Loading...
HomeMy WebLinkAboutHANSEN FARM - PDP170036 - CORRESPONDENCE - CITY STAFF (6)Pete Wray From: Wes Lamarque Sent: Monday, September 11, 2017 3:15 PM To: Pete Wray Cc: Shane Boyle Subject: RE: Hansen ODP - Drainage Comments Hi Pete, The citizen didn't mention a particular issue with drainage. With that in mind, the ODP area will be required to meet all the City's Stormwater Design Criteria including: 1. Providing quantity detention for the site for the 100-year storm while releasing at the 2-year existing flow rate. 2. Routing all onsite and offsite pass -through flows safely to the existing outfall storm sewer under Timberline Road. 3. Providing water quality and LID mitigation to enhance water quality. Please let me know if you need any additional talking points or if the citizen has a specific concern. Thanks, Wes Lamarque Development Review Engineer Water Utilities Engineering City of Fort Collins (970)416-2418 wlamargue@fcgov.com From: Pete Wray Sent: Monday, September 11, 2017 9:49 AM To:. Wes Lamarque Subject: Hansen ODP - Drainage Comments Wes, in preparation for the P & Z Board meeting this Thursday, can you give me any speaking points in response to the CDP, Drainage Report and or neighbor's concerns, see attached. Thanks, Pete Wray, A/CP, Senior City Planner Planning Services I City of Fort Collins pwrayCa.fcgov.com 970.221.6754