HomeMy WebLinkAboutHARMONY CROSSING PUD - FINAL - 65 93B - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTDRILLING AND EXPLORATION
DRILLING & SAMPLING SYMBOLS:
SS : Split Spoon - 13/s" I.D., 2" O.D., unless otherwise noted
PS : Piston Sample
ST : Thin -Walled Tube - 2" O.D.,.unless otherwise noted
WS : Wash Sample
R : Ring Barrel Sampler - 2.42" I.D., 3" O.D. unless otherwise noted.
PA : Power Auger
FT : Fish Tail Bit
HA : Hand Auger
RB : Rock Bit
DB : Diamond Bit = 4", N, B
BS : Bulk Sample
AS : Auger Sample
PM: Pressure Meter
HS : Hollow Stem Auger
DC : Dutch Cone
WB : Wash Bore
Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D. split spoon, except where
noted.
WATER LEVEL MEASUREMENT SYMBOLS:
WL : Water Level WS : While Sampling
WCI : Wet Cave in WD : While Drilling
DCI : Dry Cave in BCR : Before Casing Removal
AB : After Boring ACR : After Casting Removal
Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils, the
indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater
levels is not possible with only short term observations.
DESCRIPTIVE SOIL CLASSIFICATION
PHYSICAL PROPERTIES OF BEDROCK
Soil Classification is based on the Unified Soil Classification
DEGREE OF WEATHERING:
system and the ASTM Designations D-2487 and D-2488.
Coarse Grained Soils have more than 50% of their dry
Slight
Slight decomposition of parent material on
weight retained on a a200 sieve; they are described as:
joints. May be color change.
boulders, cobbles, gravel or sand. Fine Grained Soils have
less than 50% of their dry weight retained on a #200 sieve;
Moderate
Some decomposition and color change
they are described as: clays, if they are plastic, and silts if
throughout.
they are slightly plastic or non -plastic. Major constituents
may be added as modifiers and minor constituents may be
High
Rock highly decomposed, may be extremely
added according to the relative proportions based on grain
broken.
size. In addition to gradation, coarse grained soils are
defined on the basis of their relative in -place density and
HARDNESS AND DEGREE OF CEMENTATION:
fine grained soils on the basis of their consistency.
Limestone and Dolomite:
Example: Lean clay with sand, trace gravel, stiff (CL); silty
Hard
Difficult to scratch with knife.
sand, trace gravel, medium dense (SM).
Moderately
Can be scratched easily with knife,
CONSISTENCY OF FINE-GRAINED SOILS
Hard
Cannot be scratched with fingernail.
Unconfined Compressive
Soft
Can be scratched with fingernail.
Strength, Qu, psf Consistency
Shale, Siltstone and Claystone:
< 500 Very Soft
500 - 1,000 Soft
Hard_
Can. be scratched easily with knife, cannot
1,001 - 2,000 Medium
be scratched with fingernail.
2,001 - 4,000 Stiff
Moderately
Can be scratched with fingernail.
4,001 - 8,000 Very Stiff
Hard
8,001 - 16,000 Very Hard
Soft
Can be easily dented but not molded with
RELATIVE DENSITY OF COARSE -GRAINED SOILS:
fingers.
N-Blows/ft Relative Density
0-3 Very Loose
Sandstone and Conglomerate:
4-9 Loose
Well
Capable of scratching a knife blade.
10-29 Medium Dense
Cemented
30-49 Dense
50-80 Very Dense
Cemented
Can be scratched with knife.
80 + Extremely Dense
Poorly
Can be broken apart easily with fingers.
Cemented
• to it s B F 8
UNIFIED SOIL CLASSIFICATION SYSTEM
Soil Classification
Criteria for Assigning Group Symbols and Group Names
Using Laboratory Testa
Group
Group Name s
Symbol
Coarse -Grained
Soils more than
Gravels more than
50% of coarse
Clean Gravels Less
than 5% finest
Cu > 4 and 1 < Cc <3'
GW
Well -graded gravel'
50% retained on
fraction retained on
No. 200 sieve
No. 4 sieve
Cu < 4 and/or 1 > Cc > 3'
GP
Poorly graded gravel'
Gravels with Fines
more than 12% fines°
Fines classifyML MH
as or
GM
Silty gravel,G,H
Fines classify as CL or CH
GC
Clayey gravef.0"
Sands 50% or more
Clean Sands Less
Cu > 6 and-1 < Cc < 3'
SW
Well -graded sand'
of coarse fraction
than 5% fines'
passes No. 4 sieve
Cu < 6 and/or 1 > Cc > 3'
SP
Poorly graded sand'
Sands with Fines
Fines classify as ML or MH
SM
Silty sandO•"J
more than 12% fineso
Fines Classify as CL or CH
SC
Clayey sando•"•'
Fine -Grained Soils
Silts and Clays
inorganic
PI > 7 and plots on or above "A line'
CL
Lean clayK•l_)''
50% or more
Liquid limit less
passes the
than 50
PI < 4 or plots below "A" line'
ML
Si1tK.LN
No. 200 sieve
organic
Liquid limit - oven dried
Organic clayl(� .
< 0.75
OL
Liquid limit - not dried
Organic siltK.L".o
Silts and Clays
inorganic
PI plots on or above "A" line
CH
Fat clayK•LM
Liquid limit 50
or more
PI lots below "A" line
MH
Elastic SiltK`a
organic
Liquid limit - oven dried
Organic clays' ".1,
< 0.75
OH
Liquid limit - not dried
Organic siltK.Lal.o
Highly organic soils
Primarily organic matter, dark in
color, and organic odor
PT
Peat
ABased on the material passing the 3-in.
(75-mm) sieve
.ZCU,D /D CC - (D3e)2
`0
elf field sample contained cobbles or
10 Dye R Did
boulders, or both, add "with cobbles or
boulders, or both" to group name.
°Gravels with 5 to 12% fines require dual
'If soil contains > 15% sand, add "with
symbols:
sand" to group name.
GW-GM well -graded gravel with silt
Olf fines classify as CL-ML, use dual symbol
GW-GC well -graded gravel with clay
GC -GM, or SC-SM.
GP -GM poorly graded gravel with silt
"If fines are organic, add "with organic fines"
GP -GC poorly graded gravel with clay
to group name.
"Sands with 5 to 12% fines require dual
'If soil contains > 15% gravel, add "with
symbols:
gravel" to group name.
SW-SM well -graded sand with silt
'If Atterberg limits plot in shaded area, soil is
SW -SC well -graded sand with clay
a CL-ML, silty clay.
SP-SM poorly graded sand with silt
SP-SC poorly graded sand with clay
60
0.
50
10
7
"
0
0 10 la 20 30 e0 50 60 70 80 90 100 110
LIQUID LIMIT ILL)
'If soil contains 15 to 29% plus No. 200, add
"with sand" or "with gravel", whichever is
predominant.
'if soil contains > 30% plus No. 200
predominantly sand, add "sandy" to group
name.
"If soil contains > 30% plus No. 200,
predominantly gravel, add "gravelly" to group
name.
"PI > 4 and plots on or above "A" line.
OPI < 4 or plots below "A" line.
