plan includes a signature block for the New Mercer
Ditch Co. The developer is not proposing any bridges, only
indicating access to the park via bridges by others.
6. OK
12. We have added this dimension.
13. Ramp has been designated.
14. Included in "Planting Notes".
15. The site plan shows the detention pond easement.