HomeMy WebLinkAboutHANSEN FARM - PDP170036 - CORRESPONDENCE - CITY STAFF (6)Pete Wray
From:
Wes Lamarque
Sent:
Monday, September 11, 2017 3:15 PM
To:
Pete Wray
Cc:
Shane Boyle
Subject:
RE: Hansen ODP - Drainage Comments
Hi Pete,
The citizen didn't mention a particular issue with drainage. With that in mind, the ODP area will be required to meet all
the City's Stormwater Design Criteria including:
1. Providing quantity detention for the site for the 100-year storm while releasing at the 2-year existing flow rate.
2. Routing all onsite and offsite pass -through flows safely to the existing outfall storm sewer under Timberline
Road.
3. Providing water quality and LID mitigation to enhance water quality.
Please let me know if you need any additional talking points or if the citizen has a specific concern.
Thanks,
Wes Lamarque
Development Review Engineer
Water Utilities Engineering
City of Fort Collins
(970)416-2418
wlamargue@fcgov.com
From: Pete Wray
Sent: Monday, September 11, 2017 9:49 AM
To:. Wes Lamarque
Subject: Hansen ODP - Drainage Comments
Wes, in preparation for the P & Z Board meeting this Thursday, can you give me any speaking points in response to the
CDP, Drainage Report and or neighbor's concerns, see attached.
Thanks,
Pete Wray, A/CP, Senior City Planner
Planning Services I City of Fort Collins
pwrayCa.fcgov.com
970.221.6754