'PI plots on or above "A" line.
OPI plots below "A line.
For clasellleallon of Ilns-pralned soils
and line grained fraction of coarse.
/
grained wile
/
"onrontal PI a LL-J
Equation of W - fine/7.,
\ari/
�'/
at - to
then PI.0.73ILL -20)
•,
V���
Equation of'P' • line
y...__ Q, _
.. .. ..._.
_._.
.___..._.
Vertical at LL . 16 10 PI .O
then PI . 0.9 ILL . 9)�
__
/ O�
MH oa
OH
/
- CL-ML MLOROL
I
M1 .I r .; L .1 1' Dui' ..& tt� tot f& .
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: . NOVEMBER 1993
LOG OF BORING B-33
SHEET 1 OF 1
0 CHD5
RIG TYPE: DIE TRI��
-
E
WAT R
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
NONE
AUGER TYPE: 4' CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
NONE
SOIL DESCRIPTION
TYPE
D
(FEET)
N
fto /RI
OU
inn
MC
041
DD
IPCn
A -OMITS
-200
M)
SWELL
(Pen
LL
n
81NCHES TOPSOILIVEGEEATION
SILTY LEAN CLAY SS
Brown
Stiff
AS
_ _
—
5
8
•3000
22.7
21.3
BOTTOM OF BORING
*Calibrated Hand Penetrometer
_
10
15
20
1 25
Earth Engineering Consultants
I
I
I
I
I
I
I
I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-32
SHEET 1 OF 1
RIG TYPE: DIET D-50
WATER
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11127/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
TYPEI
D
(FEE11
N
OLOWSTI)
QU
(nn
mc
Iw
DO
Ian
A -LIMITS
-200
m
SWELL
(mn
IL I-.
8 INCHES TOPSOILIVEGETATION
SILTY LEAN CLAY
Brown Ess
Stiff
[AS
5
11
43000
21.9
19.2
BOTTOM OF BORING
-Calibrated Hand Penetrometer
10
1
15
20
1-25
Earth Engineering Consultants
11
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER1993
LOG OF BORING B-31
SHEET 1 OF 1
RIG TYPE: DIE TRICH D -50
`
WATER
DEPTH
FOREMAN: RLD
START DATE
1`1/27/93
WHILE DRILLING
12,
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
12,
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
IFEFTI
N
IBLd 11`n
QU
4nn
MC
4%)
DO
(KFI
A -LIMITS
-200
1%)
SWELL
(nn
LL
R
8 INCHES TOPSOUVEGEfATION
CLAYEY SAND
Reddish brown
Medium dense to loose
K
SS
5
11
20.5
10
4
27.4
SS
SILTY SAND WITH CLAY
Reddish brown
Loose
8
28.5
_ _
_
15
SILTY SAND AND GRAVEL WITH
TRACE OF CLAY
Goldish brown SS
Medium dense
14
19.4
20
BOTTOM OF BORING
25
[J
Earth Engineering Consultants
_1
U
11
1
1
F
L—
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER1993
LOG OF BORING B-30
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
WATER
DEPTH
FOREMAN: RLD
START DATE
11/26/93
WHILE DRILLING
11'
AUGER TYPE: 4" CFA
FINISH DATE
11/26/93
AFTER DRILLING
13'
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
9.4'
SOIL DESCRIPTION
TYPE
D
IrEETI
N
mLmsn)
QU
(nFI
MC
1%)
DO
IKF)
A•LIMITS
-200
(%)
SWELL
(nn
LL
R
81NCHES TOPSOIWEGETATION
SILTY LEAN CLAY
Reddish brown
Stiff
F
SS
F
5
7
•3000
20.9
10
9
•3000
26.3
39
20
76.9
8
22.3
_
15
SILTY LEAN CLAY WITH TRACE
OF SAND AND GRAVEL
Reddish brown
Stiff to very Stiff
Fss
32
30.7
20
BOTTOM OF BORING
-Calibrated Hand Penetrometer
1 25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-29
SHEET 1 OF 1
RIG TYPE: DIETR ICH D -50
?�
WATER
DEPTH
FOREMAN: RLD-
START DATE
11/26/93
WHILE DRILLING
11'
AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
11'
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
IrEETI
N
1eLMS"
OU
(MF)
MC
16I
DD
(Kn
A-OMITS-200
1%)
SWELL
(nn
U.
R
81NCHES TOPSOIL/VEGETATION
SILTY FINE SAND ss
Reddish brown
Loose to medium dense
FSS
_ _
5
6
28.6
10
21.9
10
SILTY SAND WITH TRACE
OF CLAY
Reddish brown FSS
Medium dense
12
22.4
15
SILTSTONE/SANDSTONE
Brown
Poorly concentrated
SS
49
1
23.4
20
BOTTOM -OF BORING
I
25
1
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1632046 DATE: NOVEMBER 1993
LOG OF BORING B-28
SHEET 1 OF 1
RIG TYPE: DIETRICH D5U
WATER
DEPTH
FOREMAN: RLD
- START DATE
11/27/93
WHILE DRILLING
12'
AUGER TYPE: 4' CFA
FINISH DATE
11 /27/93
AFTER DRILLING
11'
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
IEEET)
N
®LOWS j
QU
Imn
MC
f%)
DO
IR:n
A•LIMITS
•200
1%1
SWELL
inn
LL
R
t FOOT TOPSOIL
SILTY LEAN CLAY ss
Dark brown
Stiff
_ _
_
5
11
•3000
24.1
38
21
62.3
••too
SILTY SAND WITH CLAY
Reddish brown
Medium dense SS
B
21.9
10
CLAYEY SILT WITH SAND
Reddish brown SS
Stitt
1 9
•3000
22.2
_
15
FAT CLAY (POSSIBLE HIGHLY
WEATHERED SHALEI
Gray & Stiff
Ss
s
•3000
29.3
_ _
20
BOTTOM OF BORING
-Calibrated Hand Penetrometer
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER1993
LOG OF BORING B-27
SHEET 1 OF 1
RIG TYPE: DIET RICH D-50
WATER
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
TYPE
D
Ifun
N
iatimsb)
QU
inn
MC
1%1
DD
inn
A -LIMITS
•200
1%1
SWELL
inn
LL
%
S INCHES TOPSOILNEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS
_ _
5
10
•3000
22.4
18.6
BOTTOM OF BORING
I
I
-Calibrated Hand Penetrometer
10
15
- -
20
25
1
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1632048 DATE: NOVEMBER1993
LOG OF BORING B-26
SHEET 1 OF 1
E• IETRICH D -50
RIG TYPE: D
�'z
++ ....•.1.1
WATER
D H
EPT
FOREMAN: RLD
START DATE
/27/93
WHILE DRILLING
12'
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
11.5'
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
NIA
SOIL DESCRIPTION
TYPE
D
4FEETI
N
®LOWSIFn
QU
inn
MC
I%1
DD
(KF)
A -LIMITS
-200
1%1
SWELL
(Kn
LL
n
8 INCHES TOPSOI WEGETATION
SANDY LEAN CLAY
Reddish brown
Stiff
ESS
SS
6
9
'3000
23.4
36
19
53.8
10
9
'3000
31.1
CLAYEY SILT
Light brown SS
Stiff
10
-3000
20.9
_
16
SILTY SAND AND GRAVEL
Goldish brown
Medium dense
FSS
18
20.4
20
BOTTOM OF BONING
'Calibrated Hand Penetrometer
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-25
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
-
WATER
DEPTH
FOREMAN: RLD
START DATE
1.1/27193
WHILE DRILLING
10,
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
11'
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
(FEET)
N
01"SIM
OU
(PSn
MC
(%)
DD
IPCn
A -OMITS
-200
1%)
SWELL
)PSn
LL
R
e INCHES TOPSOIUVEGETATION
SILTY FINE SAND
Reddish brown
Loose
SS
_
6
8
15.1
10
CLAYEY SILT
Reddish brown and goldish brown
Still SS
Ess
8
•2000
27.0
10
•2000
26.0
15
SILTY FINE SAND
Brown
Loose to medium dense Fss
1 8
23.8
20
BOTTOM OF BORING
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG.OF BORING B-24
SHEET 1 OF 1
RIG TYPE: DIETRICH D 50
i
WA TER
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
NONE
- AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
N
OLOWS/M
QU
jMF)
MC
1%1
DD
JKn
A•UMITS
.200
1%1
SWELL
IPSn
LL
n
81NCHES TOPSOIWEGETATION tD
SILTY LEAN CLAY
Brown
Stiff
AS
6
18
•3500
19.6
16.8
BOTTOM OF BOFBNG
*Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
1
.1
_,
1
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-23
SHEET 1 OF 1
RIG TYPE: DIETR ICH D•50
MR
wATE R
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
10,
AUGER TYPE: 4' CFA
FINISH DATE
11 /27/93
AFTER DRILLING
11'
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
IFEETI
N
ISIOWsIDTI
QU
(MR
MC
l%1
DD
inn I
A•UMIrS
•200
1%)
SWELL
(MR
U.
