Loading...
HomeMy WebLinkAboutSPRADLEY BARR AUTO DEALERSHIP PDP FDP - 64 93E - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. -;� 6(-i - 93 o sPaar��� r /5A2/2 L-J 2<A 11Er,«<- C K Planner: 5 T C Y vc r. 1raM( Operations: Engineer: M 1 1( � f)Ea ru . Date: Items Requested Site land Plat Utility Drainage Rpt Other Items Required Engineering ✓ ✓ Redlined Items Being Returned Site land Plat Utili Drainage R t Other Items Being Returned ✓ Stormwater e0"^tfA/ - SHEE-7- FPIanniq . Tran*rt Natural Resources Park Planning Totals Other: Note: All redlined items should be returned with the resubmittal/ revisions. SheetRevisions Routin 1. FILE: PROJECT PLANNER rA44 mm ENGINEERING: PAVEMENT BUILDING INSPECTION MAPPING / DRAFTING . • mADVANCE �������� PLANNING m PLO-W- PLANNING WATER CONSERVATION POST OFFICE PUBLIC SERVICE m����� STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS �mm�rmm� m mmm mmmiii0 'T7 Eli 67 _