HomeMy WebLinkAboutHARMONY VILLAGE PUD REPLAT NO 4 - 65-93H - SUBMITTAL DOCUMENTS - ROUND 1 - Routing Sheet (2)ProjectVI-(a�
Planner: Totl 5��ir-6I
Engineer: eA:1 ,p—
Traffic Operations:
Oats 5 ly C3
Items Requested
Site land I Plat Udlit Drainage R t Other Items Required
Engineering j
Redlined Items Being Returned
Site land I Plat Utiliq I Drainage R t Other Items Being Returned
Stormwater
Q
Water/Wastewate
Traffic Operations
Trans. Planning
Tramlbrt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmitta revisions. -
r
Revisions RoutingSheet ;f
Off
PROJECT'
------------_
MMieNM����a�
off
MwwoM��s���
'
�������
LIGHT
•
No��
Miiw
MMMIMME
•
MN
WIMMIM
ADVANCE PLANNING
NNW
ON
mom
mmmmo�w
MMOMMI
WATER CONSERVATION
omm
MMMMIMMI
• • Malmo
MMOMMOM101
11j,
�■�mm��MMMMMMIM
-RAILROAD: , :
MOWN
/MMMMMMIM
OWN
OMMMMM
MwMMOMMM�
Nowommomm
�No��OMMOMMM