n
'8INCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Dark brown
Stiff to very stiff
_ _
5
'
13
•4000
22.3
CLAYEY SILT
Reddish brown SS
Stiff
CALCAREOUS DEPOSITS BELOW 10 FEET Fss
9
•3000
15.0
10
8
•2000
25.7
15
CLAYEY SAND WITH TRACE
OF GRAVEL
GOIdIsh brown
Medium dense Fss
14
25.0
-
20
IBOTTOM OF BORING
I
I
I
I
I*Calibrated Hand Penetrometer
25
Earth Engineering Consultants
fl
'I
1
L
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER1993
LOG OF BORING B-22
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
:::.
WATER
DEPTH
FOREMAN: RLD
START DATE
11 /27193
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
. NIA
SOIL DESCRIPTION
TYPE
D
IFEETI
N
eLew lm
OU
IMF)
MC
I%F
DD
IMF)
A -LIMITS
-200
I%I
SWELL
R6n
«
n
e INCHES TOPSOILNEGETATION
SILTY SAND TRACE GRAVEL
AND CLAY
Brown
Medium dense
FSS
6
18
12.7
32
17
36.6
_ _
_
10
SILTY FINE SAND WITH TRACE
OF CLAY
Goldish brown
Medium dense
ss
8
24.8
LEAN SILTY CLAY ISS
Brown
Stiff
Fss
11
•3000
22.3
_
15
1s
1•4000
22.0
_
20
BOTTOM OF BORING
*Calibrated Hand Penetrometer
25
Earth Engineering Consultants
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER1993
LOG OF BORING B-21
SHEET 1 OF 1
G TYPE: DIE D-50 TRICH
--START -DATE -
�?�
`-
WATER
DE
EPTH
PTH
FOREMAN: RLD
11/27/93
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
NONE
SOIL DESCRIPTION
TYPE
D
(FEET)
N
eEOWj
QU
Inn
MC
m
DD
(ME)
A -OMITS
-200
MI
SWELL
(Pin
LL
R
8 INCHES TOPSOn1VEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS
_ _
5
12
•3000
20.5
19.4
BOTTOM OF BORING
'Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
11
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1 b32048 DATE: NOVEMBER1993
LOG OF BORING B-20
SHEET 1 OF 1
RIG TYPE: DIET RICH D -50
WATER
T
EP D H
FOREMAN: RLD
START DATE
11 /2719`3
WHILE DRILLING
12.5'
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
14.5'
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
atm
N
OLOW I
QU
Iran
MC
(%I
DD
(KF)
A -LIMITS
-200
1%I
SWELL
IMF)
LL
A
81NCHES TOPSOILIVEGETATION
SANDY LEAN CLAY WITH SILT ss
Dark brown
Stiff
_ _
_ _
5
11
•3000
20.2
45
22
55.0
"NONE
SILTY SAND, TRACE CLAY
Ten
Medium dense
SS
12
26.1
_
10
SILTY FINE SAND
Greenish brown
Ess
0
SS
101
24.1
15
8
1
24.6
20
BOTTOM OF BORING
I
I
I
*Calibrated Hand Penetrometer
••Remolded Sample
_ _
1 25
1
Earth Engineering Consultants
_1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-19
SHEET 1 OF 1
RIG TYPE: DIETRICH D 50
...........................:..:::>.�:::,::::::.�:::::.�::::::.:�::::._::::::::::>::;:,
WATER
DEPTH
FOREMAN: RLD
START DATE
11 /27/93
WHILE DRILLING
14'
.AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
13'
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
IrFET1
N
MLOW ifm
OU
(MFI
MC
061
DD
(KF)
A -LIMITS
-200
1%1
SWELL
inn
u
n
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY SS
Dark brown
Stiff
_ _
_ _
5
10
•3000
22.0
CLAYEY SILT
Reddish brown SS
Stiff to very stiff
13
•4000
11.7
1
29 1
14
51.8
**NONE
10
SILTY FINE SAND WITH GRAVEL
AND TRACE OF CLAY
Goldish brown
Medium dense Ess
23
20.2
15
LEAN CLAY WITH SILT
Goldish brown
Stiff
SS
11
•'3000
30.0
20
BOTTOM OF BORING
•Calibrated Hand Penetrometer
••Remolded Sample
1 26
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-18
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50:,:.:.::::::,::.:.:....::::::..::.:.:::.:>
£:>:::'<'':::iE:>:>::E£:::r,.;:}.::E::=.::`:c::i::;:r::'?:oii:srEi::;3:;.i':;i:;<.::::3:::?
.::.::.::::.::>..:..;:.>:;<:�:::�:,:>..>:..:<.:
::::>::::.....:...........:..........................................................
