HomeMy WebLinkAboutSPRADLEY BARR AUTO DEALERSHIP PDP FDP - 64 93E - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. -;� 6(-i - 93 o sPaar��� r /5A2/2 L-J 2<A 11Er,«<- C K
Planner: 5 T C Y vc r. 1raM( Operations:
Engineer: M 1 1( � f)Ea ru .
Date:
Items Requested
Site land Plat Utility Drainage Rpt Other Items Required
Engineering ✓ ✓
Redlined Items Being Returned
Site land Plat Utili Drainage R t Other Items Being Returned
✓
Stormwater
e0"^tfA/ - SHEE-7-
FPIanniq
.
Tran*rt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
SheetRevisions Routin
1.
FILE: PROJECT PLANNER
rA44
mm
ENGINEERING: PAVEMENT
BUILDING INSPECTION
MAPPING / DRAFTING
. •
mADVANCE
��������
PLANNING
m
PLO-W- PLANNING
WATER CONSERVATION
POST OFFICE
PUBLIC SERVICE
m�����
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
�mm�rmm�
m
mmm
mmmiii0
'T7 Eli 67
_