HomeMy WebLinkAboutHARMONY VILLAGE PUD REPLAT NO 3 - 65 93G - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: 25 - 9f5(s- � 4j�Mor
Tye s CwC,
Planner: Tin Gt-� Fpag-�
Engineer: i<aTi e m a*,—
LL
PL F?7' -*
Traffic Operations:
Date: U/. UZ , Dl
Items Requested
Site I land Plat I Utility I Drainage Rpt Other Items Required
Engineering X
Redlined Items Being Returned
Site I Land Plat I Utility Drainage R t I Other Items Being Returned
j
Stormwater
Water/Wastewate
j
Traffic Operations
Trans. Planning
Tramlbrt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
••
Revisions Routing Sheet
• it
ENGINEERING: PAVEMENT
BUILDING INSPECITON
m
IN
IN
•
ON
IN IN
IN
ADVANCE PLANNING
1100
����v��m����IN
•
IN
IN
WATER •
�IN IN
• •
ON
PUBLIC SERVICE
m IN
DITCH
�����No����
ROAD , :
mmmm��
�ONmmommmmmmmm
mmmmmmm�
WON mm
iiiN� ��
mmmmiiiIN
R'TPI'R-r1-[