WATER
DEPTH
FOREMAN: RLD
START DATE
11 /27193
WHILE DRILLING
11'
AUGER TYPE: 4" CFA
FINISH DATE
11/27/93
AFTER DRILLING
11'
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
IFEETI
N
IBLOWSOT1
OU
inn
MC
1%I
DO
IR:n
A -LIMITS
-200
MI
$WELL
Inn
LL
R
8 INCHES TOPSOIWEGETATION
SILTY SAND WITH CLAY
Reddish brown
Medium dense to loose
E
SS
5
12
15.4
10
8
18.6
SILTY SAND WITH CLAY
Reddish brown SS
Loose
3
24.9
15
CLAYEY SILT WITH SAND
Reddish brown
Stiff to soft FSS
8
24.1
'
20
BOTTOM OF BORING
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1632048 DATE: NOVEMBER1993
LOG OF BORING B-17
SHEET 1 OF 1
RIG TYPE: DIETRICH D
••START •DATE •
•
WA
T
DEPTH
H
FOREMAN: RLD
11/26/93
WHILE DRILLING
8.5'
AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
7.5'
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
8.2'
SOIL DESCRIPTION
TYPE
D
IFEETI
N
RLOWSIFTI
QU
IMF)
MC
1%1
DO
IMF)
A -LIMITS
•200
IXl
SWELL
Inn
F.L
PI
B INCHES TOPSOILNEGETATION
SILTY SAND
Reddish brown
Medium dense
Ess
SS
5
8
22.4
10
11
21.1
SS
SILTY LEAN CLAY
Light brown
Stiff
8
•2000
23.7
_ _
15
FINE TO COARSE SAND AND
GRAVEL
Brown
Medium dense
SS
14
16.1
20
BOTTOM OF BORING
I
I
-Calibrated Hand Penetrometer
1 25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-16
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
11 /26/93
WATER
WHILE DRILLING
DEPTH
FOREMAN: RLD
START DATE
NONE
;.AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
NONE
i,SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
L ' TYPE
D
(FEET)
N
ffm w T1
QU
13Fl
MC
1%I
DD
(Kn
A -LIMITS
-200
1%1
SWELL
(MET
I LL
rl
r
8 INCHES TOPSOIWEOETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS
5
12
•3000
18.6
28.6
BOTTOM OF BOFUNO
*Calibrated Hand Penetrometer 1
10
15
20
25
Earth Engineering Consultants
I
1
1
1
1
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932049 DATE: NOVEMBER 1993
LOG OF BORING B-15
SHEET 1 OF 1
TYP • DIETRICH D50
WA
TER
DEPTH
FOREMAN: RLD
START DATE
11/26/93
WHILE DRILLING
11'
AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
9.
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
NIA
SOIL DESCRIPTION
TYPE
D
(FEET)
N
@EoW;Xn
QU
Inn
MC
(%)
DD
IKE)
A -LIMITS
-200
(x)
SWELL
(EST)
LL
n
8 INCHES TOPSOIWEGETATION
SILTY SAND
Light ten
Loose to medium dense
ESS
_
5
7
25.8
_ _
10
SILTY LEAN CLAY WITH TRACE
OF GRAVEL
Brown SS
Stiff
9
•3000
22.3
SILTY SAND WITH GRAVEL ss
Brown
Medium dense
F
22
16.1
_
15
22
1
1.5.4
20
BOTTOM OF SOPJNG
-Calibrated Hand Penetrometer
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER1993
LOG OF BORING B-14
SHEET 1 OF 1
C D-50 G TYP • H RI E. DIETRI
START DATE ...............1.1
/27/93
WATER
DEPTH
FOREMAN: RLD
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
TYPE
D
OUT)
N
Ma SIFT)
QU
IFSn
MC
1%1
DD
(Kn
Ad1MITS
-200
I%1
SWELL
(nn
LL
n
81NCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Dark brown
Stiff
AS
_ _
5
a
•3000
26.3
19.4
BOTTOM OF BOPoNG
*Calibrated Hand Penetrometer
10
15
20
1 25
Earth Engineering Consultants
i J
I
I
I
-.1
I
. I
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER1993
LOG OF BORING B-13
SHEET OF
RIG TYPE:: DIETRICH D-50
START DATE
WATER
DEPTH
FOREMAN: RLD
11/27193
WHILE DRILLING
10,
AUGER TYPE: 4" CFA
FINISH DATE
11127/93
AFTER DRILLING
9.61
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
(FEFT)
N
mtOWs )
Qu
IMF)
Mc
4%)
DD
IMF)
A -LIMITS
-200
4%)
SWELL
IMF)
LL
K
a INCHES TOPSOILNEGETATION
LEAN CLAY WITH SILT
Brown ESS
Stiff
Ss
5
8
03000
19.4
4
*2000
27.3
-
10
SILTY SAND WITH GRAVEL
Brown
Medium dense Ess
27
27.3
15
CLAYEY FINE SAND WITH SILT
Goldish brown
Medium dense
SS
28
--22.1
20
I
BOTTOM OF BORING
"Calibrated Hand Penetrometer 1-25
I
Earth Engineering Consultants
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER 1993
LOG OF BORING B-12
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
:>;:;>.z?::$>::>'s::"t::::tia;:i;:;:'s>:tir�>:>::>:isii;:»:::::i::::C>s:::;:i:;::::::>.::s»:
-
WATER
DEPTH
FOREMAN: RLD
START DATE-`
11/27/93
WHILE DRILLING
8.
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
8.5-
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NIA
SOIL DESCRIPTION
TYPE
D
(FEET)
N
IBLMS/FTI
QU
IMF)
MC
1%1
DO
1✓CFl
A -LIMITS
-200
1%1
SWELL
IMF)
LL
%
8 INCHES OF TOPSOIWEOEfATION
SILTY LEAN CLAY
Brown
Stiff
ss
F
6
03500
22.4
5
•2000
29.7
_
10
SILTY LEAN CLAY
Light brown
Stiff SS
6
03000
22.9
SS
SILTY SAND AND GRAVEL,
TRACE CLAY
Brown
Medium dense
Fss
8
26.2
15
24
17.5
20
BOTTOM OF BO W NO
*Calibrated Hand Penetrometer
25
Earth Engineering Consultants
I
11
1
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER1993
LOG OF BORING B-11
SHEET 1 OF 1
RIG TYPE: DIETRICH D-50
5:'?t>??:#:`:,:.>:.;;;;:;;:xo-::o:::;:;.:::.z::;:::.:.'o;;::;:':;::o:.;:;;::.;;
WATER
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
6.5'
AUGER TYPE: 4" CFA
FINISH DATE
1 1 /27/93
AFTER DRILLING
7.5'
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
48 HOUR
7.8'
SOIL DESCRIPTION
TYPE
D
(FEET)
N
MON9IFT1
QU
(nn
MC
I%)
DD
(KFI
A-UMITS
-200
1%)
SWELL
Iran
LL
n
8 INCHES TOPSOIUVEGETATION
SILTY SAND
Light ten
Medium dense
ESS
5
10
27.2
31
8
22.8
_ _
_
10
SILTY SAND WITH GRAVEL
Brown
Medium dense
SS
16
20.5
SS
14
21.1
15
SILTY SAND WITH GRAVEL
AND TRACE OF CLAY
Brown
Medium dense
FSS
16
13.4
20
BOTTOM OF BOWNO
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-10
SHEET 1 OF 1
Y DIETRICH TYPE: DIE RICH D-50
'z
WATER R
DEPTH
FOREMAN: RLD
START DATE
11 /26193
WHILE DRILLING
10.5'
AUGER TYPE: 4" CFA
FINISH DATE
11/26/93
AFTER DRILLING
9.5'
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
(FEET)
N
IBtOWSIFf)
OU
IrsFl
MC
Ixl
DD
O'CFl
A -LIMITS
a00
lx)
SWELL
Irsn
u
n
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY Ss
Brown
Stitt
—_
_
5
15
03000
19.0
SILTY SAND WITH TRACE
OF CLAY ss
Brown
Loose to medium dense
9
25.6
_
10
ESS
SILTY SAND WITH CLAY
Brown
Loose
SS
8
19,9
—
15
9
26.1
20
BOTTOM OF BORING
*Calibrated Hand Penetrometer
25
Earth Engineering Consultants
1
1
1
L
1
11
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 19132048 DATE: NOVEMBER1993
LOG OF BORING B-9
SHEET 1 OF 1
RIG TYPE: DIETRICH D-60::<;::>:;'::3::::>i><:::;>::>:`'i't::>?::z:*::`
::................................................
