Loading...
HomeMy WebLinkAboutHARMONY VILLAGE PUD REPLAT NO 3 - 65 93G - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: 25 - 9f5(s- � 4j�Mor Tye s CwC, Planner: Tin Gt-� Fpag-� Engineer: i<aTi e m a*,— LL PL F?7' -* Traffic Operations: Date: U/. UZ , Dl Items Requested Site I land Plat I Utility I Drainage Rpt Other Items Required Engineering X Redlined Items Being Returned Site I Land Plat I Utility Drainage R t I Other Items Being Returned j Stormwater Water/Wastewate j Traffic Operations Trans. Planning Tramlbrt Natural Resources Park Planning Totals Other: Note: All redlined items should be returned with the resubmittal/ revisions. •• Revisions Routing Sheet • it ENGINEERING: PAVEMENT BUILDING INSPECITON m IN IN • ON IN IN IN ADVANCE PLANNING 1100 ����v��m����IN • IN IN WATER • �IN IN • • ON PUBLIC SERVICE m IN DITCH �����No���� ROAD , : mmmm�� �ONmmommmmmmmm mmmmmmm� WON mm iiiN� �� mmmmiiiIN R'TPI'R-r1-[