A ER
DEPTH
FOREMAN: RLD
START DATE
11 /26193
WHILE DRILLING
10,
AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
9.
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
N/A
SOIL DESCRIPTION
TYFE
D
(FEET)
N
IB msffn
OU
Inn
MC
(%I
DD
IMF)
A -OMITS
•200
IXI
SWELL
Inn
LL
n
8 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY
Light brown
Stiff
SS
6
9
•2000
28.2
_ _
10
SILTY SAND TRACE CLAY
Brown
Loose
SS
7
22.2
SS
SILTY SAND AND GRAVEL
Brown
Medium dense
18
17.0
_ _
15
SILTY SAND WITH TRACE
OF CLAY
Greenish brown
Medium dense SS
11
1
26.5
20
BOTTOM OF BORING
-Calibrated Hand Penetrometer
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER1993
LOG OF BORING B-8
SHEET 1 OF 1
- 0
RIG TYPE: DIETRICH D5
w r
A ER
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11/27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
TYPE
D
FEET)
N
mtO rm
QU
(nn
MC
1%I
DD
(Mn
A -LIMITS
-200
1%I
SWELL
ffSq
LL
N
81NCHES TOPSOIL/VEGETATION
SILTY LEAN CLAY Ss
Brown
Stiff
AS
5
12
•3000
21.4
19.4
BOTTOM OF BORING
•Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-7
SHEET 1 OF 1
RIG TYPE: D IETRICH D•50
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
TYPE
D
(FEET)
N
(aEow n)
QU
(mn
MC
Ix)
DD
(MFl
A-UMITS
-200
4%)
SWELI.
(rsFl
«
n
81NCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS
_ _
5
14
•4000
19.0
-
18.3
BOTTOM OF BORING
-Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER1993
LOG OF BORING B-6
SHEET 1 OF 1
CH D 50 • DIETRI
RIG TYPE.
>''
W ATER
DEPTH
FOREMAN: RLD
START DATE
11/27/93
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
TYPE
D
(FEET)
N
ML MSNTI
OU
inn
MC
DD
A -OMITS
-200
1%)
SWELL
inn
LL
n
81NCHES TOPSOIWEGETATION
SILTY LEAN CLAY ss
Brown
Stiff
AS
_ _
5
9
•3000
22.6
1
21.3
BOTTOM OF BORING
*Calibrated Hand Penetrometer
10
15
20
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT N0: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-5
SHEET 1 OF 1
RIG TYPE. DIETRICH D-50
WATER
DEPTH
FOREMAN: RLD
START DATE-
11/27/93
WHILE DRILLING
NONE
AUGER TYPE: 4" CFA
FINISH DATE
11 /27/93
AFTER DRILLING
NONE
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
NONE
SOIL DESCRIPTION
TYPE
D
4FEET1
N
MLOWSMI
QU
(PSn
MC -
4%)
DD
4nn
A-UMITS
-200
4%1
SWELL
4nn
LL
n
TOPSOIL/VEGETATION
TOPSOILEGETATION
SILTY LEAN CLAY Ss
Brown
Stiff
AS
_ _
5
10
•3000
24-e
19.0
BOTTOM OF BORING
-Calibrated Hand Penetrometer
_
10
15
20
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-4
SHEET 1 OF 1
RIG TYPE: DIETRICH D•50
'
..: :.,<..;;;;
WATER
DEPTH
FOREMAN: 01 r'
START DATE
11 /26/93
WHILE DRILLING
9.
AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
e'
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
6rfT1
N
ftl Sl )
QU
(PSn
MC
1%1
DO
IMF)
A -OMITS
-200
MI
SWELL
IPSn
LL
%
81NCHES TOPSOIUVEGETATION
SILTY LEAN CLAY SS
Brown
Stiff
_ _
_ _
5
s
22.8
SILTY SAND TRACE CLAY
Light tan SS
Loose to medium dense
LESS SILT AND CLAY WITH DEPTH
Fss
5
30.3
10
22
16.9
_
151
SILTY LEAN CLAY
Brown
Very stiff
Fss
18
•6000
24.6
_
20
BOTTOM OF BORING
-Calibrated Hand Penetrometer
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER 1993
LOG OF BORING B-3
SHEET 1 OF 1
-50
RIG TYPE: DIETRICH DDEPTH
?���
WATER
FOREMAN: RLD
START DATE
11 /26/93
WHILE DRILLING
12,
AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
11.5'
SPT HAMMER: MANUAL
SURFACE.ELEV
NIA
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
(FEET)
N
(BLEWSWT)
QU
fKF)
MC
MI
DD
tmn I
A-UMITS
•200
IMI
SWELL
LFSF)
LL
R
8 INCHES TOPSOIL/VEGETATION
SILTY LEAN CLAY
Brown
Stiff
ESS
5
5
•200024.7
_ _
10
CLAYEY SAND SS
Brown
Loose
Fss
3
32.0
4
1
18.0
15
SILTY MEDIUM TO COARSE SAND
Brown
Medium dense
SS
21
1
16.2
20
BOTTOM OF BORING
*Calibrated Hand Penetrometer
25
Earth Engineering Consultants
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO:1932048 DATE: NOVEMBER1993
LOG OF BORING B-2
SHEET 1 OF 1
RIG TYPE: DIETRICH D•50
......................................................................................
WATER
DEPTH
FOREMAN: RLD
START DATE
11 /26/93
WHILE DRILLING
S.
AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
9.
SPT HAMMER: MANUAL
SURFACE ELEV
N/A
24 HOUR
N/A
SOIL DESCRIPTION
TYPE
D
IFEETI
N
mtaw nj
QU
RBn
MC
OO
DD
(Mn
A41MITs
-too
I%)
SWELL
(Nn
u
R
9 INCHES TOPSOIWEGETATION
SILTY LEAN CLAY Ss
Dark brown
Stiff
_ _
5
9
03000
25.1
SILTY LEAN CLAY
Brown SS
son
e
-3000
22.8
31
16
48.8 1
•'100
10
LEAN CLAY WITH TRACE
GRAVEL
Brown ss
Stiff
5
•2000
17.5
15
CLAYEY SILTY SAND
Brown
Medium dense
FSS
14
21.7
20
BOTTOM OF BORING
'Calibrated Hand Penetrometer
'•Remolded Sample
_ _
25
Earth Engineering Consultants
i
[1
1
1
1
1
1
I
J
11
HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
PROJECT NO: 1932048 DATE: NOVEMBER1993
LOG OF BORING B-1
SHEET 1 OF 1
RIGTYPE: DIE TRICH D-50
WATER
DEPTH
FOREMAN: RLD
START DATE
11/26/93
WHILE DRILLING
8-
AUGER TYPE: 4" CFA
FINISH DATE
11 /26/93
AFTER DRILLING
a.
SPT HAMMER: MANUAL
SURFACE ELEV
NIA
24 HOUR
NIA
SOIL DESCRIPTION
TYPE
D
IFcen
N
,Bla ivrl
QU
(rsn
. MC
1%)
DD
(Kn
A -OMITS
-200
Iw
SWELL
(rsn
u
R
8 INCHES TOPSOI WEGETATION
LEAN CLAY WITH TRACE
OF GRAVEL
Light brown
Stiff
R
_
6
8
•2500
19.3
33
17
43.6
••100
_ _
10
SILTY SAND WITH GRAVEL
Light brown
Medium dense
SS
7
22.3
SS
SILTY LEAN CLAY
Light brown
Stiff
F
6
•2000
26.2
15
15
•4000
26.1
20
BOTTOM OF BORING
*Calibrated Hand Penetrometer
"Remolded Sample
_ _
25
Earth Engineering Consultants
1
i I Y
1
-
i i..
i 6............
-. _ _ 2 _
' I'
_
In
I
ri
i
_—
v
I _ _
........ ' i
i• .l•.a.e,••4.
i
II.. ---- --- —i
M I
I ,
J.
1 �! I i � 1 I.` r• I .. i 11, I i l i .. 1�_ 1 —
tL
I 1 ....!......VV
1 ---
-
•� I
r a
n� •.,: I i I i i
o —�
7 _>
14I
r
1'.
:=
MO
1
i ._ -
1. ... _. _
-------------------
InFeEnunE no•D 2-
n u w
p_.._.._.._.. _.._..__.._......_.._,._.._.._.._.._.._,_.._.._.._.._...,.._. _.._.._.._..r..___ r.._—__.._.._..r.._.._.�.._..__r.._.._..___..__r____..___.._.,,_._.._.._.._.._,._.._.._.._.._._.._.. .... _...
Boring Location Diagram
' HARMONY CROSSING PUD
Fort Collins, Colorado
Drawn: LLL Scale: None
' PROJECT No: 1932048 Earth Engineering Consu
Grin Inginccring Consultants, Inc.
Harmony Crossing.P.U.D.
December 1, 1993
Page 11
GENERAL COMMENTS
The analysis and recommendations presented in this. report are based
upon the data obtained.. from the soil borings performed at the
indicated locations and from any other information discussed in
this report. This report does not reflect any variations which may
occur between borings or across the site. The nature and extent of
such variations may not become evident until construction. If
variations appear evident, it will be necessary to re-evaluate the
recommendations of this report.
It is recommended that the geotechnical engineer be retained to
review the plans and specifications so that comments can be made
regarding the interpretation and implementation of our geotechnical
recommendations in the design and specifications. It is further
recommended that the geotechnical engineer be retained for testing
' and observations during earthwork and foundation construction
phases to help determine that the design requirements are
fulfilled.
This report has been prepared for the exclusive use of Richland
Homes, Inc.for specific application to the project discussed and
has been prepared in accordance with generally accepted
' geotechnical engineering practices. No warranty, express or
implied, is made. In the event .that any changes in the nature,
design or location of the project as outlined in this report are
' planned, the conclusions and recommendations contained in this
report shall not be considered valid unless the changes are
' reviewed and the conclusions of this report modified or verified in
writing by the geotechnical engineer.
.1
1
Esrlh Engineering. Cmsulwnts, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 10
Backf ill placed adjacent to the below grade walls should be placed
and compacted as recommended for fill beneath .the floor slabs and
pavements except that the degree of compaction of those materials
could generally be reduced to 90% of standard Proctor maximum dry
density. Settlements of l to 2 inches could occur in the backf ill
with the reduced compaction. Areas beneath patios, steps, and
driveways or any other overlying structures should be compacted to
at least 95% of standard Proctor maximum dry density. Backfilling
should be accomplished using light -weight hand -operated equipment
to avoid placing excessive lateral load on the below grade walls.
Puddling should not be used to consolidate backfill.
For design of the below grade walls with perimeter drain systems,
we recommend using a lateral equivalent fluid pressure of 60 pounds
per cubic foot. That lateral pressure is based on an "at -rest"
stress distribution and does not include an allowance for surcharge
loads. The recommended lateral pressure also does not include a
factor of safety. Surcharge loads adjacent to the walls would add
to the lateral pressures.
GENERAL
We estimate side slopes of 2 horizontal to l vertical would be
stable on shallow trenches excavated for short term construction
activities. Deeper trenches or trenches of a longer term nature
should be analyzed on a individual basis. When trenching, all
applicable OSHA requirements should be followed. '
While the site cohesive materials are not highly expansive,
fluctuations in moisture content could cause some shrink -swell
movements of those materials. That movement may be minimized by
maintaining a consistent moisture content in the cohesive
materials. Care should be taken to avoid plantings which can use
large quantities of water adjacent to the structures. Also,
positive drainage should be developed away from the structures to
avoid ponding of water adjacent to the foundations.
' Harmony Crossing P.U.D.
December 1, 1993
Page 9
Earth P.ngincering Consultants, Inc.
should be placed beneath the pavements. Portland cement concrete
for use in the pavements, if used, should have a minimum
compressive strength of 3500 psi at 28 days and. should be air
entrained.
Concerning stabilization of the pavement subgrades, we recommend
consideration .be given'.to stabilizing the soil.-subgrades with
addition of Class."c" fly ash. We estimate 13 to 15 percent fly
ash by dry weight would he needed; laboratory verification should
be completed prior to construction. The stabilized subgrade would
help reduce the needed aggregate/HBP section as well as help
develop a stable subgrade for placement of those materials. We
would be pleased to provide additional recommendations concerning
stabilization of the subgrades, if desired.
Positive drainage should be developed across the roadways and away
from the roadway edges to reduce the potential for wetting of the
pavement subgrades. Subgrades which are allowed to become wetted
subsequent to construction could cause premature failure of the
pavement section.
BELOW GRADE AREAS
Below grade areas for the new residences should be designed with a
perimeter drain system to eliminate hydrostatic pressures on the
below grade walls or those walls should be designed to resist
hydrostatic loads and prevent intrusion of water into below grade
areas. A perimeter drain system would generally consist of
perforated metal or plastic pipe placed at approximate foundation
bearing level around the perimeter of the structure and sloped to
drain water to a sump area where it can be removed without reverse
flow into the system. The drain line should be surrounded by a
minimum of 6 inches of appropriately sized granular filter
material. Either the filter material or the drainline should be
wrapped in filter fabric to reduce the potential for an influx of
fines into the system.
Earth Engineering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 8.
We estimate the traffic loading on the roadways would be
approximately 5 and 7 equivalent daily load axles (EDLA)for the
local streets and collector drives, respectively. The traffic
loads will need to be verified with City of Fort Collins
Engineering; that verification has been requested.
The 1986 AASHTO "Guide For. Design of Pavements Structures" was used
to help evaluate alternative pavement sections for this project.
A 20 year design life was evaluated for the pavements. Based on
the outlined analyses and soil and traffic parameters, recommended
pavement sections for the development roadways are provided below
in Table I.
TABLE I: RECOMMENDED PAVEMENT SECTIONS
Pavement Sections
Collector
Local
Streets
Streets
(EDLA = 7)
(EDLA = 5)
PCC Concrete
611
511
HBP with Aggregate (Composite)
HBP
311
311
Aggregate Base
1211
8t1
Composite with Stabilized Subgrade
HBP
311
311
Aggregate Base
411
411
Stabilized Subgrade
1211
1211
Asphaltic concrete for use in the pavements should be compatible
' with the City of Fort Collins requirements for IISC-111 or 11SC-211
blends. Aggregate base for use in the pavement sections should be
compatible with Colorado Department of Transportation (CDOT)
requirements for Class 5 or Class 6 base. The aggregate base
1
1
Eanh Engineering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 7
' percentages of silt. The moisture context of those soils should be
' lowered to develop stable subgrades. Lowermoisture contents would
also be appropriate for the essentially granular soils.
' Fill soils required to .develop the slab or pavement subgrades
should consist of approved, low -volume change materials, free from
' organic matter and debris. Based on our observation of the site
materials, it is our opinion the near surface cohesive and
essentially granular materials could.be used as low -volume change
fill. If off -site materials are used, those materials should have
a liquid limit less than 40 and a plasticity index less than 18 and
should contain a minimum of 15% fines, material. passing the number
200 sieve. Fill soils below floor slabs and pavements should be
placed in loose lifts not exceeding 9 inches thick, adjusted in
moisture content as recommended for the scarified materials and
compacted to at least 95% of standard Proctor maximum dry density.
Care should be taken after construction to avoid disturbing the
prepared subgrades. Subgrades which are disturbed by the
construction activity should be removed and replaced or reworked
in -place prior to placement of overlying pavements or floor slabs.
In addition, care should be taken to maintain the recommended
moisture contents in cohesive soil subgrades. .Materials which are
' allowed to become dry and dessicated or wet and softened, should be
reworked prior to placement of the overlying floor slabs or
° pavements.
PAVEMENTS
A Hveem Stabilometer R-value of 5 has been estimated for the site
' soils. Laboratory testing is being performed to more accurately
determine that value. That R-value was used for preliminary design
of the pavement sections. After laboratory testing is completed,
the preliminary pavement recommendations provided in this report
will be adjusted as appropriate.
9
Earth Engineering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 6
Exterior perimeter foundations and foundations in unheated areas
should be located a minimum of 30 inches below adjacent exterior
grade to provide frost protection. We recommend formed continuous
footings have a minimum width of 16 inches and isolated column
foundations have a minimum width of 30 inches. Trenched
foundations (grade beam foundations) could be used in the near
surface cohesive materials. If used, we recommend those trenched
foundations have a minimum width of 12 inches.
Care should be taken to avoid disturbing the bearing materials. A
portion of the site soils have high silt contents and may be easily
disturbed, especially if wetted. Materials which are loosened or
disturbed by the construction activities or soils which are wet and
softened or dry and dessicated should be removed from the
foundation excavations prior to placement of reinforcing steel and
foundation concrete.
The long term settlement of footing foundations designed and
' constructed as recommended above should be small, less than 3/4
inch.
' FLOOR SLAB AND PAVEMENT SUBGRADES
All existing vegetation and/or topsoil should be removed from
beneath the floor slabs and pavements. After stripping and
' completing all cuts and prior to placement of any fill, floor slabs
or pavements, we recommend the exposed soils be scarified to a
' minimum depth of 9 inches, adjusted in moisture content and
compacted to at least 95% of the material's maximum dry density as
determined in accordance with ASTM Specification D-698, the
' standard Proctor procedure. The moisture content of the scarified
soils should normally be adjusted to be within the range of plus or
minus 2% of standard Proctor optimum moisture. A portion of the
near surface materials at this site contain relatively high
PaM Mgineering Consultants, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 5
1
groundwater was on the order of 8 feet below ground surface at the
' time of boring. Fluctuations in groundwater levels can occur over.
time depending on variations in hydrologic conditions and other
conditions not apparent at the time of this report. Areas of
perched water may also be encountered in more permeable zones in
the subsurface soils at times throughout the year.
ANALYSIS AND RECOMMENDATIONS
FOUNDATIONS
Based on.the.materials observed at the borings locations, it is our
opinion the proposed single family residences could be supported on
conventional footing foundations. We recommend those foundations
extend through all existing vegetation and/or topsoil and bear in
' the natural, stiff lean clay with varying amounts of sand or loose
to medium dense silty sand. For design of footing foundations
.bearing in the natural, stiff to very stiff cohesive materials or
' loose to medium dense granular soils, we recommend using a net
allowable total load soil bearing pressure not to exceed 1,500 psf.
' The net bearing pressure refers to the pressure at foundation
bearing level in excess of the minimum surrounding overburden
t pressure; the "total load" refers to full dead and live loads. A
minimum dead load pressure of 500 psf should be maintained to help
offset the potential for movement which could occur through wetting
and drying cycles of the cohesive bearing materials.
' Zones of softer cohesive soils or looser granular soils were
occasionally encountered in the test borings. Care should be taken
during construction to closely evaluate all anticipated bearing
soils. If unacceptable soils or loose zones are encountered, the
foundation should be extended to bear below those materials or
overexcavation and backfilling procedures used to develop suitable
bearing. Recommendations concerning those procedures should be
' based on the actual conditions encountered.
Esnh Engineering Consultuas, Inc.
Harmony Crossing P.U.D.
December 1, 1993
Page 4
Approximately eight to ten inches of vegetation and/or topsoil was
' encountered at the surface at the boring locations. The topsoil
and/or vegetation was underlain by brown, light brown, and reddish
' brown lean clay with varying amounts of sand and/or silty sand with
varying amounts of clay. The lean clay was stiff to soft and the
essentially granular materials were loose to medium dense. Those
' materials generally extended to the bottom of borings at depths of
5 to 15 feet below present grades.
At boring locations B-28 and B-29, the granular soils were
underlain below depths of approximately 12 to 14 feet by highly
' weathered sandstone and/or apparent shale bedrock. The bedrock was
colored gray or brown and was poorly cemented or stiff. Those
' materials extended to -the bottom of these borings at depths of
approximately 15 feet below present site grades.
The stratification boundaries shown on the boring logs represent
the approximate location of changes in soil and rock types; in -
situ, the transition of materials may be gradual and indistinct.
Classification of the bedrock was based on visual and tactual
' observation of disturbed samples and auger. cuttings. Coring and/or
petrographic analysis may reveal other rock types.
WATER LEVEL OBSERVATIONS
' Observations were made while drilling and after completion of the
borings to detect the presence and level of apparent groundwater.
' Water level measurements were also completed in selected open
boring holes approximately two days after drilling. At the time of
the outlined measurements, free water was observed at depths of
' approximately 8 to 10 feet below present ground surface.
' Based on results of the ground water measurements and observed
moisture contents in the subsurface materials, it is our opinion
t
Harmony Crossing P.U.D.
December 1, 1993
Page.3
r�nh Engineering Consultants, Inc.
was estimated using a calibrated hand penetrometer and washed sieve
analysis and atterberg limits tests were performed on selected samples.
Remolded swell tests were also completed on a portion of these samples.
Two Hveem "R" values are being performed on representative samples of
near surface cohesive materials. Results of the outlined tests are
shown on the attached boring logs; results of the R-value tests will be
forwarded at a later date.
As a part of the testing program, all samples were examined in the
laboratory by an engineer and classified in accordance with the attached
General Notes and.the Unified Soil Classification. System, based on the
soil's texture and plasticity. The estimated group symbol for the
Unified Soil Classification System is shown on the boring logs and a
brief description of that classification system is included with this
report.
SITE AND SUBSURFACE CONDITIONS
The proposed Harmony Crossing P.U.D. will be located approximately 1/2
mile south of Harmony Road and west of Timberline Road in Fort Collins.
The project site is currently irrigated farm land. Existing site
drainage is towards the south and east with maximum difference in
surface elevations across the site on the order of 5 to 10 feet.
Evidence of prior building construction was not observed at the site by
EEC personnel.
A EEC field engineer was on site during drilling to observe and log the
materials encountered and adjust the sampling program as necessary to
obtain appropriate samples.for those materials. The EEC field engineer
developed written logs of the materials encountered based on visual and
tactual observations. The boring logs included with this report may
contain modifications to those field logs based on results of laboratory
testing and evaluation. Based on the results of the field and
laboratory testing, subsurface conditions can be generalized as follows.
--' _ FAnh Fsginmring Consultants, lnc.
Harmony Crossing P.U.D.
December 1, 1993
Page 2
EXPLORATION AND TESTING PROCEDURES
The boring locations were selected and established in the field by
Earth Engineering Consultants, Inc. personnel. The field locations
were established by pacing and estimating angles relative to
observable site features. Surface elevations were not determined
by EEC personnel. The .locations and elevations of the borings
should be considered accurate only the degree implied by the method
used to establish that information.
The borings were performed with a truck mounted, Dietrich D-50
drill rig.The boreholes were advanced using 4-inch nominal
diameter continuous flight augers and samples of the subsurface
materials encountered were obtained using thin -walled tube and
split -barrel sampling procedures in general accordance with ASTM
Specifications D-1587 and D-1586, respectively. In the thin -walled
tube sampling procedure, a seamless steel tube with a sharpened
cutting edge is pushed into the soil with hydraulic pressure to
obtain a relatively undisturbed sample of cohesive or moderately
cohesive material. In the split -barrel procedure, a standard 2-
inch O.D. split -barrel sampling spoon is driven into the ground by
means of a 140-pound hammer falling a distance of 30 inches. The
number of blows required to advance the split -barrel sampler is
recorded and is used to estimate the in -situ relative density of
cohesionless soils and, to a lesser degree of accuracy, the
consistency of cohesive soils. All samples obtained in the field
were sealed and returned to the laboratory for further examination,
classification and testing.
' Laboratory testing on the recovered samples included moisture content
tests for both thin -walled tube and split -barrel samples. The thin -
walled tube samples were tested additionally for unconfined compressive
' strength, Atterberg limits, swell/consolidation, percent fines and dry
density. The unconfined strength of appropriate split -barrel samples
SUBSURFACE EXPLORATION REPORT
PROPOSED HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
EEC PROJECT 1932048
INTRODUCTION
December 1, 1993
The subsurface exploration for the proposed Harmony Crossing P.U.D.
in Fort Collins, Colorado, has been completed. Thirty-three (33)
soil borings extending to.depths ranging from approximately 5 to 15
feet below present site grades were advanced to develop information
on existing. subsurface conditions in the proposed development area.
Individual boring logs and a diagram indicating theapproximate
boring locations are included with this report.
We understand the proposed Harmony Crossing P.U.D. will include 216
single family residential lots on an approximate 80-acre parcel.
It is expected the proposed residences will be one or two story,
wood frame buildings. We understand the lower levels of the
structures will extend to depths on the order of 5 feet below
existing site grades. Foundations loads for the proposed single
family houses are expected to be light with continuous wall loads
less than 2 kips per lineal foot and column loads less than 30
kips. Floor loads will be less than 100 psf. Maximum cuts and
fills (outside the building areas) of 3 feet are expected to
develop the site .grades. New site roadways will be constructed and
underground utilities will be installed as a part of the
development.
The purpose of this report is to describe the subsurface conditions
encountered in the borings, analyze and evaluate the test data and
provide geotechnical recommendations concerning design and
construction of the foundations and support of floor slabs and
pavements.
' Harmony Crossing
December 1, 1993
' Page 2
En rib Engineering consultants, Inc.
We appreciate the opportunity to
be of service to you on this
'
project. If you
have any questions
concerning the enclosed report,
or if we can be
of further service
to you in any other way, please
do not hesitate
to contact us.
1
Very truly yours,
' Earth Engineering... consultants, Inc.
`ac�`a fp0 R�,ba
moo. i
:Q
:
LestV �� `�itton, P.E.
Principal Engineer
1
1
1
Principal Engineer
Y � '
EARTH ENGINEERING
CONSULTANTS, INC.
December 1, 1993
Richland Homes, Inc.
8791 Wolff Court, Suite 200
Westminster, Colorado 80030
Attn: Mr. Jerry Rolhfs
Re: Subsurface Exploration Report
Proposed Harmony Crossing P.U.D.
Fort Collins, Colorado
EEC Project No. 1932048
Mr. Rolhfs:
Enclosed, herewith, are the results of the subsurface exploration
you requested for the referenced project. In summary, the soils
encountered in the test borings performed at this site consisted of
low plasticity cohesive materials with interbedded zones of fine
and fine to coarse grained essentially granular soils. Based on
the results of our field borings and laboratory testing, it is our
opinion the site materials could be used for direct support of
footing foundations for the proposed lightly loaded residences.
Those soils could also be used for direct support of floor slabs
and pavements.
Softer/looser zones were occasionally encountered in the overburden
soils so that care will be needed to see that footings are
supported on suitable strength materials. Also, apparent
groundwater was encountered at relatively shallow depths over a
portion of site and those groundwater conditions should be
considered during design of the development. Geotechnical
recommendations concerning design and construction of foundations
and support of floor slabs and pavements are presented in the text
of the attached report.
2600 Canton Ct, Suite A Fort Collins, CO 80525
(303) 224-1522 FAX 224-4564
I
SUBSURFACE EXPLORATION REPORT
PROPOSED HARMONY CROSSING P.U.D.
FORT COLLINS, COLORADO
EEC PROJECT 1932048
I
I
D
I
I
I
I
D
L
7